Winchester Lift Station Odor Control Project

Slides:



Advertisements
Similar presentations
RC Strategy Implementation. What we are asking for… Authorization to hire Black and Veatch to develop and issue the two RFPs associated with the RC Strategic.
Advertisements

Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
Capital Project Process
TOMMY OLIVER STADIUM John Bozarth February 23, 2016.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Recycled Water Pipeline Joe Mouawad Sr. Director of Engineering September 2, 2015.
GEOTECHNICAL & PILOT TESTING PROFESSIONAL SERVICES RECOMMENDATION Board of Directors – November 19, 2015.
1 EASTERN MUNICIPAL WATER DISTRICT Cactus II Feeder Transmission Pipeline Joe Mouawad, PE Sr. Director of Engineering September 2, 2015.
1 | emwd.org MV 2060 Pressure Zone Potable Water Storage Tank and Transmission Pipeline Joe Mouawad April 6, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Quail Valley Sewer Improvements Sub-Area 9, Phase 1 Joe Mouawad, P.E. Sr. Director of Engineering October.
1 | emwd.org AquaSel Brine Concentration Demonstration Project Khos Ghaderi, P.E. May 18, 2016.
Big Cypress Basin Capital Project Update Jeffrey Kivett, P.E., Director Operations, Engineering and Construction Division Jeffrey Kivett, P.E., Director.
Calcasieu Transportation Initiative February 2016.
Implementation of Housing Element Update of Housing Element City Council Meeting Tuesday, September 24, 2013.
Southeast Rail Extension FasTracks Monitoring Committee July 14, 2015.
CHANGE ORDER/CLAIMS MANAGEMENT MODULE 9. Change Order Management.
1 | emwd.org Indirect Potable Reuse (IPR) Public Outreach and Preliminary Design Services Joe Mouawad, P.E. and Jolene Walsh August 11, 2016.
1 EASTERN MUNICIPAL WATER DISTRICT Public Access Areas Renovation Project Debbie Hoffman, PE Civil Engineer II, Project Engineer July 1, 2015.
PROPOSED CITY OF STOCKTON WATERFORD ESTATES EAST PHASE II ASSESSMENT DISTRICT PUBLIC HEARING Stockton City Council January 6, 2004.
STOCKTON DELTA WATER SUPPLY PROJECT (DWSP) Final Environmental Impact Report (EIR) Certification Hearing November 8, 2005 Mark J. Madison, Director Municipal.
TVRWRF 23 MGD Expansion Disinfection System Conversion
Water Booster Station Improvement Study
Container Freight Station, Utilities and Drainage at Bayport Container Terminal (RFQ-148) Brenda Trevino, P.E. Project Manager October 11, 2016.
U.S. Air Force Cooperative Agreement for Perfluorinated Compounds Response Activities Jayne Joy, P.E. February 9, 2017.
Holly Street Bridge Retrofit and Rehabilitation Project
Capital Facilities Program Update San Rafael City Schools
Sanitary Sewer Lift Station Rehabilitation Design Services Pre-Submittal Meeting September 20, 2016.
Green Line Extension Project
Sun City Lift Station Odor Control Improvements
City of San Jacinto 7th Street Pavement Repairs
Light Rail Transit Project
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Cottonwood Recycled Water Pipeline (West)
Analysis and Calibration of Sewer Flow Tenant Type Factors
Audie Murphy Road Sewage Lift Station Award of Construction Contracts
Case Road Sewer Joe Mouawad, P.E. October 27, 2016.
Perris Water Filtration Plant Membrane Upgrade – Phase I
Santa Ana River Conservation and Conjunctive Use Program- Prop 84 Grant Funding Contract Kelley Gage March 9, 2017.
Amendment to the Cooperative Agreement with Elsinore Valley Municipal Water District for Upper Temescal Valley Salt and Nutrient Management Plan Jayne.
Pinole Valley High School (PVHS) Project Status
Sausalito Downtown Public Restroom
Memorandum of Understanding with GE Osmonics, Inc
College II Tank Interior Recoating Award of Construction Contracts
Capital Improvement Program Annual Report – 2016/17
SJVRWRF Dewatering Building Corrosion Remediation
Manual on Accommodating Utilities in Pierce County Rights-of-Way
Valley & Third Streets Redevelopment
Civic Center Sports Field Study Session & Quarterly Update
Cost of Service Analysis & Rate Design
Mountain Avenue West Recharge Basin Project
Phase 3 Solar Renewable Energy Initiative - Site Improvements
Reach 4 Air Valve Replacements Award of Construction Contracts
Santa Ana River Conservation and Conjunctive Use Program: Program Development Phase Costs Brian Powell, P.E. 8/17/2016.
City-wide LED Street Light Conversion Program
Elaborating The Committee Charter:
THE ROLE OF THE PLANSET IN CONTRACT DOCUMENTS
General comments: These projects are locally owned and the LPA should be involved and informed throughout the project. The project agreement is between.
Architectural Services RFQ
PROJECT DELIVERY METHODS
Galt Court Water Main Replacement
Introduction DEFINATION :-
Delta Water Supply Project
On-Call Project Management Professional Services
WSUP (Lightning W Tank #2)
STATE ROAD 61/369 CRAWFORDVILLE HIGHWAY
White Flint North Entrance Feasibility Study
Contract Award for the Colorado Street Bridge Suicide Mitigation Enhancements Project City Council May 20, 2019 Item # 7.
DEVELOPMENT IMPACT FEES AB 1600 UPDATE
Brieana Reed-Harmel, Broadband Project Manager
Presentation transcript:

Winchester Lift Station Odor Control Project Joe Mouawad, P.E. May 23, 2017

Location Map and Background WINCHESTER LIFT STATION Existing facility was constructed in 1997 Temporary odor mitigation measures currently in place Land use in the immediate vicinity has changed since the station was first constructed

Project Considerations New housing tracts with school and park soon to be built adjacent to Winchester Lift Station Need to implement permanent odor control system Design approach based on Sun City Lift Station Odor Control System Evaluate and mitigate visual impact of the proposed odor control system equipment SIMPSON RD. LA VENTANA RD. PROPOSED DEVELOPMENT TR31100 LA VENTANA RANCH TOWN OF WINCHESTER School and Park Site OLIVE AVE. Winchester Lift Station

Winchester Lift Station Odor Control Project Scope of Work Construct and operate a horizontal biotrickling filter system, with building-like façade screening of odor control equipment to minimize visual impact Coordinate perimeter walls replacement and access gates relocation with developer Replace existing wet well hatches to seal in odor for treatment Test and repair existing wet well liner Similar odor control system successfully implemented at Sun City Lift Station

Engineering Consultant Selection Consultant Selection Criteria Qualifications and experiences Past successful odor control project design Expedited design schedule Proposal commensurate with the level of effort Black & Veatch was selected to complete preliminary design Knowledge of the project Recognized experts in odor control system design and construction Black & Veatch is recommended for the final design engineering work for its expertise, continuation of the project design, and reasonable cost proposal

Scope of Work Geotechnical investigation Design to meet AQMD permitting requirements Complete 100% final design and technical specifications for bidding Building-like façade screening and odor control system illustration for communication with developer Construction estimate Engineering services during bidding

Cost Estimate Final Engineering Design Spec Review and Bid/Award Geotechnical Study Building-like Façade Screening Illustration Engineering Services During Bidding Engineering Branch Labor/Permitting Spec Review and Bid/Award Additional Appropriation $215,000 $15,500 $230,500 Funding previous approved for acoustic and engineering design Engineering Services During Construction Schuler Constructors Inc.’s Bid Proposal Project and Construction Management cost Contingency TOTAL PROJECT COST:

Project Schedule Final Design Completion Construction Bids Due and Recommendations Board Approval/Notice to Proceed Construction Commencement Substantial Completion February 2018 April 2018 June 2018 January 2019 Funding previous approved for acoustic and engineering design Engineering Services During Construction Schuler Constructors Inc.’s Bid Proposal Project and Construction Management cost Contingency TOTAL PROJECT COST:

Recommendations Approve and authorize the execution by the General Manager, or his designee, of a professional services agreement with Black & Veatch, San Marcos, California, for final engineering services in support of the Winchester Lift Station Odor Control System Project, in the amount of $184,977; and Appropriation of $230,500 to fund project costs through construction bid/award phase.

Contact Information Joe Mouawad, P.E. Assistant General Manager Planning, Engineering, and Construction (951) 928-3777 Ext. 4463 Email: mouawadj@emwd.org