Eastham Water System Board of Selectmen Meeting February 1, 2016

Slides:



Advertisements
Similar presentations
Doewood Drive Gate Closure: Right-of-way Vacation & Proposed Improvements El Paso County Public Services Department Tuesday, February 14, 2012 André P.
Advertisements

Managing a Successful Mechanical System project Following design – what next?
Wakulla County Sewer Project Eutaw Utilities Presentation April 7, 2011.
Stanlick Sewer Treatment Plant Upgrade Implementation Date: September 1, 2008.
January 6. January 7 January 8 January 9 January 10.
Floyd County Board of Commissioners Special Town Hall Meeting Topic: Update on status of Georgetown WWTP.
A Research Institute of the University of Central Florida FBC Mechanical Technical Advisory Committee Teleconference Meeting February 25, 2015 Investigation.
What do Civil Engineers do? Design Civil Infrastructure Roadworks Earthworks Stormwater Management.(Including Detention & Quality Measures) Sewer Water.
With the Genesee County Road Commission By Fred Peivandi, P.E. And Ken Johnson, P.E. Local Road Funding.
Vance County Water District Overview and Update Jordan McMillen Director Vance County Planning and Development Department 156 Church St. Suite 3 Henderson,
Emergency Notification Systems - ISU Alert EDUCAUSE Midwest Regional ISU Alert Carol McDonald Information Systems Leader Information Technology.
CWA §319 Grants General Conditions Grant Types Grant Format Timelines The Awards Reporting Note: § 319 monies are reimbursable grants.
PRINCE WILLIAM COUNTY PUBLIC SCHOOLS. SCHOOL DIVISION WIDE ENROLLMENT FORECAST CURRENT SCHOOL CAPACITY568 Students FORECAST ENROLLMENTDEFICIT 2007 School.
January 30, 2014 Luke Lortie, EIT Jerry Auge, PE
ROAD ACCIDENT FUND VENDOR BRIEFING SESSION RAF/ 2012 /00031 Date: 15 January 2013 Time: 09:00.
Community Facility Loans/Grants Architect Flow Chart Owner has need for project. RD Area Office is contacted. RD visits project site and discusses project.
State Milestones Subsidized Insurance Workgroup High Level Timeline 2011 Jan 2011 Feb 2011 Mar 2011 Apr 2011 May 2011 Jun 2011 Jul 2011 Aug 2011 Sept 2011.
Guild Road Industrial Park Workshop. Guild Road Industrial Park Incubator Study identified a lack of market for a successful incubator in Woodland. Consultant.
NEW YORK STATE DEPARTMENT OF TRANSPORTATION Route 110 over Route 27 Design-Build Project (PIN , D900027) Town of Babylon, Suffolk County Request.
Red Light Safety Camera Program Update Presented by Public Works Department Traffic Engineering Division Board of County Commissioners June 19, 2012.
State of Oklahoma Information Services Division Contracts and Purchasing Unit 1.
Agency Board February 20, 2014 Update on the Davis-Woodland Water Supply Project.
SHARED SYSTEMSSHARED SYSTEMS 2015 MASSDEP/ MHOA SEMINAR.
Presented by Molly Skorpik at the 2011 Montana Association of Dam and Canal Systems Conference Presented by Molly Skorpik at the 2011 Montana Association.
Britannia Village Flood Control System Information Meeting for Directly Affected Landowners February 5, 2009.
Neighborhood Stabilization Program (NSP) Update February 16, 2010.
1 NSTAR TRANSMISSION RELIABILITY PROJECT ENVIRONMENTAL BUSINESS COUNCIL UPDATE APRIL 21, 2005.
Melissa Rothstein Julie Brewer USDA Food and Nutrition Service 1.
W. Robert Patterson & Associates PV SOLAR PROJECT DEVELOPMENTS For the Plymouth Public Schools Bob Patterson November 22, 2010.
Project History Town of Newport Population: 550 Vermillion County Seat.
Town of Orleans Wind Energy Project Berkshire Renewable Energy Summit June, 2005 Kevin Galligan
Proposed FY Budget Town of Denmark Presentation to Board of Selectmen February 11, 2015.
1 Overview of Reliability Requirements XYZ Cooperative Date: abc.
PROPOSALS.
1 The Office of the Commissioner of Financial Regulation Maryland’s Foreclosed Property Registry.
1 Construction Assessment Hearing May 23, 2001 Shawnee Middle School Cafeteria.
February’s Accomplishments Met extensively with FTA staff and received the Record of Decision from FTA Finalized Negotiations with the top ranked Design.
Kick-off Meeting January 27, 2015 Tony Quintanilla, MWRD Sanjay Sofat, IEPA Proceedings are being video recorded and will be made available. Chicago Area.
SunSatFriThursWedTuesMon January
Case No. VA Board of County Commissioners October 20, 2015.
Time and Attendance Software A Software Application to Replace the Current Paper Based, Manual Process Personal and Academic Success for All!
February 12, 2013 Alachua County Board of County Commissioners.
1 © 2013 Protiviti Inc. All Rights Reserved. This document has been prepared for use by OOCEA’s management, audit committee, and board of directors. This.
Bedford County Budget Work Session February 4, 2013.
Hummock Pond Road Bike Path Implementation Update January 25, 2012.
EASTERN MUNICIPAL WATER DISTRICT County Water Company Consolidation Project Greg Kowalski, P.E. Senior Civil Engineer April 1, EXHIBIT.
1 EASTERN MUNICIPAL WATER DISTRICT Temecula Valley Regional Water Reclamation Facility 23-MGD Expansion Project Joe Mouawad, P.E. Senior Director.
Wastewater Treatment Plant No. 2 Construction Contract City Council Workshop February 9, 2016.
Richland Creek Water Supply Program Status Update Paulding County, Georgia Board of Commissioners Work Session January 26, 2016.
Richland Creek Water Supply Program Update Paulding County, Georgia Board of Commissioners Work Session March 08, 2016.
Harwich, Massachusetts Overview of Comprehensive Wastewater Management Plan (CWMP) East Harwich Planning Workshop June 4, 2014 East Harwich Planning Workshop.
Update on the Richland Creek Reservoir and Water Supply Program Paulding County, Georgia Board of Commissioners Workshop Briefing May 26, 2015.
Public Information Meeting St. George Road - Oak Hill Road Intersection Reconstruction Project.
Eastham Water System Board of Selectmen Meeting April 25, 2016.
CONGAMOND ROAD ROADWAY IMPROVEMENT INFORMATIONAL MEETING
Knoxville Utilities Board June 21, 2016
Green Line Extension Project
Sun City Lift Station Odor Control Improvements
Quail Valley Subarea 9, Phase 1 Sewer Award of Construction Contracts
Queen Anne’s County Commissioners Financial Update
Valley & Third Streets Redevelopment
Springbrook Estates Sewer Improvement Area Informational Meeting
HFMA Spring Meeting March 16, 2018
Balancing the Operating Budget Ward Forum Presentation
Granville County Government Budget Calendar
Biltmore C Proposed Water & Sewer Improvement Project
Governmental Accounting Finance Budget “101”
Richland Creek Water Supply Program Program Update
Port Back Data Collection & Transition
Roanoke County Public Schools Budget
Presentation transcript:

Eastham Water System Board of Selectmen Meeting February 1, 2016

Funding – SRF and USDA SRF USDA – Rural Development Final 2016 Intended Use Plan issued last Wed. Eastham is #1 on list - $16 Million USDA – Rural Development Funding request for non-SRF costs: $2 Million Grant-loan. 20% grant ($400,000) Looks likely to be approved by early April

Winter Construction Activities (January – February) Work ongoing on Contracts 2, 4 and 5 (RB Our and CC Construction) Great Pond, Thorne, Seward Contract 6 now done for winter (RJV)

Progress Plan (Jan. 21st ) Hydrants, Gates and Valves

Contract 7: Northwest System Bids received Jan 20th 10 bids: $3.52 M - $5.19M RB Our Company – lowest bid Lowest 5 bids w/in 10% of each other March/April construction start Information session for property owners - Jan 25th

Contract 7 Private Roads Jack-cin Drive Whelpley Road Treat Road Quasson Drive Bangs Road Wamisco Road Oquamoshod Road

Easements are needed for private roads To install the water main (construction) For water system maintenance (operations)

What is an easement? It is not a “taking” Permission to access property owned by another Legal title is retained by the property owner A right-of-use for construction and O&M It is not a “taking”

Easement Process Easement plan reviewed with property owner Documents prepared by Town counsel Action by Water Commissioners (Board of Selectmen) Recorded at the Barnstable County Registry of Deeds

Contract 8: Southwest System February DEP permit Con Com NOI SRF reviedw Bidding Advertise: late-Feb/early March Receive bids mid-March

Water System Rules & Regulations Draft under review with Board of Health and Town Counsel Finalize with BOS during March Rate structure being developed

Meter Procurement Issue RFP mid-late Feb. 2016 Receive Proposals March2016 Vendor Selection April 2016

Public Outreach & Information Eastham web page http://easthamwaterproject.weebly.com Eastham Water Projects Email Address: easthamwater@envpartners.com Eastham Water Project Phone Number 617-657-0279

DISCUSSION