Audit Management: Audit Management consists of auditing the deliverables from the phases and tasks which is nothing but verifying the documents and to.

Slides:



Advertisements
Similar presentations
Belarus Denmark Estonia Finland Germany Latvia Lithuania Norway Poland Russia Sweden First level controls - Certification of Expenditure INTERREG IIIC.
Advertisements

Internal environmental audit - Conf.dr.ing. Oana Brinzan – UAV Arad.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Stock Audit in Shoper 9 February 2010.
Phase Difference = Phase Difference = 0.05.
University of Sunderland CIFM03Lecture 5 1 QMS implementation and management CIFM03 Lecture 5.
Quality Control Issues During Data Analysis Demographic Analysis Tom McDevitt, Population Studies Branch, International Programs Center, U.S. Census Bureau.
DMV’s Service Transformation Program AASHTO Auditor’s Conference Tom McClellan, DMV Administrator and Dawn Farr, Interim STP Lead Oregon Department of.
MARCH 1 Project Management AIM l to provide a broad and practical understanding of the practice of Project Management l to improve Project Management practices.
Software Testing. What is Testing? The process consisting of all life cycle activities, both static and dynamic, concerned with planning, preparation.
Project Schedule PLAN IT!. Project Schedule Project Schedule is based on Work Breakdown Structure (WBS) Define the WBS correctly or the Project Schedule.
Agenda Corrective/Preventative Action Internal Auditing Management Review.
The TEAC Audit Are the statements in the Brief accurate?  Select a target from the Brief  Describe how the target will be probed (the action taken by.
(SRS) SOFTWARE REQUIREMENT SPECIFICATION(SRS) 1. Topics to be discussed.. What is an SRS? Purpose of an SRS Who reads the SRS? Who writes the SRS? Characteristics.
Solutions Within Reach
Documentation Workflows D. Olson 13 Mar 2006 DRAFT.
Project Implementation, Closure, and Evaluation
Timeline and Milestones. The first step to any plan is thinking about a timeline. You want to know what needs to get done and when, to ensure that you.
Day 3 in the pmProject Management Project Management (PM) ADJUST.
RSA in Austria CEDR SG „Road Safety“ Eva M. Eichinger Copenhagen, April, 2004 Road Safety Audit in Austria Eva M. Eichinger, M.Sc., Ph.D. Federal Ministry.
Copyright © 2007 Pearson Education Canada 1 Chapter 11: Overall Audit Plan and Audit Program.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
Layered Process Audits Tommy Beheler Quality Manager The Timken Company’s Gaffney Bearing Plant.
1. Session structure Definition Actions Outputs Challenges Exercises Module 7 Verify WSP 2.
ACC 490 Week 3 DQ /ACC-490-Week-3-DQ-1 What are the two types of audit tests? What are some examples of each of.
Where We Are Now. Where We Are Now Project Oversight Project Oversight Oversight’s Purposes: A set of principles and processes to guide and improve.
SCT Project Management Issues
Module 7 Verify WSP Session structure Definition Actions Outputs
Software Configuration Management (SCM)
Registration Audit Escort & Managers Information
Software Verification and Validation
There, Their, They’re There, their and they’re are all words that sound the same, but have different meanings and are spelt differently. These are called.
Rejected Expense Lines or Report
Project Management Managing Project Execution
Background Mandated by DaimlerChrysler for all tier 1 suppliers
Status of certification as to ISO 14001
Oversight Chapter 16.
Funded by the Erasmus+ Programme EPP JO-EPPKA2-CBHE-JP Lina Tsakalou
SKADS Controller’s Meeting Timeline Annual Financial Report
Where We Are Now. Where We Are Now Project Oversight Project Oversight Oversight’s Purposes: A set of principles and processes to guide and improve.

برنامه‌ريزي منابع انساني
بسم الله الرحمن الرحيم الحمد لله رب العالمين وأفضل الصلاة وأتم التسليم
Copyright © Simon Wallace
Quality Department
Layered Process Audits
Background Mandated by DaimlerChrysler for all tier 1 suppliers
HMA Follow On Activities
DOE ASP 2016 Workshop 19-23Sep16.
Audit Findings Process
2018 Advantage Program Timeline Guide
National Provider Identifier

Quality Assurance Session 6.
FAIRTRADE TRAINING GUIDE FOR SMALL FARMERS’ ORGANIZATIONS
Background Mandated by DaimlerChrysler for all tier 1 suppliers
How to conduct Effective Stage-1 Audit
Ravanello Management Operating System
2017 Advantage Program Timeline Guide
Project Management 101.
An introduction into technical and functional testing
FEJF Meeting Day 1, 845a – Seattle, WA
Software Reviews.
Chapter 16 Oversight.
JAN ROOVERS ASSOCIATES, INC. Charlotte, North Carolina
Sample Management Operating System
Speaker’s Name, SAP Month 00, 2017
What is an Internal Quality Audit? What is an Internal Quality Audit?
Progress checking.
2016 Advantage Program Timeline Guide
Presentation transcript:

Audit Management: Audit Management consists of auditing the deliverables from the phases and tasks which is nothing but verifying the documents and to check whether the deliverables are correct or not and all the mandatory tasks and phases are completed properly. Audit status: =Not Audited =Ready for Audit/ Audit in progress =Audit Completed

Gate Management: Auditor… PHO D NE Task1 Task1 Phase A D NE Task 2 Task n Task n Auditor… Task1 Task1 Phase B Phase B Task 2 Task 2 Task 3 Task 3 Task n Task n

Auditor… PHO D NE Task1 Task1 Phase A D NE Task 2 Task 2 Task 3 Task 3 Task n Task n Auditor… Auditor… Task1 Task1 Phase B Task 2 Task 2 Task 3 Task 3 Task n Task n

Auditor… PHO D NE Task1 Task1 Phase A D NE Task 2 Task 2 D NE Task 3 Task n Task n Auditor… Task1 Task1 Phase B Phase B Task 2 Task 2 Task 3 Task 3 Task n Task n