EU Tariffs Code Update Based on Refined Draft as of 30th October

Slides:



Advertisements
Similar presentations
Stakeholder workshop on tariff aspects of the draft CAM network code Brussels – 19 July 2011 Introduction.
Advertisements

Update on EU Tariff Framework Guideline Richard Miller UNC Transmission Workgroup 03/10/2013.
Draft Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network Benoît Esnault, CRE Presentation Workshop Ljubljana,
RIIO-T1 impact on allowed revenues and network charges 6 September 2012.
Consumer information under the new directives Chris Rowsell Senior policy adviser - consumer issues.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
2. EU Tariff Code – Emerging Issues. EU Tariff Code – ACER Feedback No.ACER Request/Issue 1Redefine Transmission Services Definition -Harmonised definition.
The big picture in the EU Managing conflicting objectives in tariff design Tom Maes, Vice-Chair CEER Gas Working Group Understanding the impact of regulatory.
European Developments: Capacity Transmission Workgroup 6th October 2011.
EU Tariff Code Update 23 rd June EU Tariff Code Update – early feedback  Informal ACER feedback:  Draft code not on line with FG and insufficient.
Markus Krug, Co-Chair CEER Workstream 20 th Madrid Forum 26 September 2011 Harmonised transmission tariff structures Framework Guideline.
Global Competitiveness in a Liberalised EU Energy Market Wim Groenendijk, Member of the Board Brussels, 22 November 2011 Gas infrastructure and Markets.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
PROPOSAL CAM PROPOSAL FOR HARMONISATION 14 th SG meeting Madrid 11 th July 2011.
Capacity allocation in natural gas transmission networks Framework Guideline (Pilot) Dr. Stefanie Neveling, ACER Workstream Co-Chair Walter Boltz, ACER.
Benoît ESNAULT Commission de Régulation de l’Energie 17th Madrid Forum Madrid, 15 January year network development plan ERGEG recommendations.
Benoît Esnault Commission de Régulation de l’Energie (CRE) - ERGEG 19th Madrid Forum, March 2011 Preparatory work for Framework Guideline Tariffs.
Asta Sihvonen-Punkka Director General of EMA Vice-Chair of ERGEG Baltic Electricity Mini-Forum 1 October, 2010 Jurmala ACER and regulatory empowerment.
1 May 2012CACM Network Code Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15 th May 2012.
Pamela Taylor, Head of European Strategy, Ofgem Madrid Forum, March 2011 ERGEG’s draft framework guideline for gas balancing.
Independence and powers of regulators: legal and institutional requirements Heinz Hilbrecht, Director, European Commission World Forum on Energy Regulation.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Madrid 24 th March 2009 OS Working Progress 9 th IG meeting.
European Developments Transmission Workgroup 3 rd May 2012.
DN Interruption Reform Transmission Workstream Mark Freeman 5 th April 2007.
Gas Transmission Charging Review: Final Capacity Charging Proposal Gas TCMF 14 th December 2006.
European Transparency Requirements - update Transmission Workstream 1 st May 2008.
Congestion Management
Public Consultation : main conclusions (1/2)
key regulatory issues in the Republic of Moldova 3rd Meeting of the Benchmarking Expert Working Group (BEWG) February 2017 Ladies.
Eastern European Partner countries
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
6/3/2018 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
INTERCONNECTION GUIDELINES
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
EU Implementation Programme
26th IG meeting 23th January 2014
Transmission Planning Code – Draft Document
2009 TSO Transparency Gas Regional Initiative North-West
Background and Process
Transmission Planning Code
Transmission Workgroup 4th October 2012
ACER’s view on the future role of the Gas Regional Initiative
Capacity Allocation and Congestion Management for Electricity Network Code ROME, 15th May 2012.
Network Code on Capacity Allocation Mechanisms (Reg.984/2013)
26th February 2015 Teleconference
The Incremental Proposal
EWRC-RAE MUTUAL PROJECTS
Gas Regional Investment Plan North West Europe 2013 Presentation for ENTSOG (November 26th 2013, Brussels) and GRI NW SG (November 28th 2013, Stockholm),
Incentives and Cross-border Cost Allocation in the Energy Infrastructure Package Benoît Esnault (CRE) Chair of the ACER Gas Infrastructure Task Force.
Capacity Methodology Statements: Impact of Mod 452
NTS Entry Charging Review Update
26th February 2015 Teleconference
2/23/2019 Second ACER-ENTSOG Report on the status of the implementation of the Balancing Network Code Dennis Hesseling Head of the Gas Department Bucharest,
Draft Capacity & Connection Plan
Information related to auction premium
Joint Office Presentation for Modification 0678
EU/GB Charging Project – Delivery Timescales
EWRC-RAE MUTUAL PROJECTS
EWRC-RAE MUTUAL PROJECTS
Entry Capacity Transfer and Trade
LNG Workshop Bilbao, March 13th 2009 GLE.
Ofgem presentation to Gas Transmission Workstream
ACER’s view on the future role of the Gas Regional Initiative
Indicators regarding the total revenue approved for the period October 2018 – September 2019 a) Total revenue approved by ANRE is allocated by the fix.
Information on accrual reconciliation account
EU CAM Network Code and CMP Guideline Proposal Update
Presentation transcript:

EU Tariffs Code Update Based on Refined Draft as of 30th October NTS Charging Methodology Forum 31st October 2014

EU Tariff Code Timeline Start 30/11/13 Finish 31/12/14 January March May September November PHASE 1: project plan & launch documentation development 30/11/13 - 31/01/14 PHASE 2: NC development 01/02/14 - 31/07/14 PHASE 3: NC decision-making 01/08/14 - 31/12/14 draft PP consultation 19/12/13 - 20/01/14 publish initial draft NC for consultation 30/05/14 initial draft NC consultation 30/05/14 - 30/07/14 refined draft NC to SSP 07/11/14 - 21/11/14 Deadline for ENTSOG to submit NC and accompanying document to ACER 31/12/14 formal starting date of NC process 01/01/14 kick-off WS 15/01/14 LD Publication 22/01/14 PP Publication 31/01/14 SJWS 1 11/02/14 SJWS 2 27/02/14 SJWS 3 14/03/14 SJWS 4 26/03/14 SJWS 5 09/04/14 consultation workshop 25/06/14 refinement WS 24/09/14 NC supported by stakeholders 21/11/14 NC supported by ENTSOG 17/12/14

Key Refined Definitions ‘allowed revenue’ means the total revenue that a transmission system operator is entitled to obtain for the provision of transmission services and dedicated services within a given time period under a non-price cap regime set or approved by the national regulatory authority;   ‘transmission services’ means the regulated services provided by the transmission system operator to all network users within the entry-exit system for the purpose of transmission;

Key Refined Definitions  ‘dedicated services’ means the regulated services other than transmission services provided by the transmission system operator to specific network users, or infrastructure operators, or at specific entry or exit points;  ‘regulatory account’ means the account aggregating under- and over-recovery of the transmission services revenue; 

Cost Allocation Methodologies Requirement to recover transmission services revenue “primarily” by capacity-based charges now amended. Requirement now is to recover by capacity-based charges and, subject to NRA approval, by commodity-based charges. Complimentary Revenue Recovery Charge Now purely a commodity based charge Unresolved issue re NRA assessment of cost-reflectivity, cross-subsidisation between IPs and non-IPs and ACER’s role.

Cost Allocation Methodologies Variant A of virtual point based methodology Now rewritten but slightly higher level Attempts to write more detailed version simply recorded GB approach including policy decisions within model But – Publication of “simplified” tariff models now in Code This should provide relevant transparency on methodology Rescaling: restriction now removed on application of rescaling where CRRC is used

Cost Allocation Methodologies Cost Allocation Test Text essentially unchanged from previous draft How this works for GB still a concern Should it be assessed in combination with CRRC test? Shorthaul No settled view to include (ENTSOG Board to decide) Text has been drafted to allow discounted tariffs to be applied (allows shorthaul and other products that have restrictions from standard tariffs) Some NRAs consider no explicit mention required in Code

Additional Publication requirements A simplified tariff model enabling the network users to calculate the transmission tariffs applicable for the current tariff period and to estimate their possible evolution in the following tariff periods Model to be accompanied by the explanations on how to use such tool. Or, sensitivity analyses enabling the network users to estimate the possible evolution of transmission tariffs in the following tariff periods.

Publication requirements Publication notice period for transmission tariffs changed: At least 30 days before beginning of tariff period (as before), plus “At least thirty days before  the annual yearly capacity auction, the transmission system operator or the national regulatory authority, as relevant, shall publish the  indicative reference prices and the binding multipliers and seasonal factors applicable for the tariff period following such auction”. 

Revenue Reconciliation Applies to transmission services revenue only “Single regulatory account” now “one regulatory account” Reconciliation carried out in accordance with the applied cost allocation methodology Text now amended to allow reconciliation to include adjusting the CRRC where relevant (i.e. to do the TO/SO split before applying the cost allocation methodology).

Fixed Price to be allowed at IPs  

Aims for including a fixed price Enhance stability of transmission tariffs while taking account of the contribution that the revenues originating from capacity sales under such approach provide for revenue recovery The objective of avoiding cross-subsidisation between network users; Promoting long-term contracts; Facilitating the offer of incremental and new capacity; Promoting financial stability of transmission system operators. Board decision required to ensure that IP can be fixed price only.

* i.e. a floating payable price Entry into Force 1 October 2017 or The first day of the month following the date calculated as twenty four months as from entry into force New line inserted re fixed price contracts: This Regulation shall not affect the price foreseen in the contracts concluded before entry into force of this regulation, where such a price is calculated in a way other than set out in Article 42(1)(a)* * i.e. a floating payable price