Beam dump at 03:00:50.750.

Slides:



Advertisements
Similar presentations
Numerology (P. Baudrenghien) For each ring: Convention 1: The 400 MHz RF defines buckets, spaced by one RF period, and numbered from 1 to Convention.
Advertisements

LONGITUDINAL (IN)STABILITY WITH BATCH INJECTION T. Argyropoulos, P. Baudrenghien, C. Bhat, J. E. Muller, T. Mastoridis, G. Papotti, E. Shaposhnikova,
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
REPHASING TESTS DURING THE TWO BEAM IMPEDANCE MD P. Baudrenghien, J. Noirjean, T. Mastoridis 10/26/2012LSWG meeting 1 Oct 7 th,18:00 – Oct 8 th, 04:00.
Injection and Extraction Losses W. Bartmann with many inputs from: R. Appleby, R. Assmann, P. Baudrenghien, V. Boccone, C. Bracco, B. Dehning, E. Gianfelice,
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Thursday 21/4 07:30: End of fill #1727. Beam dumped. ALICE compensator magnet fault. Delivered ~6.7 pb -1 in 7.5 h. 11:30 Stable beam # bunches/beam.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
Wednesday ● 02h04: Stable beams # b x 121b. – Peak luminosity 1.2e25 cm-2 s-1 ● 08h32: Beams dumped on request. – Length=6h28. Rampdown.
:00 meetingEBH 1  8:40 – 9:30 access for MKB (dilution kicker) LBDS B2 – PLC exchange  Pre-cycle  11:17 – 12:50 RF problem with ion injection.
RF improvements over the weekend Giulia on behalf of Delphine, Philippe, Andy and many other people in the RF team LHC Beam Commissioning Working Group,
Beam loss and radiation in the SPS for higher intensities and injection energy G. Arduini 20 th November 2007 Acknowledgments: E. Shaposhnikova and all.
Floating MD week 28 summary
Ion Commissioning: Thursday & Friday
Friday Access in shadow of SPS interventions (RF, extraction septa power supply) Lead into problem on the cooling of the extraction septa in SPS Both beams.
Ralph Assmann, Giulia Papotti, Frank Zimmermann 25 August 2011
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
SPS extraction, transfer lines, injection
Saturday :12 Stable beams fill 3351 Initial luminosity
-9:00: Test IP transverse adjustment (CMS) and optics verification.
Longitudinal beam parameters and stability
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Monday 14th March Second fill with pilot + 3 nominal bunches
LHC Status Wed Morning 13-April R. Assmann, B. Holzer et al
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
Tue :25 Beams dumped due to RF vacuum interlock
Wednesday /Thursday 09-11:00 Verification of the LSS6 interlocked BPMs: took longer to fill due to some problems with RF cavities in the PS. In the mean.
CNGS Primary Beam Results 2010
Summary of Week 11: 14 – 21 March
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Summary of week 44 Aims of week 44 J. Wenninger & J. Uythoven
Yesterday Issue of injection kicker not pulsing:
Tuesday Fill 1494 dumped by operations at (~ 0.25 ub-1 in ~6.5 h): LSS6 BPM interlock test 13:00 Fill 1495 dumped by RF dump (cavity quench) 14:00-17:30.
Summary of Week 16 G. Arduini, J. Wenninger
LHC RF Status Reported by P. Baudrenghien CERN-BE-RF
Lost at 12:05 to power converter (RTQX2.R1) problem
Friday 31st August & night
LHC Status Sun Morning 20-Mai
Friday 14th December - morning
Wire almost entirely through beam before BLM triggers dump
450 GeV Initial Commissioning with Pilot Beam - Beam Instrumentation
Programme for Saturday 10 July
CNGS Primary Beam Results
Monday 24 October hours of 25ns MD
Wednesday 10:00 test of the un-squeeze to 90 m at 4 TeV.
Beam dynamics requirements after LS2
Tuesday 17/5 10: TeV - colliding. Start roman pot alignment ...
Thursday Fill 1364 (24 bunch) dumped at 07h
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Saturday Nov Stop proton operation. Switch back to ions
Monday 8th December Morning used for RF work (IP z, injection), damper noise checks. Stable beams period with LHCb spectrometer OFF – lost beam after.
Collective effects in the SPS and LHC (longitudinal plane)
Friday 8/10/10 - Morning Planned to keep fill until the afternoon
Sat 15/10 New record bunch population profiting of the scrubbing period on Friday. Nb~1.42x1011p/bunch  110 MJ at 3.5 TeV. Filling slowed down by ZS sparking.
Tuesday 20 September 2011.
Thursday 30th September De-bunching test
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Injection Studies: 50 ns ABT/BTP.
Monday 27th August & night
Wednesday 14:30 Fill 2011 dumped.
Wednesday morning Waiting for PS – problem on RF cavity.
Monday 14th May 00:03UFO at BLMQI.06R8.B2E10_MQML. Beam dump Re-steering required for TI2 03:28 STABLE BEAMS # e11 ppb, 4.11e33 cm-2s-1 13:36.
Tuesday 6th April 8:00 Injection studies 16:00 RF studies
Saturday 15th May One bunch 1 e11 per beam 09:57: start ramp
Friday During the night from Thursday to Friday: by mistake, SPS longitudinal blow-up was not active  Smaller transverse emittance from the.
Thursday 10:00 Fill 1986 in stable beams.
Daniel, Gianluca and Belen (for the Collimator team)
Tuesday
Presentation transcript:

Beam dump at 03:00:50.750

Beam dump at 03:00:50.750 The dump occurred at injection of the second train of 144 bunches of Beam 1 but no beam was extracted from the SPS (from BCT, trajectory and BLM data in TI2) SPS BQM inhibit prevented extraction

Beam dump at 03:00:50.750 Consistent with beam dump observation showing only 12+144 bunches on the dump

Beam dump at 03:00:50.750 Circulating intensity: 1.95x1013 p Dumped intensity: 1.88x1013 p (96.7%) The accuracy in the comparison is at the percent level so no clear sign of important intensity losses (see below for the last month)

Beam dump at 03:00:50.750 Injection Kicker pulsed correctly. No error in delay, pulse shape or strength.

Beam dump at 03:00:50.750 But losses occurred during injection. TCTH.R2, D2.R2 above threshold, TDI losses as well. Consistent with injection kicker pulse extracting circulating beam (satellites, or un-captured beam).

Beam dump at 03:00:50.750 Analysis of Fast BCT and DC BCT data for B1 show that the first 144 train of B1 was badly captured and beam was escaping the bucket particularly in the last part of the train

Beam dump at 03:00:50.750 The first 144 train of B1 was badly captured and beam was escaping the bucket particularly in the last part of the train G. Papotti

Ph. Baudrenghien, T. Mastoridis Beam dump at 03:00:50.750 Bunch length blowup for first 144 batch of beam 1 (fills 2010, 2011). The severe de-bunching observed during the fill attempt around 3:00 last night (likely) has the same cause. With the increased intensity per bunch, the RF front-end in the LLRF are at the saturation limit. We will change gains asap. TIME REQUESTED (1-2 hours) before next filling. Ph. Baudrenghien, T. Mastoridis

Beam dump at 03:00:50.750 Injection and abort gap cleaning were active