IOM Iraq – Winterization

Slides:



Advertisements
Similar presentations
Goods Collection Project. Pakistan is flooded Homes are ruined.
Advertisements

Unit 4 Kit list Kit list Equipment Equipment Borrowing school kit Borrowing school kit.
16 th -17 th November 2006 | Geneva | co-hosted by UN-Habitat and CARE followed by Shelter updates: Volunteer, Register, Funding, Base Shelter Centre Shelter.
 WHO: CUBSCOUTS AND PARENTS  WHAT: CAMPING  WHEN:  Dates - Friday, 7 DEC 2012 to Sunday, 9 DEC 2012  Time - 1PM-5PM  WHERE: MACDILL AFB, see map.
CUB SCOUT PACK 20 CAMPING Ralph Jay Lupton, Jr. (813)
PERSONAL EQUIPMENT. TOILET ROLL (NOT FULL) FIRST AID KIT SUNCREAM PENCIL AND PAPER CAMERA INSECT REPELLENT TOOTHBRUSH AND TOOTHPASTE FOR PAN CLEANING.
STATESMAN Campers, Raising the standards. STATESMAN XP- 3.
BE PREPARED. Resources  Scout Handbook Scout Handbook  Merit badge books  Personal Check list Personal Check list  Web based check list  Camping.
Syria IDP Operation 2014 Valid as of 14 January 2014.
STATESMAN Campers, Raising the standards. STATESMAN XP- 1.
Campsite Inspection TOTAL Patrol: Date: Inspected by: CAMPSITE
1 Emergency and Transitional Shelter Concepts. 2 Definition of terms 1.What is “emergency shelter”? 2.What is “transitional shelter”? 3.What are “household.
CLUSTER SPECIFIC CASELOAD 5 TARGET GROUPS 1 IDPS IN CAMPS – 20% OF FAMILIES= FAMILIES 2 IDPS OFF CAMPS- 80% OF FAMILIES =
Responding to Crisis in Northern Iraq. Tens of thousands of displaced families have fled to Kurdish-controlled regions of northern Iraq following the.
MEDICAL SEMI-TEMPORARY STRUCTURES Examples of medical semi- temporary structures in MSF programs By Jérôme Michon and Yannick Garbusinski and Hugues Robert.
IFRC Global Logistics Service Dubai, 24 March 2014.
CUB SCOUT PACK 20 CAMPING.  WHO: CUBSCOUTS AND PARENTS  WHAT: Upper Tampa Bay Park  WHEN:  Dates - Friday, April 25, 2014 to Sunday, April.
Internal Frame Backpack 4500 cubic inch minimum Make sure it fits the Scout Backpack cover Make sure it fits over the entire pack and room for external.
NFI and shade booklet 1 South Asia earthquake Some exemple of MSF response 2 NFI Why NFI in MSF ? Working group New kits 3 Shade net Booklet The process.
Midterm Review of Housing and Shelter Sector 22 – 23 June 2009, Baghdad.
CHIANTI HUMANITARIAN ASSISTANCE COORDINATION CENTER Friday the 20 th of July.
Shelter Cluster Region VIII SUB – HUB: GUIUAN Eastern Samar and Marabut As of 06/01/2014.
Planning Scenario Planning figure: 1.8 million people displaced across Iraq since January Assessments in KR-I have identified 480,000 persons in.
Winter Camping Steve Allen Conference Commander Appalachian Conference, IPHC.
CCCM Cluster Meeting Kathmandu, 16 Oct Agenda Welcome and introduction Updating CCCM Strategy including coordination mechanism as per transition.
FOOD (1). 1. morning: breakfast 2. noon: lunch 3. evening: dinner.
FLOORPLAN shutters Front door roof fence garage garage door doorbell.
What The Heck Is It?!? Kitchen Lab Equipment. Bread Knife.
Kenya: Shelter NFI’s Agencies Mapping & Hubs Meeting briefing held at IOM offices on 21 Nov 2012 Presented by D. Musombi (IM)
SHELTER KITS. DESTRUCTION HAS MANY FACES TYPES OF DISASTERS  Floods  Cyclones  Earthquakes  Drought  Famine  Swell waves/tsunami  Landslides.
National Honor Society Leadership - Scholarship - Service - Character 02/01/2016.
THE BATHROOM BATHTUB MIRROR SHOWER CURTAIN SHOWER HEAD SINK COLD WATER
Sub-National Shelter & NFI Cluster Coordination meeting for C &S
Sub-National Shelter & NFI Cluster Coordination meeting for C &S
From: A Self-Sealing Suction Cup Array for Grasping
Sub-National Shelter & NFI Cluster Coordination meeting for KRI
Nigeria Factsheet–April 2017
Shelter Working Group Meeting Monday 16 June, 10AM
Kitchens BEGINNING ESL LESSON.
Sub-National Shelter & NFI Cluster Coordination meeting for C&S
Measuring Tools Kitchen Tip:
Cash-Based Interventions Technical Working Group Meeting
Sub-National Shelter & NFI Cluster Coordination meeting for C&S
Multipurpose Cash Grant
Sub-National Shelter & NFI Cluster Coordination meeting for KR-I
Multipurpose Cash Grant
Sub-National Shelter & NFI Cluster Coordination meeting for C &S
Sub-National Shelter & NFI Cluster Coordination meeting for KRI
Current Cluster Team Structure since 11th July 2017
1st Round Sector Defense
Cash-Based Interventions Technical Working Group Meeting
COX’S BAZAR HUMANITARIAN RESPONSE IN Situation report for Media
Sub-National Shelter & NFI Cluster Coordination meeting for C &S
Agenda Review of action points from previous meeting minutes (5mn);
Agenda Review of action points from previous meeting
Current Cluster Team Structure since 11th July 2017
Sub-National Shelter & NFI Cluster Coordination meeting for C&S
Household.
SEC 2 CAMP CORRI 2018 The details of the camp are as follows:
Green Seal Green Office Partnership
Agenda Review of action points from previous meeting minutes (5mn);
Current Cluster Team Structure since 11th July 2017
Climatic design This workshop will look the importance of understanding how climate variations will impact on planning and design Aceh, Indonesia, 2007.
Agenda Review of action points from previous meeting
Resource management This session will look at resource management, planning for changes in supply and demand and logistics Pakistan, 2006 (no notes)
HOUSE.
Housing house apartment.
Bronze Duke of Edinburgh’s Award Kit List
Crisis Management Response to Hurricane Maria
kitchen By using “Slide Show” “Custom Slide Show”,
Presentation transcript:

IOM Iraq – Winterization

IOM Options for Winterization Shelter/NFI Interventions Winterized Full NFI Kits Supplementary Winter NFI Kits Winterized Tent Liners Kerosene (through voucher) Prefabricated Shelter Units Sealing-Off/Partitioning Unfinished Buildings Rental Support Collective Center support Drainage, graveling of access roads, and building of plinths for tented sites

Stocks in Erbil Warehouse and Pipeline 8,000 Supplementary Winterization NFI Kits 2,000 Hygiene Kits* 1,750 Kitchen Sets* 2,000 Standard NFI Kits In Pipeline: 17,000 full winterized NFI kits to be distributed by Erbil Hub 8,000 full winterized NFI kits to be distributed by Basra Hub 7,750 winterized tents (deliveries in Oct-Nov) 2,500 winterized tents (deliveries in Oct) 500 Prefabricated shelter units to be installed in the Dawodiyah Camp in Duhok in coordination with UN-HABITAT

Supplementary Winterization NFI Kit Contents* Carpet 3X4m 1 Blanket winter type double layer 4 Heater Kerosene, Korean made Hygiene kit (Detergent 5 Kg, / Toothpaste (3.5 Oz.)  2 Tubes / Toothbrush 5 pcs. / Sanitary pad (12 pcs) 3 sets / soap 75 gm 12 pcs. / Razor disposable twin blade (5 pcs) 1 set) Plastic Sheet 4X5m *Contents of kit may change due to needs on the ground, procurement conditions, and coordination with partners. IOM kits all NFIs on site and can adapt the contents of a kit if necessary.

Full Winterized NFI Kit Contents Mattresses, local made, size; 200*80*10 with cover, 2.5 kg 4 Blanket, winter, high thermal, double-layer, made in China, woolen, size 190cm x 230cm, 3 kg Kerosene stove, 1 burner (10 wicks) 1 Kitchen Set: Bowl (3), Melamine Plates (3), Table Spoon (3), Table Knife (3), Table Fork (3), Cooking Spoon (2), Kitchen Knife (1), Plastic Cups (3) Hygiene kit: Tooth paste tube (2), detergent powder, (5kg), Tooth brush (5), Sanitary pad (30), Soap bar (12), Shaving razor (5) Kerosene heater, tank capacity 6 Liters Pillow Vacuumed Towel, 100% cotton Plastic Sheet, 4m x 5m

IOM Duhok Team and GEC Priorities Tents: Priorities for camps (to be coordinated with DMC). GECs will not endorse tents for IDPs residing in schools, and will act on case-by-case basis for out-of-camp tent distribution. Procedure: GECs will forward requests from Mayors for tent support to humanitarian agencies. In addition, all tent distributions must be endorsed by GECs. Unfinished Buildings: Most likely interventions will be tents, protective walls/safety barriers and sealing-off and partitioning. Fuel Voucher: GEC has agreed for IOM to provide fuel voucher support for residents of Shekhan Camp.