INTERNATIONAL BOUNDARY AND WATER COMMISSION

Slides:



Advertisements
Similar presentations
BINATIONAL COOPERATION WITH MEXICO ON COLORADO RIVER ISSUES Urban Water Institute August 15, 2013 Peter S. Silva, PE Consultant (SSI) Metropolitan Water.
Advertisements

Ecological and Recreational Flows Workgroup Colorado River Basin Water Supply and Demand Study Next Steps Urban Water Institute August 14, 2014 San Diego,
1. 2 Montlhy and biannually, USA provides information about forecast and status of Colorado River Basin. Since 2000, drought in the basin caused low levels.
10 th Conference on Applied Infrastructure Research “Institutional Models in Infrastructure Sectors – Conceptual Issues and Empirical Evidence” Friday,
Groundwater Management Districts Association Chuck Cullom Colorado River Manager CAP January 7, 2015.
California Integrated Waste Management Board 1 Permitting and Compliance Committee Agenda Item F (Board Item 5) September 8, 2009 Permitting and Compliance.
Cost-Effectiveness Analysis and a Border Region: A Critical Analysis Dr. James F. Booker Siena College New York, U.S.A. Prepared for the International.
WESTCAS - Shortage Impacts on AZ CAP General Manager David Modeer October 29, 2014.
Yuma Desalting Plant Plant Demonstration Run – Successes and Challenges.
Illinois Department of Natural Resources. Illinois Coastal Management Program Illinois was officially approved as a Coastal Management Program on Jan.
Colorado Basin Water Conference Dr. Tim Casey, Professor of Political Science Colorado Mesa University.
Colorado River Overview February Colorado River Overview Hydrology and Current Drought Management Objectives Law of the River Collaborative Efforts.
Responding to Drought (and other) Conditions on the Colorado River Urban Water Institute’s 21 st Annual Conference August 14, 2014.
August 23, 2012 Urban Water Institute August 23, 2012 Can the Colorado River meet our Region’s Future Water Supply Needs? Bill Hasencamp Manager, Colorado.
One Team Destined For Greatness US Army Corps of Engineers BUILDING STRONG ® Operations Division Mark Yuska Chief, Operations Division.
INTERNATIONAL BOUNDARY AND WATER COMISSION COMISIÓN INTERNACIONAL DE LÍMITES Y AGUAS Colorado River Joint Cooperative Proces Presentation to Urban Water.
Binational Desalination: Past Studies and Present Opportunities Tom McCann Manager, Resource Planning & Analysis June 20, 2008.
WaterSMART Basin Study Program. SECURE Water Act Section 9503 Directs the Secretary to establish a climate change adaptation program which includes –Assess.
United States and Mexico Chamber of Commerce Round Table “Opportunities for Growth and Sustainability” May 12, 2011.
NRCS Watershed Rehabilitation
International Boundary and Water Commission United States and Mexico Presentation to USGS Study Tour April 18, 2007 El Paso, TX.
Southern California Water Dialogue
IMPROVING P.A GOVERNANCE FOR LIVELIHOODS SECURITY: GLTFCA CASE STUDY.
Colorado River Basin Water Supply and Demand Study Next Steps: Agriculture Conservation, Productivity, and Transfers Workgroup Urban Water Institute Conference.
Columbia River Water Management Program (CRWMP) Review of Year One Upper Crab Creek Planning Unit Meeting April 17, 2007.
John J. Entsminger, General Manager Belts, Suspenders and Safety Pins: How America’s Driest City is Preparing for an Uncertain Future.
Water Administration and Law in New Mexico Border Governors October 21, 2005 Marilyn C. O’Leary Utton Transboundary Resources Center University of New.
LAKESHASTA LAKEOROVILLE Bay-Delta STATE WATER PROJECT (2.0 MAF) LOS ANGELES AQUEDUCTS (0.5 MAF) COLORADO RIVER AQUEDUCT (1.25 MAF) METROPOLITAN WATER.
EFFECTIVE, EFFICIENT, SUSTAINABLE SOLUTIONS TO COMMUNITY PROBLEMS THROUGH THE COLLABORATIVE EFFORTS AND RESOURCES OF CITIZENS, BUSINESS, GOVERNMENT, AND.
Colorado River Sustainability, Drought Response & Central Arizona Project Urban Water Institute August 27, 2015.
Urban Water Institute August 27, 2015 Managing the Colorado River during Drought.
Colorado River System & California’s Drought: an Overview Arizona League of Cities and Towns – Water Panel August 20, 2015.
Presenter: Sally Spener
April 27, 2011 So. Cal. Water Dialogue Southern California Water Dialogue April 27, 2011 The Colorado River: Partnering for success Bill Hasencamp Manager,
2. The risks of water insecurity Water Conflicts 2. The risks of water insecurity Water supply problems – Aral Sea Water conflicts – Middle East Water.
BUILDING STRONG SM Northwestern Division Presented by Lori Rux Chief, Program Support Division June 11, 2009 BPA Direct Funding for Corps Hydropower Projects.
By Siriparn Phongphaew Thitarat Sriwattanapong TNMC.
RIO GRANDE WATERSHED FEDERAL COORDINATING COMMITTEE (RGWFCC) BACKGROUND: Congressman Sylvestre Reyes formed the RGWFCC in response to the need for improved.
Renewable Energy in California: Implementing the Governors Renewable Energy Executive Order California Energy Commission Department of Fish and Game Fish.
1 Cameron Davis Senior Advisor to the Administrator, U.S. EPA Commission for Environmental Cooperation Joint Public Advisory Committee Public Forum on.
1 Water Cooperative of Central Florida Utilities Department Orange County Board of County Commissioners July 26, 2011.
Urban Water Institute Colorado River Lower Basin Issues Tanya Trujillo Colorado River Board of California February 10, 2016.
INTERNATIONAL BOUNDARY AND WATER COMISSION COMISIÓN INTERNACIONAL DE LÍMITES Y AGUAS Colorado River Water Users Association Edward Drusina U.S. Commissioner.
Colorado River Management. Examine the competing demands for water in a specific river basin. Evaluate the strategies that have been adopted to meet these.
Yuma Agriculture Water – Rights and Supply Yuma’s Agriculture Water: What You Need To Know Yuma Agriculture Water Conference January 13, 2016 Thomas Buschatzke,
Reclamation and Hoover Dam It’s All About The Water.
Growing Smarter Pennsylvania’s Land Use Agenda. Percent of Land Developed in Pennsylvania Source: Natural Resources Conservation Service, U.S. Department.
Strategies for Colorado River Water Management Jaci Gould Deputy Regional Director Lower Colorado Region.
Yuma Agriculture Water - Rights and Supply Terry Fulp Director, Lower Colorado Region Yuma Agriculture Water Conference January 13, 2016.
Recycled Water Salinity Reduction Policy Utilities Advisory Commission December 2, 2009.
Tom Buschatzke Director Arizona Department of Water Resources
2015 Urban Water Management Plan Overview
Roles and Functions of Basin & sub-basin organizations
Colorado River Commission of Nevada (CRCNV)
North Texas Municipal Water District “Regional Service Through Unity … Meeting Our Region’s Needs Today and Tomorrow” Water Supplies Vital for the Future.
The Colorado River Basin
John Martin Reservoir Master Plan Revision
Drought on the Colorado River System: Impacts and Response
Gila River Indian Community & System Conservation
Developing an Integrated
Improving Binational Water Management Policy through Science
WESTCAS 2018 Fall Conference October 24, 2018
Delta Risk Management Strategy
PILOT SYSTEM CONSERVATION PROGRAM
Environment & Resource Management
River Basin Organizations
Drought Contingency Planning Efforts
Water Directors meeting Spa, 2-3 December 2010
Resource Management and Climate Protection Committee Meeting:
Presentation transcript:

INTERNATIONAL BOUNDARY AND WATER COMMISSION MINUTE 319 AND BEYOND: U.S.-MEXICO COLORADO RIVER AGREEMENTS Edward Drusina, P.E., U.S. Commissioner December 16, 2016 Colorado River Water Users Association

IBWC MISSION The International Boundary and Water Commission, United States and Mexico, is responsible for applying the boundary and water treaties between the two countries and settling differences that arise in their application. The Commission is responsible for applying the boundary and water treaties between our two countries. Under the 1944 Water Treaty, the U.S. delivers Colorado River water to Mexico (1.5 million acre-feet per year during normal conditions and up to 1.7 million acre-feet during surplus).

IBWC BACKGROUND Permanent boundary commission established in 1889 Current Activities: Allot Rio Grande and Colorado River water Boundary Demarcation Flood control Water quality/sanitation Dams and hydroelectric power Structure U.S. Section Mexican Section Two Sections come together as an international organization Receive guidance from U.S. Department of State and Mexico’s Foreign Relations Ministry Our Commission is 126 years old although temporary Commissions go back 168 years. In addition to our Colorado River work, we are very involved in Rio Grande water supply issues, flood control, and water quality, among other matters. We have two Sections of the Commission, each part of its federal government. Although we are an independent federal Commission, we work through and receive our budget from the U.S. Department of State and likewise, the Mexican Section is allied with its Foreign Affairs Ministry. Amistad Dam on the Rio Grande

COLORADO RIVER AGREEMENTS 2010-2012 Minute 316 - Cooperative measures for Yuma Desalting Plant pilot run and Santa Clara Wetland in Mexico Minute 317 – Framework for U.S.-Mexico discussions on cooperative activities with state participation Minute 318 – Allows Mexico to postpone water deliveries until it repairs earthquake damage Minute 319 – Broad package of U.S.-Mexico cooperative activities A Minute is an agreement of the International Boundary and Water Commission that implements the treaty. It becomes binding on the United States and Mexico when approved by our respective foreign affairs ministries. Over the last several years, we have enacted several Colorado River Minutes in a conscious effort to improve transboundary cooperation and reduce the likelihood of conflict. Minute 317 established an official framework for state involvement in our discussions with Mexico. Through this framework, we were able to conclude Minutes 318 and 319. Yuma Desalting Plant

Minute 319 signing in San Diego, CA Signed Nov. 20, 2012 5-year agreement thru 2017 7 Sections Extension of Minute 318 High reservoir water sharing Low reservoir shortage sharing Intentionally Created Mexican Allocation (ICMA) like ICS Salinity Management Water for Environment and ICMA/ICS exchange pilot Projects Minute 319 signing in San Diego, CA Those of you who have attended the Colorado River Water Users Association over the past few years have heard Commissioner Salmon and I talk about Minute 319, the most significant of our recent Colorado River agreements. Minute 319 is a broad package of cooperative actions between the United States and Mexico. Some of its key elements are: Extended humanitarian measures of Minute 318 to allow Mexico to defer delivery of a portion of its Colorado River allotment while it made repairs to earthquake-damaged infrastructure. Would provide additional Colorado River water to Mexico during certain high elevation reservoir conditions at Lake Mead should additional water be available to users in the United States, providing benefits to both countries. Provided for proactive basin operations during certain low elevation reservoir conditions at Lake Mead by applying water delivery reductions in order to deter more severe reductions in the future. Established a program of Intentionally Created Mexican Allocation (ICMA) whereby Mexican water resulting from conservation and new water sources projects could essentially be held in the United States for subsequent delivery to Mexico. Implemented measures to address salinity impacts stemming from the joint cooperative actions. Through conservation projects, generates water for the environment of the Colorado River limitrophe and delta. Provides for U.S. investment in water infrastructure and environmental projects in Mexico. These investments provide water benefits to the U.S. agencies in exchange for their funding and generate water for Mexico over the long term. Outlines potential opportunities for future cooperation and projects between the United States and Mexico.

Minute Negotiating Group MINUTE 319 AND BEYOND Minute 319: “If by December 31, 2016, the Commission has not completed a comprehensive Minute that extends or replaces the substantive provisions of this Minute through no later than December 31, 2026, the Commissioners shall instruct their respective Principal Engineers to develop recommendations for a potential comprehensive Minute…” IBWC has been working on a new Minute starting at CRWUA in 2014 Minute 319 also laid out the expectation that we would conclude a new Minute by the end of this year. We’ve been hard at work on the new Minute since last year and we’ve made good progress on developing terms to take us through the next decade. Like Minute 319, we’re working on a package deal that includes benefits for both countries. Benefits like: Cooperation between the two countries over a range of potential future reservoir conditions, including efforts to prop up Lake Mead elevation. Investment in water conservation projects with water benefits accruing to both countries. Habitat restoration. And Operational improvements to benefit both countries. Minute Negotiating Group Mexico City, May 2016

MINUTE 319 AND BEYOND For those of you who are football fans, you know what the red zone is. It’s when you’re near the goal and have a strong chance to score a touchdown. Right now, we are in the red zone. The goal is right in front of us. Commissioners Salmon, Lopez, and I are coaching the same team. We can encourage and guide our players but only the team members on the field can move the ball across the finish line. Many people in this room are part of our team. You’ve been members of our work groups and have helped us develop a game plan that’s gotten us into the red zone. You’re considering how you might participate in a new Minute. Now we need your help getting into the end zone. Our best shot is right now, while we’re in the red zone. If we don’t score now and we end up in overtime, then there’s great uncertainty about how the game will turn out.

INTERNATIONAL BOUNDARY AND WATER COMMISSION USIBWC HEADQUARTERS El Paso, TX 915-832-4100 www.ibwc.gov