High Current Cyclotrons for Future Neutrino Experiments

Slides:



Advertisements
Similar presentations
Machine Physics at ISIS Proton Meeting 24 th March 11 Dean Adams (On behalf of ISIS Accelerator Groups)
Advertisements

JYFLTRAP: Spectroscopy with multi-trap facility Facility Mass purified beams In-trap spectroscopy Future plans.
THE SMALL ISOCHRONOUS RING PROJECT AT MICHIGAN STATE UNIVERSITY J. Alberto Rodriguez.
ECPM 2006, Nice, France, 2-4 November DESIGN STUDIES OF THE 300AMEV SUPERCONDUCTING CYCLOTRON FOR HADRONTHERAPY Mario Maggiore Laboratori Nazionali.
Summary of Nufact-03 Alain Blondel NuFact 03 5th International Workshop on Neutrino Factories & Superbeams Columbia University, New York 5-11 June 2003.
HIAT 2009, 9 th June, Venice 1 DESIGN STUDY OF MEDICAL CYCLOTRON SCENT300 Mario Maggiore on behalf of R&D Accelerator team Laboratori Nazionali del Sud.
The High Intensity Proton Accelerator of the Paul Scherrer Institute.
Loss problems associated with the acceleration of radioactive beams and what we can do about it A.Jansson f fermilab Loss issues (and ideas for solutions)
Simultaneous Delivery of Parallel Proton Beams with the EURISOL Driver
The ISIS strong focusing synchrotron also at the Rutherford Appleton Laboratory. Note that ISIS occupies the same hall as NIMROD used to and re- uses some.
1 Searching for Sterile Neutrinos with an Isotope β-decay Source: The IsoDAR Experiment Mike Shaevitz - Columbia University Aspen Winter Workshop--New.
J-PARC Accelerators Masahito Tomizawa KEK Acc. Lab. Outline, Status, Schedule of J-PARC accelerator MR Beam Power Upgrade.
Calculation of the beam dynamics of RIKEN AVF Cyclotron E.E. Perepelkin JINR, Dubna 4 March 2008.
 -capture measurements with the Recoil-Separator ERNA Frank Strieder Institut für Physik mit Ionenstrahlen Ruhr-Universität Bochum HRIBF Workshop – Nuclear.
Design of an Isochronous FFAG Ring for Acceleration of Muons G.H. Rees RAL, UK.
January 5, 2004S. A. Pande - CAT-KEK School on SNS MeV Injector Linac for Indian Spallation Neutron Source S. A. PANDE.
Overview of Booster PIP II upgrades and plans C.Y. Tan for Proton Source group PIP II Collaboration Meeting 03 June 2014.
Radioactive Ion Beams CW 0.5 MW (for protons) 1 GeV (for protons) p to U Chiara, Manuel, Adam, HuiMay 2011, CAS, Bilbao.
Design Optimization of MEIC Ion Linac & Pre-Booster B. Mustapha, Z. Conway, B. Erdelyi and P. Ostroumov ANL & NIU MEIC Collaboration Meeting JLab, October.
Proton Source & Site Layout Keith Gollwitzer Accelerator Division Fermi National Accelerator Laboratory Muon Accelerator Program Review Fermilab, August.
1 New Compact Low Energy Neutrino Source using Isotope Beta Decay Mike Shaevitz - Columbia University Workshop on Low Threshold Detectors for Detection.
WG2 (Proton FFAG) Summary G.H. Rees. Proton Driver Working Group  Participants: M. Yashimoto, S. Ohnuma, C.R. Prior, G.H. Rees, A.G. Ruggiero  Topics:
Paul Scherrer Institut
Summary of Proposal RFQ Injection for High Intensity Neutrino Sources Janet Conrad Primary Reviewer Rick Baartman FY16 Intermediate Neutrino Research Progam.
M. Garcia-Sciveres July 2002 ATLAS A Proton Collider Detector M. Garcia-Sciveres Lawrence Berkeley National Laboratory.
2 July 2002 S. Kahn BNL Homestake Long Baseline1 A Super-Neutrino Beam from BNL to Homestake Steve Kahn For the BNL-Homestake Collaboration Presented at.
Polarized source upgrade RSC, January 11, OPPIS LINAC Booster AGS RHIC ( ) ∙10 11 p/bunch 0.6mA x 300us→11∙10 11 polarized H - /pulse. ( )
A monochromatic neutrino beam for  13 and  J. Bernabeu U. de Valencia and IFIC NO-VE III International Workshop on: "NEUTRINO OSCILLATIONS IN VENICE"
Accelerators and Sources Report from Discussion Session Jose Alonso 1.
F D F November 8, 2006Alessandro G. Ruggiero1 of GeV 10-MWatt Proton Driver Target 200-MeV DTL 1.0-GeV FFAG H – Stripping Foil Injection Energy,
© 2003 By Default! A Free sample background from Slide 1 JINR SCIENTIFIC COUNCIL 102 nd Session, September 2007, Dubna.
Cyclone 70 IBA Radiopharma’s high energy, high current cyclotron.
Proton Driver Keith Gollwitzer Accelerator Division Fermilab MAP Collaboration Meeting June 20, 2013.
News from the Sudbury Neutrino Observatory Simon JM Peeters July 2007 o SNO overview o Results phases I & II o hep neutrinos and DSNB o Update on the III.
…or a compact cyclotron to accelerate
 CC QE results from the NOvA prototype detector Jarek Nowak and Minerba Betancourt.
FFAG Studies at BNL Alessandro G. Ruggiero Brookhaven National Laboratory FFAG’06 - KURRI, Osaka, Japan - November 6-10, 2006.
A Compact FFAG for Radioisotope Production D. Bruton R. Barlow, R. Edgecock, and C.J. Johnstone.
Recycler Injection with Carbon Foils Dave Johnson, Alexandr Drozhdin, Leonid Vorobiev September 8, 2010 Project X Collaboration Meeting.
Measuring Nuclear Effects with MINERnA APS April Meeting 2011 G. Arturo Fiorentini Centro Brasileiro de Pesquisas Físicas On behalf of the MINERnA collaboration.
STATUS REPORT ON THE “MASHA” SET-UP A.M.Rodin, A.V.Belozerov, S.N.Dmitriev, Yu.Ts.Oganessian, R.N.Sagaidak, V.S.Salamatin, S.V.Stepantsov, D.V.Vanin PAC.
PSI, Zurich February 29 – March Session classification : Accelerator Concepts Tuesday, March 1, 2016 Introduction Vyacheslav Yakovlev Fermilab,
UK Neutrino Factory Conceptual Design
RIKEN Workshop on High-Power Heavy-Ion (q/A ≤ 0.5) Cyclotrons
SoLid: Recent Results and Future Prospects
G.CUTTONE LNS USER Meeting Oct. 30° 2012
Progress in the Multi-Ion Injector Linac Design
Injector Cyclotron for a Medical FFAG
MOMENT Overview Jingyu Tang Institute of High Energy Physics, CAS
A medium baseline superbeam facility in China
THE NEW DC-280 CYCLOTRON. STATUS AND ROAD MAP
PSI’s high intensity proton accelerator – an overview Mike Seidel, PSI
ADS Accelerator Program in China
Neutrino beams in China
FFAG Accelerator Proton Driver for Neutrino Factory
ELIC Injector Working Group High-P, high-I source issues (DC)
Collimation for beta-beams
LHC (SSC) Byung Yunn CASA.
An Anticyclotron For Cooling Muons
Pulsed Ion Linac for EIC
Beam Dump Experiments with Photon and Electron Beams
Determination of Neutrino Mass Hierarchy at an Intermediate Baseline
November 14, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
November 7, 2008 The meeting on RIKEN AVF Cyclotron Upgrade Progress report on activity plan Sergey Vorozhtsov.
Summary & Concluding remarks
Davide Franco for the Borexino Collaboration Milano University & INFN
Physics Design on Injector I
Joint session – Beta-beams
Status of the JLEIC Injector Linac Design
Multi-Ion Injector Linac Design – Progress Summary
Presentation transcript:

High Current Cyclotrons for Future Neutrino Experiments L. Calabretta, INFN-LNS, for the DAEdALUS collaboration Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 DAEδALUS: A Path to Measuring δCP Using Decay-at-Rest Neutrino Sources, by J. Conrad & M. Shaevitz Primary physics goal: searching for Decay At rest Experiment for δcp studies At the Laboratory for Underground Science CP-violation in the neutrino sector Short baseline nμ ne experiment with no matter effect novel design which provides high-statistics and low backgrounds Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013

is absent in the flux: look for its appearance! Shape driven by nature! Only the normalization varies from beam to beam is absent in the flux: look for its appearance! Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 Single Ultra large Detector With Free Protons as IBD (ne + p  e+ + n) Targets Three Identical Beams Workshop on Neutrino Telescopes, Venice 11-15 March 2013

The duty factor is flexible, but beam-off is needed. 2 ms 2 ms 8 ms 1.5 km Accelerators 8 km Accelerators 20 km Accelerators 800 MeV @ 5 MW 800 MeV @ 2 MW 800 MeV @ 1 MW To identify the source that produced the detected neutrino, the accelerators are driven with a 20% duty cycle: <2 MW> peak power 10 MW or higher The duty factor is flexible, but beam-off is needed. Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 Accelerator requirements in perspective AVERAGE power PEAK power ESS Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Cyclotrons: Viable technology? PSI is current world power leader in this energy range ~ 1.4 MW average, 590 MeV protons Extrapolation to higher power? Problems: Capture of more ions… space-charge at injection Clean extraction… max loss 200 W (~10-4) VIS source Superconducting Ring Cyclotron Normal conducting Cyclotron Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 Proposed Solution: H2+ ions Two protons for every ion (1 emA = 2 pmA) Perveance of 5 emA H2+ at 35 keV/amu same as 2 emA of 30 keV protons Axial injection of 2 emA protons at 30 keV is well within state of the art Extraction with stripping foil Clean turn separation is not needed, only high-acceptance extraction channel Workshop on Neutrino Telescopes, Venice 11-15 March 2013

The base cyclotron module for DAEDALUS is designed to deliver proton beam 10 mA @ 800 MeV duty cycle 20%, average power <1.6 MW> Superconducting Coils, Losses due to residual gas, Electromagnetic stripping Peak current 5mA of H2+ < 1 mA> H2+ 60 MeV/n <120 kW>/600 kW peak < 1 mA> H2+ 800 MeV/n 20%<1.6 MW> 8 MW peak Stripping extraction Space Charge effects, Electrostatic Deflectors Workshop on Neutrino Telescopes, Venice 11-15 March 2013

H2+ beam Stripper foil emerging protons electrons catcher Stripper foil: 5 MW beam @ 800 MeV Xing a stripper foil 1 mg/cm2 thick release  45 W due to nuclear interaction! The electrons removed by the strippers have a full power of 5 MW*Me/MH2=5/(2*1826)=1370 W ! Electrons are the main source of stripper damage But, electrons can be stopped before strike the stripper Stripper foil emerging protons H2+ beam electrons catcher If B=0.4 T Re=4.5 mm Stripper Thickness can be also thinner, because: H- =(p+e+e)  p, e, e is a two steps process (p+e+e) H + e  p, e, e H2+ =(p+p+e)p, p, e is a single step process, lower probability for H2+H + p The neutral H can be removed by an additional stripper foil, 10 cm later Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 DAEdALUS Superconducting Ring Cyclotron Space charge effects have negligible effects during acceleration in the ring cyclotron Vertical beam size along the acceleration in the radial range from 4 to 4.9 m, snapshot at 0° azimuth. The left figure has no charge space effects, 0 mA. The right figure is evaluated with a 5 mA beam H2+ current Simulation made by J. Yang and A. Adelman (PSI), using OPAL code Workshop on Neutrino Telescopes, Venice 11-15 March 2013

The radial size of the beam depend mainly by the energy gain per turn DE/E% phase (deg) Z (mm) R (mm) Histogram of 5 mA H2+ beam at the stripper foil position, simulation include space charge effects (OPAL code) Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Effect due crossing Walkinshaw resonance Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 Preliminary study of cryostat made by J. Minervini Group, @ MIT-PSFC arXiv.org > physics > arXiv:1209.4886 Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Electrostatic deflectors Injector Cyclotron 60 MeV/amu, peak current 5 mA H2+ Normal conducting coils ~ 4.4 meter coil diameter • Axial injection (spiral inflector) • Electrostatic extraction channel Extraction trajectory Coil Electrostatic deflectors arXiv: 1207.4895 Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Vertical beam size vs. turns number for different beam current 1 MeV/n 61.7 MeV/n Vertical beam size vs. turns number for different beam current Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 Deflector septum 0.5 mm thick Extraction efficiency 99.98%, if beam power is 600 kW on the septum 120 W! Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 Development Strategy With highly-complex projects: Develop phased approach Design phases such that good physics can be done with each In our case… Injector cyclotron can in itself be a “barn-burning” neutrino source The IsoDAR Project 10 mA (CW) proton at 60 MeV= 600 kW! Workshop on Neutrino Telescopes, Venice 11-15 March 2013

PhaseII: IsoDAR (Isotope Decay At Rest) Proton beam into neutron-producing target Secondary neutrons into ~50 kg pure 7Li blanket 8Li decay produces ne, high beta endpoint energy Good for discriminating background As with DAEdALUS, use IBD in liquid scintillator Good spatial, energy resolution _ 60 MeV, 600 kW ISODAR on PRL highlight GOAL: STERILE NEUTRINO SEARCH Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Oscillations can be seen within detector! Workshop on Neutrino Telescopes, Venice 11-15 March 2013

SNO+ also encouraging IsoDAR Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Injection test at “Best Cyclotron Inc.” site in Vancouver Phase I Is in progress Injection test at “Best Cyclotron Inc.” site in Vancouver Ion source Injector Cyclotron Superconducting Ring Cyclotron Target/Dump DAEdALUS Near site Mini Cyclotron Gate Valve slits, emittance meter, buncher VIS on HV Platform Solenoid Quads Solenoid Ion source VIS and its beam line leaved Catania harbour on February 15, now are traveling ocean Vacuum Pumps Workshop on Neutrino Telescopes, Venice 11-15 March 2013

beam injection in the median plane liner housing liner dee #2 spiral inflector dee #1 liner liner TS - magnet beam injection in the median plane Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 Phase III: SRC & Target/Dump, Ion source Injector Cyclotron Superconducting Ring Cyclotron Target/Dump DAEdALUS Near site Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 Phase IV: This is a tentative solution for the far site. Two injector cyclotron injecting in one SRC. Two beams are extracted at the same time by two different stripper foils to mitigate the power dissipation on the beam dump. Workshop on Neutrino Telescopes, Venice 11-15 March 2013

Workshop on Neutrino Telescopes, Venice 11-15 March 2013 Summary H2+ ions can be a key to high-power cyclotrons for many applications Compactness and relative lower cost of cyclotrons could open doors to several important neutrino experiments Exciting times ahead! Workshop on Neutrino Telescopes, Venice 11-15 March 2013

...And thats all folks! Thanks for your attention! Workshop on Neutrino Telescopes, Venice 11-15 March 2013