ATLAS M&O General Comments

Slides:



Advertisements
Similar presentations
Management’s preliminary comments to the ERC Report.
Advertisements

ALICE © | RRB | 17 April 2013 | Catherine Decosse 24 th meeting of the ALICE Resources Review Board CERN-RRB
Max Klein/Univ. of Liverpool Peter Kostka/DESY Alessandro Polini/Univ. of Bologna Markus Nordberg/CERN.
Trigger and online software Simon George & Reiner Hauser T/DAQ Phase 1 IDR.
COBRA Magnet Test Milestone AssemblyDesignManufactoring DesignAss.TestWinding & Cryo. Deliv. PSI Test Platform Calibration Mapping device.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
19/9/2001Plenary RRB October 22, 2001 DS 1 Status Report of the M&O Scrutiny Group  Evolution of M&O Estimates  Scrutiny Group Mandate  Scrutiny Group.
Accelerator Consolidation Workshop TE/EPC consolidation plan 2 Jean-Paul Burnet ACC consolidation day, 12/09/2013.
DCS Workshop - L.Jirdén1 ALICE DCS PROJECT ORGANIZATION - a proposal - u Project Goals u Organizational Layout u Technical Layout u Deliverables.
Financial Matters Ferdinand HAHN. Content Cost to completion (exceptional MOF 2014/15) MOF in 2013 (Budget – Contributions - Expenses) MOF in 2014 (Budget.
RRB Scrutiny Group Meeting A. Charkiewicz, 16 July 2013 M&O Budget Issues.
CERN, Main challenges for the ATLAS upgrade project in the coming year.
Roberto Tenchini CMS FB December 2004 CMS Tracker The Tracker Cost Review - November 2004.
Workpackages & deliverables Funding & manpower Uncovered areas Institutions round table Institutes commitments Vit Vorobel, AFP kick-off1.
Financial Matters Ferdinand HAHN. Content Short Reminder: Definition of Maintenance and Operation Fund (MOF) in the MoU MOF in 2011 (Budget – Contributions.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
G. Martellotti1CSN1 14 / 10 / 2002 LHCb Category A M&O status for 2002 and estimate for 2003 Report on Common Fund and CORE expenses for RRB Ott.
Draft Budget for M&O 2007 A. Petrilli, RRB-23, October 24, 2006 CERN-RRB Cf. CERN-RRB
Scrutiny Group Meeting, May 30, 2006 A. Petrilli, 24 May 2006.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
MM detector construction One or several modules per sector considerations.
ATLAS Inner Detector MO_B 2012 closure 2013 mid-year status 2014 request H. Pernegger / Pixel PL & ID Resource Coordinator D. Robinson / SCT PL and ID.
LHCbComputing Manpower requirements. Disclaimer m In the absence of a manpower planning officer, all FTE figures in the following slides are approximate.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
Deliverables, Cost, Manpower, Schedule & Maintenance Su Dong CSC Readout Replacement CDR Oct/8/
MoA and M & O-B Pigi Paolucci. Introduction The RPC endcap and barrel project were merged in an unique project in the 2009 and so we don’t have a long.
5 th May 20061M. Battistin CERN LEAF Committee 2/R-030 8h30 - May 5 th 2006 Michele Battistin (TS/CV/DC) TS M&O agreement for Detector Cooling installations.
1 AGS RSVP Review 4-5 November 2004 Upgrade and Operations Cost & Schedule Summary Philip Pile Collider-Accelerator Department 4 Nov 2004.
RRB Scrutiny Group Meeting A. Charkiewicz, 11 June 2014 M&O-A and Upgrade Budget Issues.
Project X RD&D Plan Cryogenics Arkadiy Klebaner AAC Meeting February 3, 2009.
R. Boyd 1 February  Dr. M. Saleem  D. Jana  M. R. Meera Labbai  R. Boyd.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
RPC M & O-B status Pigi Paolucci. Introduction 2008: RPC project budded from the barrel and forward 2009: M&OB token of 5 KCHF (but INFN 163 KCHF) The.
Most Common Fund spending now goes on infrastructure. In the course of next year, essentially all the remaining funds will be spent on finishing the sub-detectors.
News and Misc Didier Contardo, Jeff Spalding UPO 3/2/12 1 UPO 2/2/12 o The MM, cost estimates and reporting o Milestones and scheduling o Chamonix Meeting.
Xenon Delivery Japan 1 MCHF 575 kCHF granted Additional grant 656 kCHF Last 50l subject to negotiation.
"If you know how to spend less than you get, you have the philosopher's stone." - Benjamin Franklin.
U.S. ATLAS Project Manager’s Review with the Project Advisory Panel March 21-22, BNL Introduction Howard Gordon.
TE-CRG Activities D. Delikaris, TE-CRG.
Service Agreements Emmanuel Tsesmelis CERN / TS-LEA RRB Scrutiny Group 31 August 2006.
Emmanuel Tsesmelis RRB Scrutiny Group Meeting August 2010.
Status of ATLAS Resources Presentation to RRB Markus Nordberg ATLAS Resources Coordination CERN-RRB
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
MMT Retreat Technical Services across ESS Peter Rådahl
Introduction to L1Calo Upgrade L1Calo Collaboration Meeting Cambridge 23-Mar-2011 Norman Gee.
14 Aug. 08DOE Review John Huth Future Harvard ATLAS Plans John Huth.
Collaboration Board 27/09/ Next RRB in October - Core and Common Funds in Projected M&O Cat. A budgets for the coming years - Received funds.
20/07/ Marzio Nessi Agenda For NIKHEF plans for the ATLAS Upgrade. NIKHEF ATLAS upgrade plans and organization DL/NH Potential.
Financial Matters Ferdinand HAHN 08/04/ Content Definition of Common Fund (MOF) in MoU MOF in 2010 (Budget – Contributions -Expenses) MOF in 2011.
Vacuum System P. Chiggiato TE-VSC
Completion and Pre-Exploitation Costs for the Initial ATLAS Detector
TDAQ Phase-II kick-off CERN background information
Test Beam Request for the Semi-Digital Hadronic Calorimeter
Financing of LHC projects and CMS
CERN R&D plans and Infrastructures
Mandate First draft plan is attached to agenda -- please give feedback
HCAL M&O-B Budget CMS Finance Board
30th meeting of the ALICE RRB C. Decosse
LHCC referees’ questions, comments, requests
4th FRC meeting, Antti Onnela, CERN-PH-DT
Savannah to Jira Migration
CRYOGENICS OPERATIONS 2008 Organized by CERN
Status of ATLAS Resources
Francesco Forti University and INFN, Pisa
Status of ATLAS Resources
Particle physics at the LHC and ATLAS.
The Norwegian ATLAS project
Update on ATLAS insertable B-layer
Parks and Recreation Services
Presentation transcript:

ATLAS M&O 2008-2012 General Comments RRB M&O SG May 05, 2009 Markus Nordberg ATLAS Resources Coordination

Final 2008 M&O-A Payments (kCHF) Category A (12.8 MCHF) Cost drivers Technical services (5.2 MCHF) Magnet operation (3.0 MCHF) Core computing I&S (1.8 MCHF) On-line comp. (2.1 MCHF) Energy NMS (0.7 MCHF) Note: Open commitments 0.5 MCHF due to extended shutdown

Final 2008 M&O-B Payments (kCHF) Category B (6.8 MCHF) Cost drivers Technical services, manpower (1.9 MCHF) Electronics replacements, rental (2.0 MCHF) Operation of areas, spares, stores (2.7 MCHF) 87 FTE core computing effort as in-kind Note: Updated income Table attached

2010 M&O-A Budget Estimates (kCHF) Category A (16.0 MCHF) Cost drivers Technical services (7.3 MCHF) Magnet operation (2.4 MCHF) Core computing I&S (1.9 MCHF) On-line comp. (3.4 MCHF) Energy NMS (0.9 MCHF) Note: Estimates same as presented in September 2008

Category-A Basic assumption: ATLAS in full running mode 1.4 – 30.11 each year Note: Cryogenics, gases, electronics, power supplies active at all times irrespective whether there are colliding beams or not Mechanics replaced at <2%>, electronics <5%>; guidelines as agreed with SG Key activity drivers (2010) Basic infrastructure 7.3 MCHF Technical crews to operate the site/access detector (operation, gases, safety) General services (provided by CERN) TDAQ operation 3.4 MCHF Processor/network replacement model agreed with SG (so-called “V Luth-model”) Assumes replacements following 3 full years of operation, plus 5% in current year Present investment model: 1600 processors by EoY 2008, remaining 1400 by EoY 2010 Note: Fluctuating model; 3.9 MCHF in 2011 and 2.5 MCHF in 2012 Sys Admin to operate the TDAQ: 10 FTE @ 120 kCHF Magnets, LAr Cryogenics operation 2.4 MCHF Consumables and operation (using external firms) Assumes 400 kCHF/year of Liquid Nitrogen to compensate for lack of refrigerator cooling power Off-line computing (technical infrastructure, services) 1.9 MCHF Manpower at <88 kCHF>

Category-A (cont’d) Specific topics to be addressed for 2010+ Revision of the detector cooling plant Centralized support for Insertable b-layer (IBL) project Support for coordinators, core computing Sniffer maintenance costs IT support (collaborative tools: EVO, on/off-line DB person) TDAQ HLT replacement needs > 2011+

2010 M&O-B Budget Estimates (kCHF) Category B (6.7 MCHF) Cost drivers Technical services, manpower (2.1 MCHF) Electronics replacements, rental (2.2 MCHF) Operation of areas, spares, stores (2.1 MCHF) 98 FTE core computing effort as in-kind Note: Estimates same as presented in September 2008

Category-B Basic assumption: Same replacement rates as in Cat-A; except custom-specific HV/LV PS in LAr and Muons <10%>. Guidelines agreed with SG. Detectors running throughout the year Key cost drivers in 2010 Electronics, PSs (including also Pixel b-layer replacement) ~ 2.1 MCHF Manpower ~ 2.2 MCHF Detector-specific manpower <90 kCHF/FTE> External manpower <120 kCHF/FTE> Specific topics to be addressed 2010+ IBL project Production of LAr LVPS Production of Tiles PM spares

Evolution of M&O 2002 – 2010, MCHF