Workshop on Tau-Charm at High Luminosity

Slides:



Advertisements
Similar presentations
The Preassembling Installation Survey & Alignment Accelerator Center of IHEP Qu Huamin 2006 / 4 / 27.
Advertisements

The Comparison of API T3 and Leica AT401 in the Test and Survey CAI.Guozhu MAN. Kaidi Institute of Modern Physcis,CAS The 13 th international Workshops.
Metrology and pre-alignment of the components of CLIC in the PACMAN project S. W. Kamugasa, V. Vlachakis CLIC Workshop January 2015 CERN, Geneva,
Alignment of DB and MB quadrupoles Hélène MAINAUD DURAND 17/11/2011 With a lot of input from Sylvain GRIFFET.
Multipole Girders - Alignment & Stability (Multipole Girder Alignment technology & R&D) S. Sharma ASD: J. Skaritka, D. Hseuh, V. Ravindranath, G. Miglionico,
1 Long-term Variation of the Magnet Alignment In SPring-8 Storage Ring Main events of magnet alignment Long-term monitoring Variation of magnet alignment.
Wed 15 Jul 2009 ATF2 weekly meeting Oxford MONALISA 1 MONALISA at ATF2 First installation report 15 July 09.
Alignment Strategy for Light Source Facilities LCLS Case Catherine LeCocq SLAC 03/31/08.
October 20-21, 2005 Internal LCLS Undulator Alignment and Motion Review Catherine LeCocq, SLAC 1 Undulator Alignment Concept &
Wire Position System LCLS Undulator Alignment and Motion Review, Oct. 22, Franz Peters Wire Position System The Undulator.
Linac Coherent Light Source Stanford Synchrotron Radiation Laboratory Stanford Linear Accelerator Center LCLS Undulator Physics.
1 Institute of High Energy Physics 13/09/2010 Comparison and Study in Measurement Accuracy of Height Difference between Laser Tracker and Level Men LingLing.
Pre-alignment solutions applied to girders 1/19 Sylvain GRIFFET, 06/07/2010.
1 ILC Main Linac Alignment Simulations using Conventional Techniques and Development of Alignment Model John Dale LCWS08 & ILC08.
Metrology for NCSX Steve Raftopoulos and the NCSX Metrology Team.
ALIGNMENT DESIGN AND STATUS OF TAIWAN PHOTON SOURCE WEI-YANG LAI October,
Applied Geodesy Group Survey and Alignment of the ILC An approach to cost calculation and network simulations VLCW06 Vancouver, British Columbia, July.
Tilt meter fiducial Guide rail Abstract This poster covers the survey and alignment techniques selected for installation of the SPIRAL2 accelerator devices.
H. MAINAUD DURAND, on behalf of the CLIC active pre-alignment team MDI alignment plans IWLC2010 International Workshop on Linear Colliders 2010.
1/12 Sylvain GRIFFET, 17/10/2011 BE/ABP-SU/ Simulations of laser tracker AT401 measurements on TM0 CLIC girders EDMS Document No
1 BROOKHAVEN SCIENCE ASSOCIATES Abstract Magnet and Girder Integration Lewis Doom, NSLS-II Project National Synchrotron Light Source II (NSLS-II) will.
Fermilab Dr. O’Sheg Oshinowo IWAA2010 Conference DESY, Hamburg, Germany September 13-17, 2010 The NO A Experiment Gary Feldman Harvard University Survey.
Orbit Control For Diamond Light Source Ian Martin Joint Accelerator Workshop Rutherford Appleton Laboratory28 th -29 th April 2004.
BEPCII Prealignment Installation Survey and Alignment Accelerator Center of IHEP Xiaolong Wang
The Mission: In order to produce luminosities appropriate for Run II levels, a better understanding of the Tevatron’s orbit would be required. To do that,
CLIC survey and alignment 1 CLIC CES meeting STARTSLIDE CLIC SURVEY AND ALIGNMENT Hélène MAINAUD DURAND.
Technical Specifications for Monitoring Ground Displacements at a National Highway Project K. Lakakis, P. Savvaidis and I. Ifadis Laboratory of Geodesy.
ILC Main Linac Alignment Simulations John Dale 2009 Linear Collider Workshop of the Americas.
Survey, Alignment and Metrology Fiducials Requirements Fabien Rey ESS Survey, Alignment and Metrology Group ACCELERATOR TECHNICAL BOARD 23/09/2015.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group.
Survey, Alignment and Metrology Fabien Rey Pawel Garsztka ESS Survey, Alignment and Metrology Group Interface Workshops for ESS Warm-Linac: ISrc - LEBT.
CLIC Beam Physics Working Group CLIC pre-alignment simulations Thomas Touzé BE/ABP-SU Update on the simulations of the CLIC pre-alignment.
1 Stellarator Core Metrology issues NCSX WBS-1 Meeting April 2, 2003 What are we measuring? When? How do we take the measurements? How do we correlate.
Fiducialisation and initial alignment of components for CLIC Mateusz Sosin on behalf of the CLIC active pre-alignment team CLIC Workshop 2015.
S UPER B site status report S. Tomassini INFN-LNF On behalf of SuperB Collaboration SuperB general meeting– Frascati – December 1-5, 2009.
The NOnA Experiment Survey of the NOvA Far Detector Gary Feldman
Company LOGO Technology and Application of Laser Tracker in Large Space Measurement Yang Fan, Li Guangyun, Fan Baixing IWAA2014 in Beijing, China Zhengzhou.
KEKBSuper KEKB LERHERLERHER GAIN Energy (GeV) Half crossing angle (mrad) Holizontal emittance (nm) Vertical  -function.
1 BROOKHAVEN SCIENCE ASSOCIATES 12th International Workshop on Accelerator Alignment September 10-14, 2012 Fermilab, Batavia, Illinois, U.S.A NSLS-II Girder.
1 Research on laser tracker measurement accuracy and data processing Liang Jing IHEP,CHINA
CERN –GSI/CEA MM preparation meeting, Magnetic Measurements WP.
Alignment & Vibration Issues for SuperB M. Esposito, S. Tomassini, INFN-LNF SuperB Workshop – SLAC – October 7th, 2009.
WU Lei,WANG Xiaolong, LI Chunhua, QU Huamin Mechanical Group, Accelerator Division Institute of High Energy Physics 13 th International Workshops on Accelerator.
BINP tau charm plans and other projects in Turkey/China A. Bogomyagkov BINP SB RAS, Novosibirsk.
1 BROOKHAVEN SCIENCE ASSOCIATES 13th International Workshop on Accelerator Alignment October 13-17, 2014, IHEP, Beijing, China Smoothing Based on Best-fit.
Survey for SPL Dominique Missiaen BE-ABP/SU. Outline 12/11/2008 Dominique Missiaen BE-ABP-SU, Survey for SPL 2  Scope & Main Parameters  Technical Description.
CEA - Irfu – Mois 2011 – 1 Cavity-string alignment experience in the EXFEL prototype cryomodule assembly Michel Fontaine CEA – SACLAY DSM/IRFU/SIS TTC.
Ultra-low Emittance Coupling, method and results from the Australian Synchrotron Light Source Rohan Dowd Accelerator Physicist Australian Synchrotron.
Review of Alignment Tolerances for LCLS-II SC Linac Arun Saini, N. Solyak Fermilab 27 th April 2016, LCLS-II Accelerator Physics Meeting.
ALIGNMENT OF THE NEW TRIPLETS
SUPERB site status report for layout v12
on behalf of the CLIC active pre-alignment team
Application and Research on the 3-D adjustment of control network in particle accelerator Luo Tao
Recent developments on micro-triangulation
Dispersion Matched Steering and Alignment Model in Main Linac
The Primary Control network of HLSⅡ
Tolerances & Tuning of the ATF2 Final Focus Line
Background With new accelerators delivering beams always smaller and more energetic, requirements for very precise beam alignment become more and more.
Towards a common mechanical interface
Alignment challenges for a future linear collider
Mechanical system of CEPC
The Storage Ring Control Network of NSLS-II
Alignment of the first two magnet system modules of Wendelstein 7-X
On the accuracy of port assembly at Wendelstein 7-X
Preliminary design of foundation for HEPS
ILC Main Linac Alignment Simulations
INTRODUCTION OF GEOMATIC
Progress and plans, Mechanics system of CEPC
Undulator Alignment Plan
INSTITUTE OF HIGH ENERGY PHYSICS CEPC Survey and Alignment
Presentation transcript:

Workshop on Tau-Charm at High Luminosity Alignment M. Del Franco, E. Di Pasquale, S. Tomassini La Biodola, Isola d'Elba (Italy) 27-30 May 2013

CONTENTS Project Footprint Mission Tollerances and alignment implications State of the Art Alignment Network, Design & Survey Simulation & Analysis Conclusions

Preliminary FOOTPRINT

MISSION All measurement tasks require a fixed reference base (or datum) from which measurements can be made and calculated. For large-volume metrology applications, the reference base typically takes the form of a survey network that consists of a collection of target "nests" and/or instrument stations that have known geometry and uncertainty. The survey networks will cover the whole of the site, providing a global coordinate matrix for alignment and dimensional control. The accuracy requirements for each network vary according to the alignment tasks for which they are designed.

Alignment TOLERANCES? The required positioning tolerances are the key point of the survey and alignment network design. Those tolerances dictate the instruments and methods necessary to obtain the positioning goals. As an examples the NSLS II tolerances are shown. Relative tolerances Girder to Girder Magnet-to-Magnet Horizontal positioning ± 0.15 mm ± 0.03 mm Vertical positioning Longitudinal ± 0.50 mm ± 0.1 mm Roll angle ± 0.5 mrad ± 0.20 mrad Table 1: NSLS-II Girder-to-Girder and magnet-to-magnet Positioning Tolerances. Global tolerances ± 3 mm Horizontal positioning Vertical positioning Table 2: NSLS-II Required Global Tolerances. A similar table is expected from the -charm collaboration to design a dedicated alignment network

Let’s have a look on what has been done all around the world on the survey and alignment network design

J-PARC Japan Proton Accelerator Research Complex STATE OF THE ART Circumference 518,4m J-PARC Japan Proton Accelerator Research Complex Survey network GPS Circumference 3.9 miles (6.3 km) TPS Taiwan Photon Source

NSLSII National Synchroton Light Source II FERMILAB Fermi National Accelerator Laboratory NSLS-II covers an area of about one-eighth of a square kilometer with a radius of ~124 m and a circumference of ~780 m.) Circumference 3.9 miles (6.3 km)

Alignment NETWORK DESIGN & SURVEY We plan to set an alignment network along the accelerator tunnel. The alignment network is used as a reference for installing,locating or adjusting the accelerator devices. It can also be used to monitor the deformation of the accelerator alignment along with time. According to the major structure of the accelerator complex, the network can be divided into Primary Control Network 8 Monuments (Surface Network) 103 meters above sea level Scondary Control Network 15 Sight Risers (Tunnel Network) 94 meters above sea level The storage ring and linac monuments are accessible through penetrations in the roof wall shielding, Sight Risers

Primary Control Network Survey Two receivers Three receivers Seven receivers

Secondary Control Network Survey

Secondary Control Network Survey cont’ Monument section layout of a tunnel alignment network Survey scheme of an horizontal section

Instruments available @ LNF SURVEY & ALIGNMENT Instruments available @ LNF Laser Trackers Leica LTD 840 (±15µm+6µm/m) Leica LTD 500 (±10µm/m) Optical Instruments 2 Leica T3000 theodolites 2 Leica N3 levels Hall Probe & Rotating Coil Magnetic measurements for component fiducialization Stretched wires (WPS)

-charm case study Primary Network Secondary Network Only the outer reference points of the secondary network are visible.

Alignment network SIMULATION and ANALYSIS A wide range of metrology systems will be used during the assembly of the Tau-Charm machine such as laser trackers, total stations, which will interface with dedicated software packages and measurement plans specific to the Tau-Charm requirements.

VERY PRELIMINARY pREANALYSIS Number of Entered Stations = 23 Number of Azimuth/Bearing Observations (DMS) = 197 Number of Zenith Observations (DMS) = 29 Number of Distance Observations (Meters) = 36 Number of Angle Observations (DMS) = 29 VERY PRELIMINARY

Network Design Evolution @ Fermilab Full Network Preanalysis GPS+LT+Traverse+Levels

Vibration Tolerances SuperB Request (RMS vertical displacement for SuperB) Measured @ Tor Vergata (RMS vertical displacement) IP 300 nm 20-40 nm Final Focus 20-30 nm Arcs 500 nm Elsewhere 1000 nm

Instrumentations and Techniques Conclusions Lattice In order to obtain congruence between the survey network and the lattice layout provided by the machine physicist, the datum of both of these systems must be the same. The six parameters (x, y, z, yaw, pitch, and roll) provided by the lattice for each beam component must be used for all calculations to set the girders and other accelerator components. The database also contains the fiducial information of each component that needs to be placed. Civil Infrastructure Civil Infrastructure is closely related to Lattice and Machine tolerances. Instrumentations and Techniques Some specific tools or techniques may be taken into considerations in order to fulfill the alignment requirements Hydrostatic alignments Stretched Wire Systems Vibrating wires fiducialization Micro/nano positioning……..and so on

Thank you