GEM-TPC Status Report GEM-Trackers see MEC session (14:00 hrs)

Slides:



Advertisements
Similar presentations
Planar-GEM Trackers Bernd Voss Helmholtzzentrum für Schwerionenforschung GmbH (GSI)
Advertisements

Detector module development for the CBM Silicon Tracking System Anton Lymanets for the CBM collaboration Universität Tübingen, Kiev Institute for Nuclear.
Manchester 09/sept/2008A.Falou & P.Cornebise {LAL-Orsay}1 CALICE Meeting/ Manchester Sept 2008 SLAB Integration & Thermal Measurements.
ATLAS SCT Endcap Detector Modules Lutz Feld University of Freiburg for the ATLAS SCT Collaboration Vertex m.
Ties Behnke, LP, EUDET, Germany etc: Status Report. 1 The LP-TPC Fieldcage Project Goal: design, develop and build a field cage for a “Large Prototype”
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
N-XYTER Hybrid Developments Christian J. Schmidt et al., GSI Darmstadt JINR, Dubna, Oct. 15 th 2008.
AMS-02 tracker mechanics status of assembly and integration at UniGe Outer planes: - Tests of evaporator (cooling loop) integration - Tools to develop.
Module Production for The ATLAS Silicon Tracker (SCT) The SCT requirements: Hermetic lightweight tracker. 4 space-points detection up to pseudo rapidity.
Status and outlook of the Medipix3 TSV project
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
18 November 2010 Immanuel Gfall (HEPHY Vienna) SVD Mechanics IDM.
J A Hill – EID RAL 1-2 September EE End Cap Mechanical Design ECAL EE End Cap Engineering CMS-UK Collaboration Meeting Brunel University September.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
ALICE-LHCC Review May 14, 2001 Thomas C. Meyer/EP-AIT1 TPC Field Cage Progress Report Project Schedule Technical Progress & Prototyping Contractual Matters.
, T. Tischler, CBM Collaboration Meeting, GSI Status MVD demonstrator: mechanics & integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
Tariq J. Solaija, NCP Forward RPC EDR, Tariq Solaija Forward RPC EDR The Standard RPC for low  regions Tariq J. Solaija National Centre for.
, T. Tischler, CBM Collaboration Meeting, Split Status MVD Demonstrator: System Integration T.Tischler, S. Amar-Youcef, M. Deveaux, D. Doering,
GEM detector development at VECC Anand Dubey. 2-GEM detector tested with source symmetric mode of biasing scheme, (i.e. same voltage across both the GEMS)
Mechanical Status of EUDET Module Marc Anduze – 05/04/07.
Detector R&D for Muon Chamber Anand K. Dubey For VECC group.
CMX status and plans Yuri Ermoline for the MSU group Level-1 Calorimeter Trigger Joint Meeting CERN, October 2012,
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
EPS-HEP 2015, Vienna. 1 Test of MPGD modules with a large prototype Time Projection Chamber Deb Sankar Bhattacharya On behalf of.
1 HBD update Itzhak Tserruya DC Upgrades meeting, January 14, 2005 NIM paper II: Generic R&D ~ completed Full scale prototype construction Pending issues.
1 TPC R&D proposal from the WIS group I. Ravinovich WIS I. Ravinovich12/15/2015.
Pixel power R&D in Spain F. Arteche Phase II days Phase 2 pixel electronics meeting CERN - May 2015.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
M. Sannino for S. Cuneo - I.N.F.N. Genova1 Rich2 MAPMT Housing & Cooling Outdated designs and what is needed to get a final executive design Imperial College.
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
N- XYTER Front-End Boards Christian J. Schmidt, GSI Darmstadt 13. CBM Collaboration Meeting, GSI, Darmstadt, March 10 – 13, 2009.
CLIC Stabilisation Day’08 18 th March 2008 Thomas Zickler AT/MCS/MNC/tz 1 CLIC Quadrupoles Th. Zickler CERN.
1 HBD Commissioning Itzhak Tserruya DC meeting, BNL December 13, 2006 Progress from October 3 to November 28, 2006.
RICH2 support and cooling mechanics status update Massimo Benettoni July 30,
Status report on the development of a TPC readout system based on the SALTRO-16 chip and some thoughts about the next step Leif Jönsson AIDA Meeting Vienna.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
FEE Electronics progress PCB layout progress VHDL progress in TBU Prototype fixture for software 9th June 2009.
Technical Design for the Mu3e Detector Dirk Wiedner on behalf of Mu3e February Dirk Wiedner PSI 2/15.
Single-Phase ProtoDUNE Construction Planning Jim Stewart LBNC January 11, 2016.
Short Status Summary on the PANDA (-Prototype) GEM-TPC.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
WP10 General Meeting, Giovanni Volpini, CERN 1 December 2015 Test progress INFN 1.
WBS 1-7 System Assembly & Installation John Voirin August 10-11, 2011.
n-XYTER Hybrid Developments
Progress with System Integration of the CBM Silicon Tracking Detector
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
The GOOFIE detector as a Ternary Mixture Monitor
Some input to the discussion for the design requirements of the GridPixel Tracker and L1thack trigger. Here are some thoughts about possible detector layout.
Markus Friedl (HEPHY Vienna)
Technical Design for the Mu3e Detector
Results achieved so far to improve the RPC rate capability
Production ad Quality control of RPCs for the CMS muon barrel system
Performance of an Automated Water Based Cooling System for CBM MuCh
David Montanari / Johan Bremer Jun 11, 2015 Rev. 1
T1 Electronic status Conclusions Electronics Cards:
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
Mechanics for front-end Electronics Of T2K-II TPCs – A Few Conceptual Ideas D. Calvet, Irfu, CEA Saclay, Gif sur Yvette Cedex, FRANCE.
Vertex Detector Mechanical R&D Design Questions and Issues
Chamber Design and Integration RE3/1 and RE4/1
TPC Field Cage Progress Report
Status of n-XYTER read-out chain at GSI
Development of thin GEM readout structures
TPC Detector Control System
Status of the EUDET Prototype
(On Behalf of CMS Muon Group)
Limited Streamer Tube Project Summary
Status of MUCH Electronics
PANDA Forward Spectrometer Calorimeter (Shashlyk) status and plans
Presentation transcript:

GEM-TPC Status Report GEM-Trackers see MEC session (14:00 hrs)

GEM-TPC@PANDA/FOPI Collaboration Meeting Outline General issues Material research Field Cage Media-Flange Assembly (Supplies) Amplification-Flange Assembly (GEM Stack) Electronic-Flange Assembly (Pad Plane) Front-End Boards Cooling Structure Electrical Supplies Summary Overview GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

GEM-TPC@PANDA/FOPI Collaboration Meeting General Issues Status Legend: Successfully finished Neutral, with no influence on timeline Ongoing work, waiting for completion Critical, on hold, stalled Detector & Setup General: Actual CAD models put to the WebDAV (V14 of the FOPI GEM-TPC assembly) First part- & material list available (e.g. for simulations, still preliminary) Still no input on required precision and tolerances GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

Material investigations Outgasing & Aging Test Results: Negative - Severe damage! Detailed investigations in progress Status: Outgasing equipment severely damaged needs to be re-built & improved New detector fabrication started (+8w) New base-material purchase started (+4w, 4k€) Still >14 on-stock materials to be investigated (+2w/measurement) Outlook: New results not before May 2009 GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

Field cage Problems / Solutions Rohazell® with Kapton®/Al shield Kapton® reinforcement Material research: HV-stability tests negative, Surface discharges Status: Changes in layer stacking & composition 240 µm Kapton insulation layers foreseen Routing of HV & Gas to/trough FC to be rendered more precisely New type of Rohazell® foam improved features (cell diameter, surface structure, humidity, etc.) under test (+2w) material ordered (+4w, 2k€) Storage- & handling-tools + infrastructure under construction (+12w, 15k€) No off-the-shelf product Time line: Planned completion > June 2009 Voltage divider(s): SMD Resistor on Flexible PCB Staggered Stripline on Kapton® backside shifted by ½ (not visible) GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

Field cage Staggered Strips ‘Best’ layout: 1 mm Strip / Gap Large-Inhomogeneity problems solved Design work ongoing (+4w) Various offers ‘en route’ (+4w) Purchase pending (+8w, 3k€) Resistor chain Former problems with supplier solved purchase ongoing (6w, +2k€) Split chains in parallel (1..5 W) to cope with paired tolerances Cooling advisable but not feasible to be realized FEM simulations (E,FT,p) Balanced field configuration with equal material thicknesses FCi/FCo Residual field inhomogeneities O(cm) near the ‘edges’ Shows supremacy of a resistive-foil setup Fine-Strip Copper-on-Kapton layout as fall-back solution (n x100µm ‘thick’!) 3 mm GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

Field cage Resistive-foil Restarted design, material tests, market research Crucial design parameters Heat density & -dissipation Thickness & Resistivity-Homogeneity (solutions attacked, more questions emerging) Heating simulations look promising (5 W) Status Material R&D and purchase Still ongoing (may take months, distributed only in USA, alternatives will be addressed soon) Costs of ≈6..10 k€ not covered so far Tooling Construction & market research ongoing Costs of ≈15 k€ not covered so far GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

Flanges / Structure Assembly Status: Optimization on the structure complete (mass & shielding, gas- & supplies routing) Clamping fixture functional Back plane & Isolation cover under construction (+4w, 1k€) Monitoring developments stalled Material purchase ongoing (+4w, 2k€) Aging test outstanding (+8w) Time line: Planned completion > May 2009 Beam into the plane GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

GEM structures & support Assembly Status: Foils (2C) delivered recently … But: partially faulty Final flange to be produced (+4w) HV-Distribution PCB under construction (+4w) Isolation issues addressed Infrastructure: Tools in production (+2w) Local infrastructure ordered (+ 6w) Quality assurance: Lab tests pending (+6w) Full-scale QA stalled Costs not covered so far: 8 k€ GEMs . 6 k€ Structure, Tooling…-Material 10 k€ Infrastructure Time line: Planned completion > May 2009 Support flange HV Distribution PCB GEM stages Clamping fixture Exploded view Partial assembly GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

PadPlane & Support Assembly Status: PadPlane: Various modular designs developed options discussed intensively ready since months Pin-out on SAMTEC connector slightly changed Various offers available (11/14 suppliers disapproved) Ordering done (-8w, 5..6k€) Delivery pending (R&D-type, +6..8w) Heat screening required, under construction (+4w) (Rohazell/GRP sandwich) Flange & Assembly: Final flange to be produced (+4w, 1k€) Material purchase ongoing (+4w, 2k€) Aging test outstanding (+8w) Time line: Possible availability May 2009 GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

Electronic-Flange & Cooling Assembly Design: 46 slots for FEBs foreseen Integrated passive liquid cooling, thermal screening, LV distribution Dedicated sealing of inner FC Sensors foreseen (flowi,o, pi,o, Tn, HVn) Supply & distribution at outer periphery Overpressure valves (not shown) Status: Final parts delivered Customized sealing structures fabricated Needs refinement in details and testing Assembly pending Time Line: Planned completion > April 2009 Cooling pots LV-connectors (70A) Stabilizers & Media bridge GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

Front-End Electronic (FEBs) Status: nXYTER based 2 chip board delivered & set-up Lab-test revealed higher power consumption than originally quoted  improvement under investigation mid-term redesign required & attacked Signals from 90Sr seen Readout-Concept: In-beam: not attacked Lab readout: triggerable board addressed (‘EXPLODER’MBS) In-beam test pending Time Line: Future tests and use not foreseeable GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

General Overview Working Places Material tests (Aging, Geometry) Resistors: Concept Availability, Delivery QA & Selection GEM: Cu@Kapton® (2C) Outgasing/Aging (GRP support) Purchase & Delivery Structure: GR-PBT Tooling & Manufacturing (Timescale) Sensors: Read out concept Slow-Control Integration EC: Design (Calibration equipment) FEE: Basic concept Supply Setup / Tests Cooling: Operation conditions Heat dissipation Temperature Stability FC: Kapton®/Rohazell® sandwich structure Layout Concept (homogeniety) SAP (costs) Tooling / Manufacturing HV-/Heat stability PP: Kapton®/Rohazell® Mech.Stability HeatTransfer/-Shielding Purchase & Delivery Operation: Heat-Shielding/-FlowDetection GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

GEM-TPC crew members & tasks Andreas Heinz PadPlane, GEMs Jörg Hehner Aging tests Markus Henske Material tests, Sensors, Infrastructure, Purchase Volker Kleipa Front-end Jochen Kunkel Mechanics, drawings, simulations, assembly Christian Schmidt Front-end Sandra Schwab Part Production, Tooling Daniel Soyk Simulations Bernd Voss ‚All & nothing‘, ideas & concepts, project & logistics Jan Voss General mechanics, Material tests Joachim Weinert Part Production, Tooling

Backup Slides

Status Overview WorkPackages Milestone/Feature Status Next step Open questions / steps Support structure finished Material research ongoing delivery, aging tests Aging Overall Fabrication ongoing input & discussion Geometrical tolerances Field Cage ongoing delivery, tooling, test, … Kapton XC GEM ongoing test & assembly Quality assurance PadPlane ongoing delivery FEB ongoing in-beam test ReadOut Plane & ROC final finished Integration tasks Gas ongoing delivery HV ongoing integration LV ongoing integration Cooling ongoing integration DCS Controller system ongoing input & discussion Cabling ongoing integration Detailed cabling list required Sensors & Actuators Pressure ongoing assembly Over-Pressure ongoing assembly Temperature ongoing assembly Flow-Liquid ongoing assembly Flow-Gaseous ongoing assembly Oxygen under investigation purchase Water under investigation purchase Test beam-time Bonn Sensors ready freshly calibrated still needed FEBs ongoing see above successful ‘baptism of fire’ during ROC (SysCore/EXPLODER) ongoing test show some problems CBM beam time 09 / 2008 GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

GEM-TPC@PANDA/FOPI Collaboration Meeting General Issues Status Personnel/staff: Andreas Heinz former staff on fixed-term contract, now on free-lancing Volker Kleipa new member of the crew (electronic engineer) Rahul Arora will join end of March (PhD Student, MC-Pad Marie Curie) Funding: GSI DL-budget problematic & no PANDA money till today QA-procedure & Testing: On-site GEM-QA Full-scale test rig postponed (no budget, low-profile man power) Minimum setup in discussion On-site detector test-setup stalled, may be addressed in May (no budget, low profile manpower) GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009

Readout-End plate structures Cooling Open questions: Operational conditions  Simulations Feasibility  Tests Media Bridge ‚slap‘ option (others under investigation) GEM-TPC@PANDA/FOPI Collaboration Meeting March 3rd 2009