Rosetta Science Ground Segment Overview

Slides:



Advertisements
Similar presentations
SEP1 - 1 Introduction to Software Engineering Processes SWENET SEP1 Module Developed with support from the National Science Foundation.
Advertisements

IBM Business Consulting Services © Copyright IBM Corporation 2006 Unified Process March 27, 2006 Chris Armstrong.
Robotics Engineering Science vs Engineering What’s the difference? Science = Understand Things Engineering = Build Things.
GLAST LAT Project ISOC Peer Review - March 2, 2004 Document: LAT-PR Section 2.3 Verification and Validation 1 Gamma-ray Large Area Space Telescope.
Proposed MITHI Concept Paper
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
TEMPO Mission Project July 23, 2013 Project Manager: Alan Little.
Fermi Large Area Telescope (LAT) Integration and Test (I&T) Data Experience and Lessons Learned LSST Camera Workshop Brookhaven, March 2012 Tony Johnson.
OSIRIS-REx Asteroid Sample Return (NASA New Frontiers Program)
Data processing group. General study of data processing architecture: - overall definition of the data processing functions - share of tasks between on-board.
Aerospace Testing 2006 A Centralized Approach To Ground Support Software To Reduce Technical Risk and Overall Mission Costs Thomas Hauck GSE Software,
SGS: Activities and Requests Helen Middleton. Hermean Environment Working Group Meeting | SGS Team | Key Largo | 16/05/2013 | Slide 2 Contents 1.ESAC.
Student Satellite Project Tracking, Telemetry & Command UASat Progress Review Tracking, Telemetry and Command (TTC) January 26, 1999 Dana Irvin, Team Leader.
TPF Development Process Flow. Major Project* Process Steps Project Inception Research and Design Solution Construction Testing Production/Implementation.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Intro: FIT1001 Computer Systems S Important Notice for Lecturers This file is in skeleton form only Lecturers are expected to modify / enhance.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
Context Diagrams. What are dataflow diagrams used for? Dataflow diagram  A graphical representation that depicts information flow and the transforms.
NIRSpec Status and PDR Results Jeff Valenti & Mike Regan 2006 March 16 TIPS/JIM.
Sarat Sreepathi North Carolina State University Internet2 – SURAgrid Demo Dec 6, 2006.
SE&I Pre-Proposal Meeting GSFC - JPL Systems Engineering Management Colleen McGraw.
P:/phaseiii/organization design/course 1/presentations/module 1.1.ppt 1 Module 1.1: INTRODUCTION.
Phase 3 The Software Requirements Specification. After review of the customer’s System Spec. After educated analysis Preliminary design A technical, software.
1/15/02Bowman/Harch1 CONTOUR Science Ops Update Ann Harch Cornell University (607) Alice Bowman Applied Physics.
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
CIVA Status Venezia, Palazzo Cavalli Franchetti March 31, 2009 Philae Science Team Meeting.
GLAST Science Support Center June 21, 2007 Getting Involved with GLAST GLAST Guest Investigator Program David Band, GSSC CRESST/GSFC/UMBC.
GLAST Science Support Center May 8, 2006 GUC Meeting Status of GLAST User Support David Band (GSSC/JCA-UMBC)
Stephen Ambrose GOES-R Data Operations Manager (DOM) OSPO/SPSD March 12, 2013 GOES-R Ground Segment Project Data Operations Support Team System Validation.
Worldwide Protein Data Bank wwPDB Common D&A Project Full Project Team Meeting Rutgers March 16-19, 2010.
Robotics Engineering Science vs Engineering What’s the difference? Science = Understand Things Engineering = Build Things.
Solar System Division DVK, 10 Jul 2001 Rosetta Science Operations Experimenter to RSOC interfaces Detlef Koschny Space Science Department ESA/ESTEC
1/106 December 2001Rosetta SOWG Status of the Rosetta Project TestBed (PTB) P. van der Plas Modelling and Simulation Section ESA/ESTEC ESA/Estec 6 December.
Tracing the JWST Proposal from User Interface to Commanding of an Instrument Margaret Meixner & WIT Balzano, Robinson & CMD.
SITES SOFTWARE APPLICATION SEMINAR INTRODUCTION to SITES __________________________ SITES 2005 INTEGRATED DEVELOPMENT ENVIRONMENT for WATER RESOURCE SITE.
Page 1 End-to-End Process Flow Visualization – Day 2 Jan, 2014.
WG 2/3 Splinter meeting Dec. 6, 2010 ESOC Darmstadt for WG2 & WG3: D. Bockelée-Morvan C. Engrand E. Grün H. Krueger.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
IN THIS Slide show YOU WILL LEARN ABOUT ALL VERSIONS OF "MS OFFICE"
The road to the first E2E tests
SOC-Produced Auxiliary data
RSOC Overview at SWT #26, 11/12 June 2009
Instrument Teams to SOC Test Specifications
SPIS-Services European professional services for spacecraft charging
Observatory Control System
Background D/HSO Announcement of Opportunity (July 2011) in coordination with D/EOP soliciting scientific experiments for the International Space Station.
Detlef Koschny Research and Scientific Support Department ESA/ESTEC
ATom data management plan:
SERENA-STROFIO Data Processing Status& Plans
The RSP Archive System RSP Archive Concept Review 28 September 2017
DSP Operation Management Center (DOMC)
GLAST Large Area Telescope:
NASA Independent Reviews -Lessons Learned-
Digital Sub-System Dorothy Gordon.
Systems Engineering Management
Software Development Process
OWASP Plan – Security Assurance Testing of Virtual Worlds (SATVW)
XXM Status, Priorities, Plans, and Activities Icy Satellite Science
Jim Aloise System Programmer
Inspection Metrics Gerry Fallon.
Click to add title Planning for LSST Verification George Angeli LSST All Hands Meeting Tucson August 15, 2016.
Observatory Control System
Summary.
Scale of things : Big and Small
Metrics for process and Projects
Anna Fritts, Ph.D. SEALT March 2005
PCS Technical Board 27th February 2018, Vienna.
Main information on the «WORLD SPACE OBSERVATORY» project
Web Service Security support in the SSE Toolbox
Robotics Engineering Science vs Engineering What’s the difference?
Presentation transcript:

Rosetta Science Ground Segment Overview Overview of the system and the planning process Status of the software system

Rosetta Operations Flow

SGS Software System Status First version (0.1) released Observation management modules (Pointing, Target, Conditions) Scheduler integrated Auxiliary Data Converter SGS Data base Spacecraft & Payload Resource Simulator Skeleton Plan Software toolkit Version 0.1.1 will be released 22nd of March for PI team assessment. Additional functionality Complete Observation Management on observation level (Skeleton Plan outputs & Complete Obs. Definitions)

SGS Software System Status (2) System was presented in detail at SOWG in Jan. All PIs were asked to nominate representative for software testing Starting with version 0.1.1 SGS System passed Preliminary Design Review on 13th of January