11.2 Identify Risks The process of determining which risks may affect the project and documenting their characteristics This is an iterative process as.

Slides:



Advertisements
Similar presentations
Risk Identification Techniques
Advertisements

PROJECT RISK MANAGEMENT
Project Management Gaafar 2007 / 1 This Presentation is uses information from PMBOK Guide 2000 Project Management Risk Management* Dr. Lotfi Gaafar.
BSBPMG508A Manage Project Risk 11.3 Perform Qualitative Risk Analysis Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control.
Project Risk Management
Proprietary and confidential. © 2006 Perot Systems. All rights reserved. All registered trademarks are the property of their respective owners.
Project Based Risk Management Defusing a potential ticking time bomb
Managing Project Risk.
Project Management based on the Project Management book of knowledge Risk Identify, analyse and respond to risks Resources Make most effective use of human.
10.1 Identify Stakeholders
Managing Project Risk.
Project Risk Management Presenter: Phil Harman, PMP Executive Director for ZCS Internal PMO and Enterprise Project Management (EPM) Practice Manager September.
Part II Project Planning © 2012 John Wiley & Sons Inc.
BSBPMG506A Manage Project Human Resources 9.1 Develop Human Resource Plan The process of identifying and documenting project roles, responsibilities, required.
PRM 702 Project Risk Management Lecture #28
Project Risk Management. The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding.
Project Risk Management
4.2 Develop Project Management Plan
RISK MANAGEMENT PRESENTATION ASQ- GREATER HOUSTON SECTION 1405 Lila Carden, Ph.D., MBA, PMP University of Houston Instructional Associate Professor
Chapter 10 Contemporary Project Management Kloppenborg
BSBPMG407A Apply Risk Management Techniques 1 Apply Risk Management Techniques Project Risk Processes Part 2 C ertificate IV in Project Management
BSBPMG508A Manage Project Risk 11.4 Perform Quantitative Risk Analysis Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control.
MAGISTER ILMU KOMPUTER (M.Kom)
Risk Management Project Management Digital Media Department Unit Credit Value : 4 Essential Learning time : 120 hours.
Quick Recap Monitoring and Controlling. Phases of Quality Assurance Acceptance sampling Process control Continuous improvement Inspection before/after.
Centro de Estudos e Sistemas Avançados do Recife PMBOK - Chapter 11 Project Risk Management.
Project Management By: Dr Madhu Fernando Project Risk Management
SECTION 1 THE PROJECT MANAGEMENT FRAMEWORK
11.1 Plan Risk Management The process of defining how to conduct risk management activities for a project Detailed risk planning enhances the overall probability.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
Question Four: Project Risk Management PMBOK definition of Project Risk Project risk management is the art and science of identifying, analyzing, and responding.
Develop Project Charter
Risk Identification Techniques Interview with SME’s (Subject Matter Experts) Brainstorming Delphi Technique Nominal Group Technique Crawford Slip Analogy.
BSBPMG504A Manage Project Costs 7.2 Determine Budget Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of aggregating.
BSBPMG508A Manage Project Risk Manage Project Risk Project Risk Processes Part 2 Diploma of Project Management Qualification Code BSB51507 Unit Code.
PMP Study Guide Chapter 6: Risk Planning. Chapter 6 Risk Planning Planning for Risks Plan Risk Management Identifying Potential Risk Analyzing Risks Using.
BSBPMG501A Manage Project Integrative Processes Manage Project Integrative Processes Project Integration Processes – Part 1 Diploma of Project Management.
SOFTWARE PROJECT MANAGEMENT
Project Risk Management Planning Stage
11.2 Identify Risks The process of determining which risks may affect the project and documenting their characteristics This is an interactive process.
BSBPMG407A Apply Risk Management Techniques 1 Apply Risk Management Techniques Introduction to Project Risk C ertificate IV in Project Management
BSBPMG407A Apply Risk Management Techniques Apply Risk Management Techniques Project Risk Processes Part 1 C ertificate IV in Project Management
Introduction to Project Management Chapter 9 Managing Project Risk
BSBPMG407A Apply Risk Management Techniques Apply Risk Management Techniques Project Risk Processes Part 2 C ertificate IV in Project Management
Project Risk Management Sections of this presentation were adapted from A Guide to the Project Management Body of Knowledge 3 rd Edition, Project Management.
Project Management Processes for a Project Chapter 3 PMBOK® Fourth Edition.
12.1 Plan Procurement: Introduction
Chapter 11: Project Risk Management Information Technology Project Management, Fifth Edition.
PMP Study Guide Chapter 6: Risk Planning (Unit 8).
PRINCE2 and the PMBoK guide
9.1 Plan Human Resource Management
8.1 Plan Quality Management
Part II Project Planning.
Project Management – PTM712S
7.3 Determine Budget The process of aggregating the estimated costs of individual activities or work packages in order to establish an authorised cost.
8.3 Control Quality The process of monitoring and recording results of executing quality activities to assess performance and recommend necessary change.
11.1 Plan Risk Management The process of defining how to conduct risk management activities for a project Detailed risk planning enhances the overall probability.
11.3 Perform Qualitative Risk Analysis
Plan Risk Management Outputs T &T Inputs Project Management Plan
12.2 Conduct Procurements The process of obtaining seller responses, selecting a seller and awarding the contract The team applies selection criteria.
Chapter 11: Project Risk Management
CHAPTER11 Project Risk Management
Project Risk Management
PROJECT RISK MANAGEMENT
Part II Project Planning © 2012 John Wiley & Sons Inc.
CIS12-3 IT Project Management
Mumtaz Ali Rajput +92 – SOFTWARE PROJECTMANAGMENT Mumtaz Ali Rajput +92 –
Project Risk Management
Planning for Risk, Procurements, and Stakeholder Management
Presentation transcript:

11.2 Identify Risks The process of determining which risks may affect the project and documenting their characteristics This is an iterative process as new risks may evolve or become known during the project Participants in risk identification activities can include – Project Manager and Project Team Project Sponsor and Stakeholders Risk management experts Customers Subject Matter Experts Other Project Managers Occurs during Planning Initiation Planning Execution Close Monitor Control Adapted from PMBOK 5th Edition

11.2 Identify Risks Inputs to Identify Risk Risk Management Plan Cost Management Plan Schedule Management Plan Quality Management Plan Human Resource Plan Scope Baseline Activity Cost Estimates Activity Duration estimates Project Documents: e.g.: Project Charter Project Schedule Schedule network diagrams Issue log Quality checklists Initiation Planning Execution Close Monitor Control Adapted from PMBOK 5th Edition

11.2 Identify Risks Inputs to Identify Risk (continued) Stakeholder Register Procurement Documents Enterprise Environmental Factors: published information academic studies industry studies Benchmarking risk attitudes checklists Organisational Process Assets - Project Files Organisational and project process controls Risk Management Templates Lessons Learnt Initiation Planning Execution Close Monitor Control Adapted from PMBOK 5th Edition

11.2 Identify Risks Tools and techniques for identifying risk include - Questionnaires Interviews and Surveys Documentation Reviews Brainstorming Workshops Root Cause Analysis System or Process Flowcharts Assumptions Analysis Checklist Analysis Cause & Effect Diagrams SWOT Analysis Expert Judgement Influence Diagrams Risk Categories Lessons Learnt Industry Risk Frameworks Delphi Technique Adapted from PMBOK 5th Edition

11.2 Identify Risks Risk Checklists & Questionnaires Many organisations and certain industries have standard risk checklists and questionnaires that assist with the identification of the overall risk on a project, as well as the specific risks that may be applicable Assumptions Analysis Any assumptions that have been documented during the planning processes need to be analysed and included in the Risk Log. If any assumption does not prove to be true there will be impacts to project objectives, the risk of assumptions proving untrue must be evaluated. Risk Categories Many organisations and certain industries have standard risk categories which help to ensure that all risk areas are reviewed when undertaking risk planning Technical Marketing Human Resources

11.2 Identify Risks Delphi Technique Cause and Effect Diagrams Used to reach a consensus of experts – anonymous questionnaires that are then collated and recirculated for further comments. Cause and Effect Diagrams Used to identify the causes of risks. Source: www.hci.com.au 

11.2 Identify Risks Influence Diagram Graphical representations of causal influences, time ordering of events, other relationships between variables and outcomes. From PMBOK 5th Edition

11.2 Identify Risks SWOT Analysis Expert Judgement Standard approach used to identify risks and opportunities during business planning and marketing activities. Can also be applied to project risk identification. Involves the identification of an organisations Strengths, Weaknesses, Opportunities and Threats. Weakness and Threats may need to documented in project risk logs. Expert Judgement Many organisations will have specialised risk management teams that can provide expert assistance to projects in the planning and identification of risks. In very risky projects it may also be helpful to consult external subject matter experts. Industry Risk Frameworks Some industries, particularly Construction and Defence, have standard risk frameworks which are extremely helpful to project risk management.

Sample column headings in a typical Risk Register 11.2 Identify Risks Outputs of this process include – Initial entries on the Risk Register List of identified risks Potential risk owners List of potential responses Sample column headings in a typical Risk Register Risk ID Risk Category Risk Description Risk Owner Likelihood Impact Risk Rating Management /Mitigation Strategies Residual Likelihood Residual Impact Residual Rating Status Priority Adapted from PMBOK 5th Edition

Inclusions in Risk Register during Planning Risk ID Risk Category Risk Description Risk Owner Likelihood Impact Risk Rating Management /Mitigation Strategies Residual Likelihood Residual Impact Residual Rating Status Priority Risk Id Can be a simple as a number May relate to the risk category Used as a unique identifier may be an internal standard Risk Description Plain English explanation of the risk One to two sentences in length Ensures common understanding Risk Category Can be taken from industry frameworks Can be set at internal standards May need to be developed/tailored Ensures identification of all risks Assists with monitoring and control Risk Owner A specific person or role Ensures clear ownership of the risk Responsible for monitoring & control Adapted from PMBOK 5th Edition

Example – first part of Risk Register Risk ID Risk Category Risk Description Risk Owner MK001 Marketing Marketing may not be able to book the required advertising with the Fairfax group due to conflict of interest Brian Green HR001 Human Resources May not be able to obtain a qualified Plumber in the time available Fred Jones