Building H0209A (G007) (GAP Thorsten Ziglasch, Ina Schurig)

Slides:



Advertisements
Similar presentations
Technical Committees – the Brains of ASHRAE Section 1.0 — Fundamentals and General.
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
Lesson 3: Buying Electricity.  MUST understand how electric current transfers energy  SHOULD calculate the cost of energy used  COULD use appropriate.
Production of Ammonia Aims Explain the conditions in which NO 2 can be formed Describe the Ostwald process.
Engine Systems and Components
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Prospects of SC Quadrupole Production at IHEP-Protvino The 2nd Institutes Meeting on International Construction of the FAIR Accelerator Complex Protvino,
This courseware is copyrighted © 2011 gtslearning. No part of this courseware or any training material supplied by gtslearning International Limited to.
CSFL upgrade – status report. Purchased parts/ spares Red and white heat shrinks, Kapton tape, flat cable, spare diodes.
Accelerators for ADS March 2014 CERN Approach for a reliable cryogenic system T. Junquera (ACS) *Work supported by the EU, FP7 MAX contract number.
P2b(ii) Generating Electricity You will learn about: How electricity is carried How electricity is made Energy Efficiency
Why can’t heat be converted completely into work?.
VENTILATION PRINCIPLE FOR THE DRIVE BEAM TUNNEL M Nonis – EN/CV – 28/7/2009 Already presented by C. Martel/ J Inigo Golfin on15 th October 2008 CLIC WORKSHOP.
Thickness of the Kamaboko Tunnel Shield Wall under Different Assumptions Ewan Paterson Technical Board June 23,
7.4 Electric Lives 18 November 2015 You are buying a new TV, washing machine and fridge. What are the most important factors to consider when choosing.
Accelerator Design: the nuts and bolts…and gaskets and resistors Elvin Harms Beams Division/Fermilab
1 Thermal tests planning for mock-up TM0 Thermal tests planning for CLIC prototype module type 0 May 30th,
Heat Transfer Thermal energy Temperature is the average amount of energy of motion of each particle of a substance. Thermal energy is the total energy.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
V. Bobillier1 Cable installation status.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
FURNACE HEAT BALANCE CALCULATIONS A heat balance of a furnace is a means of determining the thermal efficiency of the process and comparing the relative.
WA 104 : TOOLS FOR WORK ORGANIZATION IN THE CLEAN ROOM Erwan Bertrand Olga Beltramello.
Electrical Circuits. Energy transfer in circuits Energy cannot be created or destroyed. In all devices and machines, including electric circuits, energy.
Power and Cooling 101 Technical Sales Training Michelle Wangler, Dale Estes and Chris Antaya.
High Voltage modulators ESS developments Carlos A. Martins ESS Accelerator Division, RF electrical power systems.
P. 1Mario Deile – TOTEMino: Status and Schedule Mario Deile Zone 2.Gas system 3.Cooling water 4.Cables 5.Safety 6.Schedule, Project Plan 7.Schedule.
ELENA installation progress F. Butin / ELENA collaboration.
Keeping water hot is a considerable ongoing expense for most homes - next to heating and cooling the house itself, heating water is the biggest energy.
NHS PAM Electrical Systems 2 nd June ) Policy & Procedures Does the Organisation have a current, approved Policy and an underpinning set of procedures.
PSB and PS test systems status. M. Haase September 14 th Finemet Review.
S A Griffiths CM42 June 2015 Electrical & Control.
Cable Trays Suppliers & Manufacturers in UAE
Architecture Supported by:
Chapter 1: Introduction to the Personal Computer
Matters arising RADWG - 3 July 2009
East Area Renovation Project Team meeting # 2 – EDMS News
CIIT-Human Computer Interaction-CSC456-Fall-2015-Mr
ARAC/H/F Air-cooled water chillers, free-cooling chillers and heat pumps Range: kW.
Electrical Systems Efficiency
Green Group Prayers Environment Week.
Delivering Risk Informed Engineering Programs (50.69) The OG Plan
HV-Cables Current standard product is RG-220/U like cables from Draka. Limited to max. 40kV Not compatible for CPS SF6 gas filled PFL.
Data Center Research Roadmap
Operational procedures and tools for scheduled shutdowns at CC-IN2P3
Meeting on Services and Power Supplies
4-3-1 Data Transfer. By the end of this topic you should be able to:-
Nearly the end of a long story...
TBM thermal modelling status
WP02 PRR: Master Oscillator and RF Reference Distribution
ADDRESS Interactive energy
Radiation-safe area for electronics, or laser or
Installation XFEL Tunnel WP 34
Instructor Materials Chapter 1: Introduction to the Personal Computer
Section 1.0 — Fundamentals and General
Business opportunities related to CERN electrical network
Welcome Stroma Certification Ltd Course Contents
TEST PLANS for HL LHC IT STRING
Undulator System Installation
Hardware & Software Developments
Producing Electric Current
BLM planning 24/02/2014.
Heat Transfer.
ARIEL Phase I Operations
PLC Hardware Components.
Conceptual Design of the Central Process Systems
Flex studies status. Module flexes: 4 types; M4, M2, M1plane, M1mountain. constraint: components and bondings on the same side. Constraining for the wing.
Renewable Energy Vocabulary
Rack installation and local tests for the MEBT Chopper Rack
Presentation transcript:

Building H0209A (G007) (GAP Thorsten Ziglasch, Ina Schurig) Current Status Activities Communication

Overview Building Cable Planning CPS and UPS Air- and Water Cooling Radiation Shielding Other Building Aspects Organization Aspects

3D model Building H0209A

E20 (3D)

E20 with Racks

E20 including racks (2D)

E10 (3D)

E10 including racks (3D)

E10 including racks (2D)

Building H0209A

Cable Planning All data is specified by the WPLs includes starting point (component) ending point (power rack) cable type and cable class connectors electrical current and voltage thermal energy many other special requirements

Cable Database

Cable Database

Cable Database

Cable Database

Cuts for cable trays & surveying

External Cable Planning

Internal Cable Planning

CPS and UPS WPLs provided their requirements for CPS and uninterrupted power supplies UPS All data ist collected to be able to combine the requested modules with the aim to limit the amount of CPS and UPS units process is still ongoing

Air- and Water Cooling

Radiation Protection E10

The Balcony

Cut Through The Balcony

Radiation Protection E20

Other Building Aspects

Other Building Aspects

Organizational Aspects WPLs define: Change Requests for all relevant changes No direct communication with the external planners – communication is done via FAIR S&B or Marianna Frech (Drees & Sommer) every 2nd week „Technik AG“ to discuss general issues concerning buildings & machines cables electrical power & heat loss data technical gases nomenclature of components # of IT-network plugs and telephones