RMR Exit for Spencer 5 – Remedial Action Plans

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

March 6, 2008 Technical Advisory Committee Luminant Energy & Oncor Tyler Grande Autotransformer Addition and 138 kV Line Upgrade Project Jay Teixeira Manager,
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
Company LOGO Cleco Planning Process. Models Cleco uses SPP’s annual series of models to determine the NERC reliability violations. Cleco uses SPP or VST.
Regional Planning Group Project
La Crosse 161 kV Capacitor Addition Northern MAPP Subregional Planning Group April 3, 2007 Daniel Kline.
April 16, 2010 Regional Planning Group RMR Exit for Spencer 5 – Remedial Action Plans Chris Ngai Jay Teixeira.
ERCOT RMR Study for Luminant NSO
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Houston Region Import Capacity Project August 27, 2013 Regional Planning Group Meeting.
© 2000 PACIFICORP | PAGE 1 WYOMING WEST AREA STUDY DECEMBER 2013 Seongtae Kim/Jeremy Viula.
Xcel Energy Smaller Scale Transmission Projects Northern MAPP Subregional Planning Group April 3, 2007 Srinivas Vemuri, Jason Standing, and Daniel Kline.
RTP Update RPG Meeting July 21, RTP update  Reliability analysis for the contingencies where load shed is not allowed is complete.
1 Local Area Planning Update to TRANSAC – September 18, 2014.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 8, 2004.
JACKSBORO TO WEST DENTON 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Transmission Planning Summit.
1 Entergy Texas, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 29, 2008.
Aug 17, 2012 RPG Meeting KEC & MEC – Load Addition Project – ERCOT Independent Review Ehsan Ur Rehman Planning Engineer ERCOT.
John Dumas Director of Wholesale Market Operations Jeff Billo Manager of Mid Term Planning Dan Jones Director with Potomac Economics, the ERCOT IMM Board.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Kurten Switch Project ERCOT Board of Directors Bill Bojorquez System Planning December 13, 2005.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
1 Entergy Gulf States, Inc. (Louisiana) Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Proposed North – South Congestion Mitigation Plan Luminant Energy July 2008.
Chad Thompson, ERCOT Special ROS PGRR011 Workshop October 21 st, 2011 SCED Overview and Results.
Jones Creek Project Submitted to RPG on July 7, 2014 July 22, 2014 Regional Planning Group Meeting.
1 Entergy Louisiana, Inc. (South) & Entergy New Orleans, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans,
WEST LEVEE TO NORWOOD 345-kV PROJECT Presentation to Technical Advisory Committee April 8, 2004 Transmission Services Operations.
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
1 1 1 Central Maine Power Local System Plan Presentation Planning Advisory Committee Meeting November 19, 2008.
December 2, 2004 Congestion Causes and Effects Presented to WMS January 14, 2005 Beth Garza.
Jeff Billo Manager, ERCOT Transmission Planning Kenedy to Nixon to Seguin Line Upgrade Project Regional Planning Group (RPG) Review; ERCOT Independent.
AEPSC Live Oak County Transmission Project – ERCOT Independent Review TAC September 24, 2015.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
Transmission Voltage Management Ross Owen Oncor Electric Delivery.
October 16, 2009 RPG Meeting ERCOT Independent Review of the Corpus Christi Improvements Project Jeff Billo.
LCRA TSC/ CPS Energy Transmission System Addition Regional Planning Group Project Jeff Billo Sr. Manager, Transmission Planning TAC ERCOT Public March.
Jeff Billo Manager, Transmission Planning
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Regional Operations Review Group Activities Status Report to TAC April 8, 2004.
June 3, 2010 Technical Advisory Group RMR Exit for Spencer 5 – Remedial Action Plans Jay Teixeira.
May 8, 2008 Technical Advisory Committee CenterPoint Energy Rothwood Substation Project Jay Teixeira Manager, Regional Planning.
1 Entergy Mississippi, Inc. Proposed Transmission Reliability Projects Entergy Transmission Planning Summit New Orleans, LA July 10, 2003.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
October, 2009 Congestion Report Isabel Flores. 2 October, 2009 Background Provide trend of local congestion costs for last 13 months Costs shown in millions.
June 26, 2008 Technical Advisory Committee American Electric Power Service Corporation Presidio Area Reliability Improvements Project James Teixeira Manager,
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
LINE 69H REBUILD AND CONVERSION PROJECT ERCOT Regional Planning Group April 21,2016.
1 Entergy Arkansas, Inc. Proposed Transmission Projects Entergy Transmission Planning Summit New Orleans, LA July 31, 2007.
Presentation For PSAST May 14, Outline Most Limiting N-1-X Events Voltage Limitations For Loss of Three Terminal Monroe- Echo Lake 500kV and Chief.
Nodal Planning Go Live Austin, TX February 3, 2011
Information Needed By All Market Participants To Facilitate Transmission Congestion Studies In ERCOT Presented to the ERCOT ROS by Shannon Caraway, P.E.
Reliability Must Run Workshop RMR Study Process May 24, 2016.
Freeport Area Master Plan Project
ERCOT – LP&L Study Status Update
Freeport Area Master Plan Project -
2016 RTP Update June, 2016 RPG Meeting.
Nacogdoches to Lufkin SS 345 kV Line Project
Description of Project
2016 RTP Update November, 2016 RPG Meeting.
Barrilla Junction Area Transmission Improvements Project
ERCOT 2009 Five-Year Transmission Plan Update
Local Area Planning Update to TRANSAC – September 15, 2016
DEC System Voltage Planning - June 2018
Local Area Planning Update to TRANSAC – September 26, 2018
Presentation transcript:

RMR Exit for Spencer 5 – Remedial Action Plans Chris Ngai Jay Teixeira Regional Planning Group April 16, 2010

Summary ERCOT staff analysis of the Spencer 5 exit from RMR status indicated that the Remedial Action Plans (RAPs) described herein would facilitate the unit’s RMR exit. Slide 3 contains a list of the six RAPs proposed as an RMR exit strategy for Spencer 5 with detailed descriptions of the RAPs in the subsequent slides. Review of the RAPs submitted by Oncor on April 14 is currently in progress. RAPs were revised to take into account current construction activity. This analysis was performed using the 2010 summer peak case; last updated on December 11, 2009.

List of RAPs RAP Description Contingency/Overload pair Est. Hours/yr* 1 Carrollton RAP L: Lewisville Switch (645)-Highland E 138kV(1970) line C: Lewisville Switch (645)-Highland(664) 613 C: Highland (664) - Canyon (668) 7 2 Lake Pointe RAP L: Carrollton Northwest-LakePointe 138kV line C: Lewisville Switch 345/138kV autotransformer 208** 3 Highland RAP L: Lewisville Switch (645)-Highland E 138kV(1970) 138kV line C: Coppell-Lewisville Switch 10 4 Frisco RAP L: Collins (2370) to Frisco (681) 138kV line C: Denton Steam – Corinth; Teasley to Pockrus 278 5 Frisco Voltage RAP L: Low voltage at Frisco and Panther Creek C: Collin to Frisco 138kV line 90 6 Arco RAP After Operation of Carrollton RAP or Lake Pointe RAP See above *based on SSWG load level and one unit unavailable **138 kV line from NW Carrollton to Lewisville still in service through summer this RAP not needed

RAP 1 – Carrollton RAP Problem 1 Contingent element: Lewisville Switch (645)-Highland(664) Overload element: Lewisville Switch (645)-Highland E 138kV(1970) line (Rate A/B/C: 214/214/214) RAP operation: Open NW Carrollton (2361) – Lewisville Switch (646) 345kV and 138 kV lines Level of overload: 117.8% Rate B (252.1MVA) Estimated number of hours RAP would operate in year 2010: 613 hours

RAP 1 – Carrollton RAP cont’d 613 hours Contingency: Lewisville Switch (645) to Highland E (1970) 138kV line Overload element: Lewisville Switch (645) to Highland (664) 138kV line RAP action: Open the NW Carrollton (2361) – Lewisville Switch (646) 345kV line Denton NW Carrollton Roanoke

RAP 1 – Carrollton RAP cont’d Problem 2 Contingent element: Highland (664) - Canyon (668) Oveload element: Lewisville Switch (645)-Highland E 138kV(1970) line (Rate A/B/C: 214/214/214) RAP operation: Open the NW Carrollton (2361) – Lewisville Switch (646) 345kV and 138 kV lines Level of overload: 101.9% Rate B (218.1MVA) Estimated number of hours RAP would operate in year 2010: 7 hours

RAP 1 – Carrollton RAP cont’d 7 hours Contingency: Highland (664) to Canyon (668) 138kV line Overload element: Lewisville Switch (645) to Highland E (1970) 138kV line RAP action: Open the NW Carrollton (2361) – Lewisville Switch (646) 345kV line NW Carrollton Roanoke Denton

Contingent element: Lewisville Switch (645)-Highland(664) RAP 2 – Lake Pointe RAP Contingent element: Lewisville Switch (645)-Highland(664) Overload element: Lewisville Switch 345/138kV autotransformer (Rate A/B/C: 700/700/700) RAP operation: Open the line TNMP Lake Pointe (37010) – TNMP Lewisville (37080) Level of overload: 113.3% Rate B (317.3MVA) Estimated number of hours RAP would operate in year 2010: 208 hours Not needed in 2010 summer due to 138 kV line from Lewisville to NW Carrollton line being in case May activate Arco RAP to handle Double Circuit contingency Causes Collin to Frisco to overload

RAP 2 – Lake Pointe RAP cont’d 208 hours Contingency: Lewisville Switch 345/138kV autotransformer Overload element: Carrollton Northwest – Lake Pointe 138kV line RAP action: Open the line TNMP Lake Pointe (37010) – TNMP Lewisville (37080) Denton NW Carrollton

Contingent element: Coppell-Lewisville Switch RAP 3 - Highland RAP Contingent element: Coppell-Lewisville Switch Overload element: Lewisville Switch (645)-Highland E 138kV(1970) 138kV line (Rate A/B/C: 214/214/214) RAP operation: Open Lewisville Highlands (37050) – Lewisville West (37060) Level of overload: 101.8% Rate B (217.8MVA) Estimated number of hours RAP would operate in year 2010: 10 hours Coppell to Lewisville Switch contingency sectionalized to Lewisville Switch to Lewisville. Overload element: Coppell Tap to McKamy Tap May not related to Spencer RMR

RAP 3 - Highland RAP cont’d 10 hours Denton Contingency: Coppell to Lewisville Switch 138kV line Overload element: Lewisville Switch (645) - Highland E (1970) 138kV line RAP action: Open Lewisville Highlands (37050) – Lewisville West (37060) NW Carrollton

Contingent element: Denton Steam – Corinth & Teasley - Pockrus RAP 4 – Frisco RAP Contingent element: Denton Steam – Corinth & Teasley - Pockrus Overload element: Collins (2370) to Frisco (681) 138kV line (Rate A/B/C: 256/256/256) RAP operation: Raise the voltage of the West Denton 138kV side to 140kV Modify the Collin Switch Reactor SPS so that it will operate when the Collin to Frisco line overloads. If this does not resolve the overload, put all three capacitor banks at Navo in-service Verify Argyle and Corinth capacitors are on Level of overload: 109% Rate B (276.9MVA) Estimated number of hours RAP would operate in year 2010: 278 hours

RAP 4 – Frisco RAP cont’d 278 hours Collin North Denton Spencer Contingency: Denton Steam auto-transformer to Corinth & Teasley to Pockrus 138kV line Overload element: Collins (2370) to Frisco (681) 138kV line RAP action: Raise the voltage of the West Denton 138kV side to 140kV Collin Switch Reactor SPS operates when the Collin to Frisco line overloads put all three capacitor banks at Navo in-service Collin North Denton Spencer

RAP 5 - Frisco Voltage RAP Contingent element: Collin to Frisco 138kV line Low voltage element: Frisco and Panther Creek bus RAP operation: Raise voltage at West Denton to 1.02~1.05 adjust power factor/load Level of overload: 0.8942 p.u. Estimated number of hours RAP would operate in year 2010: <0.92 p.u. – 584 hours (Brazos Criteria) <0.90 p.u. – 90 hours (ERCOT Criteria)

Carrollton RAP (line loadings refer to Collin to Frisco) RAP 6 – Arco RAP Cause Carrollton RAP Lake Pointe RAP Overload element: Collin (2370) to Frisco (681) 138kV line (Rate A/B/C: 256/256/256) RAP operation: Open Arco (1993) – Krugerville (1994)138kV line Level of overload: Carrollton RAP (line loadings refer to Collin to Frisco) Problem 1 - 115.4% (239.4 MVA) after Carrollton RAP [pre RAP: 104.1% 266.4 MVA Collins SPS would relieve this but not after Carrollton RAP so should use Arco RAP instead]] Problem 2 – 113.8% (291.4 MVA) after Carrollton RAP [pre RAP: 102.3% 262.0 MVA Collins SPS would relieve this but not after Carrollton RAP so should use Arco RAP instead]] Lake Pointe RAP - 111.2% (284.6 MVA) after Lake Pointe RAP [pre RAP: 110.6% 283 MVA]

RAP 6 – Arco RAP cont’d Krugerville Navo Panther Creek Arco Collin Same # of hours as Carrollton RAP & Highland RAP Overload element: Collins (2370) to Frisco (681) 138kV line Contingency: overload caused by Carrollton RAP and Lake Pointe RAP RAP action: Open Arco (1993) – Krugerville (1994)138kV line Collin Krugerville Arco Navo Panther Creek

Permanent RMR Exit Solutions Project TPIT Estimated Completion Date 1 RD Wells to Hickory 69kV (Denton) 06TPIT0198 (tier 4) June 2010 2 Upgrade Lewisville Switch to Highland (TNMP) 138 kV line to 290MVA or above 07TPIT0018 May 2015 3 Add second 345/138kV autotransformer at Lewisville switching substation 07TPIT0042 (tier 3) June 2011 4 Upgrade Collin to Frisco 138kV line to 326MVA 08TPIT0068 June 2013 5 Upgrade West Denton to Jim Christal to North Denton138kV line to 250 MVA or above Per E. Schroeder (TMPA) email dated 3/10/2010 Summer 2012 6 Additional capacitor banks at Navo and Panther Creek Substations (interim for Mustang capacitor bank) 2011 7 New Mustang Substation and capacitor bank 10TPIT0083 8 Upgrade Arco to Krugerville 138kV 10TPIT0032 May 2011

Questions?