Status of the CO2 Cooling Project

Slides:



Advertisements
Similar presentations
1 Ann Van Lysebetten CO 2 cooling experience in the LHCb Vertex Locator Vertex 2007 Lake Placid 24/09/2007.
Advertisements

Pipes Single Wall Pipes Double Wall Pipes
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
CERN P186 Magnet cryogenic system update Yury Ivanyushenkov RAL December 7, 2004.
PRR TRD COOLING A. Marín (GSI) 7/01/2004 ALICE PRR TRD COOLING P.Glässel, A.Marín, V.Petracek, J.Stachel, M.R.Stockmeier, J.P.Wessels ALICE PRR TRD COOLING.
CO2 cooling pressure drop measurements R. Bates, R. French, G. Viehhauser, S. McMahon.
1 CO 2 cooling of an endplate with Timepix readout Bart Verlaat, Nikhef LCTPC collaboration meeting DESY, 22 September
27 January 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Mechanics and Cooling DEPFET Meeting Prag.
Status overview of the cooling 31 August 2015 Bart Verlaat, Raphael Dumps 1.
26 April 2013 Immanuel Gfall (HEPHY Vienna) Belle II SVD Overview.
Schedule and Work We are moving into a very intensive 4 months with a lot of work to be carried out Electrical services to the devices – after the South.
Arnaud Vande Craen (TE-MSC) 27/02/20131 EUCARD : ESAC Review – CEA Saclay.
26 May 2010Hans Postema - CERN Status and plan for the development and construction of CO2 Cooling System for Pixel Upgrade 1.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
CMS Pixels upgrade CO2 cooling transfer lines Draft spec – for introduction Paola Tropea & Hans Postema 5 December 2012.
CO2 cooling in CMS General overview 30 July 20101Hans Postema - CERN.
Update on Micro Channel Cooling Collaboration Meeting , G. Nüßle.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
IBL CO 2 cooling planning 03 July 2013 Jan Godlewski, Bart Verlaat, Lukasz Zwalinski 1
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
Installation of the T600 at Fermilab CSN2, September 22,
Cryogenic scheme, pipes and valves dimensions U.Wagner CERN TE-CRG.
IBL CO 2 cooling flexible transfer integration into IDEP 24 July 2013 Jan Godlewski, Bart Verlaat, Siegfried Wenig, Nicolas Massol, Tomasz Blaszczyk 1.
10 September 2010 Immanuel Gfall (HEPHY Vienna) Belle II SVD Upgrade, Mechanics and Cooling OEPG/FAKT Meeting 2010.
Status of the Marco chiller and Marco capacity analyses Bart Verlaat, Lukas Zwalinski, Maciej Osterga, Jan Godlewski MPI Munich,1 March.
,C. Kiesling, 10th BPAC Meeting, KEK, Japan, Feb. 7-9, VXD Commissioning Organizational Matters (in response to the BPAC October report) Overall.
C. Kiesling, B2GM PXD Session, KEK, March , Towards a Neural z-Vertex Trigger for the CDC News from the DEPFET Collaboration New Schedule.
Tracker cooling status General status Production: Manifolds, Distribution lines Work at P5 Plan Conclusions 19/05/091E. Focardi.
C. Kiesling, 7th Belle II VXD Workshop, Prague, Jan , VXD Cooling Requirements IBBelle Overview Commissioning at CERN (ATLAS version) Software.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
SVD IR mechanics status S.Tanaka SVD mechanics session.
7 February 2012 Annekathrin Frankenberger (HEPHY Vienna) Open CO 2 Cooling System at the beam test Belle II SVD-PXD Meeting.
SVD Status Markus Friedl (HEPHY Vienna) SVD-PXD Göttingen, 25 September 2012.
H.-G. Moser, PXD Workshop, Valencia, January 2016 IBBelle for VXD 1 Use one unit first Assemble on a platform which fits in a 20’ container No redundancy.
VXD mechanics issues S.Tanaka. Remaining issues (short term) SVD ladder mount table –Mount arm design(KEK+SVD) –Origami cooling pipe assembly procedure.
13 Januar 2011 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Cooling Cooling Meeting Karlsuhe.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institut für Experimentelle Kernphysik
C. Kiesling, BPAC VXD Mechanics Meeting, KEK, Sep. 8-11, Cooling Systems for the VXD Overview of Cooling Requirements General Principles of the.
H.-G. Moser, PXD, July 12, 2016 IBBelle: Status & Plans 1 2-phase CO 2 cooling system for PXD and SVD Minimal temperature: - 40 o C (intended: -30 o C)
MVD COOLING STATUS COOLING PLANT: -UPDATE of THE HYDRAULIC SYSTEM -INTEGRATION OF THE MVD COOLING CIRCUIT PATHS INSIDE THE PANDA AREA -DEFINITION OF THE.
H.-G. Moser, April 25, 2016 Gemba Summary 1 Plan: Shipment (sea transport in summer) 6-8 weeks => arrival August/September Commissioning: After October.
Florian Buchsteiner (HEPHY Vienna)
Demineralised water cooling system
Status CO2 Cooling IBBelle: Reconnection after Belle II Roll in
2016/12/6 Yasuhiro R&D status of a gas-compressor based 2-phase CO2 cooling system for FPCCD vertex detector 2016/12/6 Yasuhiro Sugimoto.
Teleconf ACS – FREIA 28th March 2017
IBBelle: Status & Plans
Installation of the T600 at Fermilab
Status of Cooling Development in Karlsruhe
Using the HEPHY CO2 plant in B1 room
ATLAS ITk Baby-DEMO update
Magnet cryogenic system update.
Design of the thermosiphon Test Facilities 2nd Thermosiphon Workshop
Update on the SVD construction
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Detector Cooling Project WP2 CO2 activities status report
Flexible lines production and planning
Prologue: Strasbourg Interest in BEAST
Forum on Tracking Detector Mechanics - Bonn, May 2016
PXD Summary Tests PXD9 Pilot Production ASICs Components Plans:
Hongyu Bai LCLS-II 2 K Cold Box FDR March 9, 2017
EHN1 Neutrino Installation Plans
Re-circulating CO2 Test System
Pixel CO2 Cooling Status
Recirculating CO2 System
ROD assembly and test in US
IBBelle: Status Commissioning at MPP Transport to KEK
XFEL Collimation and Beam Switchyard Vacuum Issues
CO2 Cooling IPNL Nick Lumb, 28/01/09.
Second Meeting of the Material Budget & Engineering Working Group
Presentation transcript:

Status of the CO2 Cooling Project Test CO2 System for PXD and SVD (“MARCO”) is being built at MPI with the help of Nikhef/CERN, DESY and Vienna MARCO (Multipurpose Apparatus for Research on CO2): 1kW unit - design of MARCO finalized by K. Ackermann (+ CERN) - frame (+ valves etc.) was done at CERN by MPI technician - now being equipped with pipe connections + all parts - after pressure tests transport back to CERN - electronics installation and commissioning at CERN After this: “IBBelle” (for ATLAS IBL and Belle II): 2kW unit (2 units foreseen for Tsukuba hall, what about Vienna ?) C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

Status of MARCO construction MARCO arrived on 22/12/11 Work on piping started on January 26, 2012 Piping now finished Waiting for some missing parts (chiller, flow meter etc.) Pressure and tightness tests at MPI in early April 2012 Transport back to CERN by mid April 2012 C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

Status of MARCO construction (cont.) C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

Status of MARCO construction (cont.) C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

Status of MARCO construction (cont.) Pressure and tightness tests in early April (no TÜV !) Transport back to CERN by mid April + pressure test! mid April C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

Next Steps Certification of MARCO will teach us a lot for IBBelle Pressure and tightness tests at MPI (no TÜV yet): - pressure test with 150 bar pressure - tightness test with 100 bar over 24 hours with negligible pressure drop - these tests are sufficient for CERN safety department We plan for a complete TÜV test and certificate when MARCO is back at MPI (after the commissioning at CERN) Reason: TÜV wants to certify an apparatus without any changes afterwards. Otherwise a new certification is necessary (this is similar to CE certification) Certification of MARCO will teach us a lot for IBBelle C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

Possible Location for the CO2 Cooling Plant CO2 bottles CO2 plants Can we have a balcony there ? C. Kiesling, B2GM Meeting, PXD Session, Nagoya, Jul. 6-9, 2011 C. Kiesling, B2GM, KEK, Mar. 14-17, 2012 7

Possible Location for the CO2 Cooling Plant (cont.) Floor plan for MARCO (like IBBelle) left in Tsukuba hall C. Kiesling, B2GM Meeting, PXD Session, Nagoya, Jul. 6-9, 2011

Possible Location for the CO2 Cooling Plant (cont.) foam insolation from IBBelle to the manifolds on top or on the sides of Belle II Vacuum insulation (double tubes) from manifold to the dry volume of the SVD/PXD C. Kiesling, B2GM Meeting, PXD Session, Nagoya, Jul. 6-9, 2011

Piping from the CO2 Cooling Plant to PXD/SVD C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

Piping from the CO2 Cooling Plant to PXD/SVD Start cold volume C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

First Work on Vacuum Tubes Done by student (Raoul Letschka) Test tube to the cooling block Cu tube 10 mm diameter Steel tubes, 2 mm and 3 mm diameter, vac ~10-3 mbar tested a 3 m assembly with liquid nitrogen (- 180 °C) C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

First Work on Vacuum Tubes (cont.) keep distance to Cu wall by plastic hose C. Kiesling, B2GM, KEK, Mar. 14-17, 2012

First Work on Vacuum Tubes (cont.) Conclusion: Vacuum isolation works well at lN2, Expected to even be better at -30° CO2 C. Kiesling, B2GM, KEK, Mar. 14-17, 2012