SVD Ladder assembly at IPMU

Slides:



Advertisements
Similar presentations
A Low Mass On-chip Readout Scheme for Double-sided Silicon Strip Detectors 13th February 2013 C. Irmler, T. Bergauer, A. Frankenberger, M. Friedl, I. Gfall,
Advertisements

April 20, 2007Workshop on Silicon Detectors Systems for the CBM experiment 1 Wire-bonding interconnections Our experiences at the ASIC-Lab Heidelberg.
Milestones and Schedule of SVD Construction Markus Friedl (HEPHY Vienna) on behalf of the Belle II SVD Collaboration BPAC October 2012.
Striplet option of Super Belle Silicon Vertex Detector Talk at Joint Super B factory workshop, Honolulu 20 April 2005 T.Tsuboyama.
Atsuhiko Ochi, Kobe University 18/03/2015 RD51 CERN.
CMS Tracker Week, CERN, July July 2003Tracker Week - Module ProductionSalvatore Costa - Catania Executive summary from Bonding WG Meeting.
Sensor and ladder and dimensions dateChangeVersionwho 3/26/2013Updated with U2 fid positions 1.1LG.
Alpha counters for low background measurement
Do Now Two people exert a 10 Newton force for 2 meters. Person 1 exerts the force at a 50 degree angle. Calculate the work done on the box by each person.
SI Units.  Students know how to… ◦ convert between °C - °K ◦ Analyze situations/solve problems combining and applying concepts.
ALICE Silicon Strip Detector Module Assembly with Single-Point TAB Interconnections 1) Introduction 2) Collaboration 3) ALICE SSD module 4) Assembly phases.
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
Current status of Laser development 2nd Korea - Japan Workshop on KAGRA 2012/5/28(Mon)
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Jigs and procedure for ladder assembly BelleIInote #8 6 th Feb 2012 Yoshiyuki Onuki University of Tokyo 1.
Construction and Test of the First Belle II SVD Ladder Implementing the Origami Chip-on-Sensor Design 29 Sept TWEPP 2015, C. Irmler (HEPHY Vienna)
Status report on the Asian Solid State Tracking R&D March 31, 2003 M. Iwasaki University of Tokyo.
Levers in the Body PH 532 EQ: How does your body work as a machine?
L. Greiner 1IPHC meeting – May 7, 2012 STAR HFT Plans for the next year A short report on HFT/PXL plans for post May 2012 TPC – Time Projection Chamber.
BUDAPEST UNIVERSITY OF TECHNOLOGY AND ECONOMICS ELECTRONICS TECHNOLOGY DEPARTMENT Final Report Rev.: Dr. László Jakab, László Milán.
Report from Florence Bonding of Modules L12p Mirko Brianzi 20 April 2004.
Possible types of module Si/W CALORIMETER CONCEPT Si/W CALORIMETER CONCEPT G.Bashindzhagyan Moscow State University June 2002 Internal structure (not in.
Pull testing procedure. F ff ѲѲ 2f sin Ѳ = F If sin Ѳ = 30° then f = F If the angle of the 1 st and 2 nd bonds is 30° then the force we measure equals.
July 20, 2007Anita Topkar, BARC PSD Production: Present Status Dr Anita Topkar BARC.
1 Kazuhiro Yamamoto Institute for Cosmic Ray Research The university of Tokyo LCGT internal review (Cryogenic payload) 30 January 2012.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
Comments on ladder structure 5 Feb Toru Tsuboyama.
CMS Tracker Week, CERN, April Apr 2005CMS Tracker Week - Bonding WGSalvatore Costa - Catania Salvatore Costa Bonding in CATANIA Università.
2 Oct C. Irmler (HEPHY Vienna) BPAC Preparation and SVD Schedule 6 th Belle II VXD workshop.
Overview SVD 21 Jan C. Irmler (HEPHY Vienna) 7 th Belle II VXD Workshop, Prague.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, 2015 (updated on Jan. 23) 7th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors.
Next chance for Service test. In the next B2GM Use of old VXD KEK The screw connection may not work. -> double scotch tape for PXD PP mock 1/4.
News on Mechanical Design Dirk Wiedner July /4/20121Dirk Wiedner Mu3e meeting Zurich.
PA and Origami Status and Plan Koji Hara (KEK) Jan. 21, th Belle II VXD Workshop and 18th International Workshop on DEPFET Detectors and Applications.
25th April 2013 C. Irmler (HEPHY), Y. Onuki (IPMU) Ladder Assembly Procedure Belle II – New Collaborators Meeting.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
QCG Report Francesco Forti University and INFN, Pisa.
B2GM, Nov 2014 Laci Andricek, MPG Halbleiterlabor 1 PXD Ladder Assembly - Conceptual design of jigs -
14-oct-2014 GEM detector configuration 1 12 stations: Z = 30 – 45 – 60 – 80 – 100 – 130 – 160 – 190 – 230 – 270 – 315 – 360 Stereo angles: 0 – 7.5 deg.
Schedule 24 September 2012 Christian Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Development of SSD and DSSD for J-PARC experiment.
Mechanical robustness & associated tension at the DSSD slant part connection Mar-5 th 2013 B2GM KEK S. Uozumi (KNU), T. Tsuboyama, N. Sato (KEK)
SVD Summary Markus Friedl (HEPHY Vienna) Wetzlar SVD-PXD Meeting, 6 February 2013.
Infrastructure & issues and solutions for ATLAS Upgrade Hybrid/Module strip bonding Fred Doherty, Joe Ashby, Fiona McEwan & Calum Gray ATLAS Upgrade Module.
Silicon Vertex Detector Schedule 23 July 2012 Christian Irmler (HEPHY Vienna) 12 th Open Meeting of the Belle II Collaboration.
FADC/Hybrid cable production 21 Jan 2015 T. Tsuboyama.
Wire Pull Test The wire pull test is performed using a Pull Tester (BT-14, DAGE 2400 PC, DAGE 4000) and a Pull Hook (performed by placing the hook 90°
The STS-module-assembly:
Si Sensors for Additional Tracker
Progress with System Integration of the CBM Silicon Tracking Detector
FCC Conductor Development at KAT-Korea
Beam test of Silicon-Tungsten Calorimeter Prototype
Bonding study of wrapping part of PA1/2
Wire tension (pull on bond) f = F/2sinα
Ladder Assembly All tools and jigs produced Glue dispensing works
Update on the SVD construction
Christoph Schwanda (HEPHY Vienna) For the Belle II SVD group
Discussion items SVD mechanics session.
July 2, 2007 ID CERN S. Terada KEK Module and Service Structure Designs -Super module conceptual design- - FEA thermal analyses- -Test of angled.
Origami, PA 2015 Sep. 10 Koji Hara (KEK).
detector development readout electronics interconnects bump bonding
Low Mass mechanical design
Sub-Detector Assembly Area Summary of discussion at ALCW2015
Pradeep Ghosh for the CBM Collaboration Goethe-Universität, Frankfurt
Koji Ueno National Taiwan U.
Class B Ladder assembly
Development of vibration isolation systems for LCGT VI
SVD group organization, schedule, milestones
Possible types of Si-sensor: SILICON CALORIMETRY FOR A LINEAR COLLIDER G.Bashindzhagyan, Il Park August Silicon sensor.
Status of Hamamatsu Silicon Sensors
Presentation transcript:

SVD Ladder assembly at IPMU Yoshiyuki Onuki University of Tokyo, Kavli IPMU Higuchi Takeo, Kavli IPMU

Activities at IPMU L6 Ladder assembly procedure(Ref. previous my talk) Wire-bonding parameter optimization Mechanical QA and misalignment parameters measurement with coordinate measuring machine. Talked by Shimizu(U-Tokyo) TIFR L4 Ladder assembly at IPMU

Optimization of wire-bonding for PA1 on Si-Detector All testing was performed at the IPMU. Optimization of wire-bonding for PA1 on Si-Detector Dong-Ha Kah, Kuk-Hyun Kang, Chang-Woo Joo Toru Tsuboyama Kyoungpook National University Seoul National University KEK https://www.dropbox.com/sh/qurfkz5j5tx569u/raxEZ78wU7 Test data sharing rink

Test Set-up Bonding Pulling Change bonding parameters Measurement of force per bonding

Sample PA1 on the CMS silicon detector CMS silicon detector PA1 Au-Cu

Parameter 1 Parameter (next page) Bonding target Bonding condition Power Force Time Bonding target PA1 to Detector Detector to Detector Bonding condition 1st target (PA1 pad) 2nd target (bias-ring) 1700 um 2nd target (bias-ring) 1200 um 1st target (AC pad) <PA1 to Detector test> <Detector to Detector test> PA1 to Detector Detector to Detector Wire length 1200 μm 1700 μm Wire height 500 μm Bonding wires 20 Bonding speed 50000 μm/sec

Parameter 2 Step1 : PA1 to Detector Step2 : Detector to Detector test Power 60,70 70 Force 20 26 Time 10,20 30 Step2 : Detector to Detector test Detector to Detector Power 50,60,70 Force 20,26 Time 20,30 Final : PA1 to Detector PA1 Detector Power 60,70 60 Force 20 Time

Detector to Detector Bonding Optimization process STEP 1 Final PA1 to Detector Bonding Fixing Detector Parameters (Power 70, Force 26, Time 30) PA1 to Detector Bonding Fixing optimized Detector Parameters PA1 Power 60 or 70 Force 20, Time 20 Detector to Detector Bonding To optimize detector parameters STEP 2 Detector Power 60, Force 20, Time 20

Pulling Test Pulling force for PA1 to Detector Break Type PA1 (P70,F20,T20) Detector (P60, F20, T20) PA1 (P60,F20,T20) PA broken neck 75% Detector broken neck 25% Detector lift-off 35% Detector broken neck 30% PA lift-off 15% PA broken neck 15% Wire broken 5%

Summary REBO-7 (wire-bonding machine) is available to make 10 g. In PA1 case, parameters are recommended PA1 (Power 60, Force 60,Time 20(ms)) Detector (Power 60, Force 60,Time 20(ms)) Foot-prints PA1 (P60, F20, T20) Detector (P60, F20, T20)

Summary Wire-bonding parameter optimization for PA was performed by Korean group. The test with Si-detector and PA had been studied from 7th Jan. to 31th Jan. The result shows over 10gf bonding force in average. We are preparing TIFR assembly work at IPMU.

New space for TIFR at IPMU Construction: 21th(Tur) Feb. – 27th(Wed) Feb.

Status We are preparing the MoU between TIFR and Kavli IPMU. New clean room space will be allocated for TIFR L4 assembly. Our(Japan, Korea, TIFR) office room will be allocated in the Kashiwa Research Complex 2 building. Wire bonder shipment work has started. The bonder, Delvotec 6400, will be delivered by 20th March.

Back-up slides

Pulling Pulling force for PA1 to Detector

Pulling Pulling force for Detector to Detector

Bonding Foot-prints (don’t measured each width) Sensor (P50, F20, T20)