eXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5

Slides:



Advertisements
Similar presentations
Summary of Projects Kai Hock. LHC Upgrade About the project LHC is a 27 km circular accelerator in CERN that produces 7 TeV protons. The project is to.
Advertisements

Simulation Study For MEIC Electron Cooling He Zhang, Yuhong Zhang Thomas Jefferson National Accelerator Facility Abstract Electron cooling of the ion beams.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP5 XBEAM Steering Meeting.
ICFA Beam Dynamics Panel Update and ABDW #49  ECLOUD`10 Mark Palmer Cornell University Laboratory for Elementary-Particle Physics.
Alex C. Mueller, MANETEURONS PCC-Meeting, Mainz (Germany), April 2006 EURONS 1st annual report: Generalities (I)  With an EC contribution of 14,056,000.
Message from ACFA Chair C.Zhang IHEP CCAST ILC Accelerator Workshop and First Asian ILC R&D Seminar under JSPS Core University November 5, 2007.
ESPG R. Aleksan November 28 th, 2011 Accelerator R&D Accelerator R&D 1.Introduction 2.Accelerator Science and Technology 3.Conclusion.
Name Event Date Name Event Date 1 CERN W. Scandale & F. Zimmermann HHH, CARE 08, CERN, High Energy High Intensity Hadron Beams
Future Accelerators at the High Energy Frontier
Maurizio Vretenar, CERN. Background 2  EuCARD (and CARE before it) had an enormous impact in structuring and promoting the European R&D on particle accelerators;
UKNF OsC RAL – 31 st January 2011 UKNF - Status, high lights, plans J. Pozimski.
Paris 5 September 2005 HHH Status progress W. Scandale CERN Accelerator Technology Department CARE-HHH Network: coordinators: F. Ruggiero and W. Scandale.
CLIC Implementation Studies Ph. Lebrun & J. Osborne CERN CLIC Collaboration Meeting addressing the Work Packages CERN, 3-4 November 2011.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP5 Extreme Beams &
FP7 - IA EUROLUMI Network Walter Scandale, Frank Zimmermann ESGARD-OMIA meeting CERN,
EXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5 Frank Zimmermann EuCARD-2 Kick-Off Meeting CERN13 June 2013 many thanks to Giuliano Franchetti,
News from ESS Cristina Oyón, Mats Lindroos, Steve Peggs November 2009.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement European Network for.
1 Future Circular Collider Study Preparatory Collaboration Board Meeting September 2014 R-D Heuer Global Future Circular Collider (FCC) Study Goals and.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2 WP5 “XBEAM”
EuCARD-2 WP5 XBEAM & WP1 EuCAN Frank Zimmermann EuCARD-2 Steering Committee Meeting 19 March 2014 with kind input from Kurt Aulenbacher, Marica Biagini,
Welcome !! to the CAoPAC Workshop Carsten P. Welsch.
Use of CLIC zero for Accelerator R&D 10 May 2012 R. Assmann1 CLIC Collaboration Meeting, CERN
HHH From Pipetron to LER: history of a brilliant idea and goal of this workshop Lucio Rossi CERN CARE-HHH workshop on LER CERN -11 October 2006.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
Pushing the space charge limit in the CERN LHC injectors H. Bartosik for the CERN space charge team with contributions from S. Gilardoni, A. Huschauer,
Bad Zurzach, 1-4 December 2014 Stéphane Sanfilippo p. 1 Stéphane Sanfilippo, Paul Scherrer Institut Accelerator activities at PSI Wir schaffen Wissen –
‘Toward TIARA’ Final Plan for the collaborative R&D Program WP4 Presented by Paolo Pierini 26/11/2013.
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
Lucio Rossi The High Luminosity LHC Project Distinguished Lecturer 2013.
CERN participation in EU project CREMLIN CERN-internal introduction meeting July 17 th 2015 Lucie Linssen.
XBEAM-XRING G. Franchetti 14/6/2013 G. Franchetti EuCARD-2 Kick-Off1.
Capabilities and Programmes of STFC’s Accelerator Science & Technology Centre (ASTeC)
ColMat Welcome and Task 1 Ralph W. Aβmann Kick off Meeting of EuCARD/ColMat CERN – June 17 th, Jun 09 1R. Assmann.
WG2: Beam Dynamics, Optics and Instrumentation – Summary
Hosted at KIT (Karlsruhe Institute of Technology)
FCC-ee Interaction Region design
AMICI WP1 – Management, coordination and dissemination
Thomas Schoerner-Sadenius DESY Hamburg, Germany
ICE SECTION The coolest place to be! Elias Métral
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Roadmap for ARIES APEC Frank Zimmermann, Giuliano Franchetti
From EuCARD-2 to ARIES TIARA Meeting, Warsaw, 19 June 2017
J. Alexander + Cornell accelerator group Cornell University
for the EURISOL Steering Committee
Accelerator Research and Innovation for European Science and Society
SLS Vertical Emittance Tuning
Beam Dynamics meets Vacuum, Collimations, and Surfaces
R&D Topics for FOA Funding Proposals
HIGHLIGHTS OF LAST MONTHS OF HSS ACTIVITIES
Future Collider Projects at CERN
Design Study on High Luminosity Colliders EUROCRAB submitted to EU-FP7
eXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5
CASA Collider Design Review Retreat Other Electron-Ion Colliders: eRHIC, ENC & LHeC Yuhong Zhang February 24, 2010.
Overview of SRF system of Ring and Linac (1)
W. T. Weng Brookhaven National Laboratory
Why is the CBETA Important for the Electron Ion Colliders?
AMICI WP1 – Management, coordination and dissemination
EuCARD-2 WP5 XBEAM & WP1 EuCAN
TOP6 – WP4 Coordination and Management JPICH Coordination Office
CLIC damping rings working plan towards the CDR
A High Intensity Neutrino Oscillation Facility in Europe
High Energy High Intensity Hadron Beams
TOP6 – WP4 Coordination and Management JPICH Coordination Office
FY18-19 EIC R&D FOA FY 2018 Research and Development for Next Generation Nuclear Physics Accelerator Facilities Web site:
Comments to the Report of the Community Review of EIC Accelerator R&D for the Office of Nuclear Physics, February 13, 2017 (60 pages) By Haipeng Wang,
Optimization of JLEIC Integrated Luminosity Without On-Energy Cooling*
Presentation transcript:

eXtreme BEAMs (XBEAM): Exploring the Accelerator Frontiers – WP5 Frank Zimmermann EuCARD-2 Kick-Off Meeting CERN13 June 2013 many thanks to Giuliano Franchetti, Mohammad Eshraqi & Marica Biagini

XBEAM network platform for information exchange and collaboration between communities e.g. proton, electron, nuclear physics, particle physics accelerator researchers; magnet designers; SRF experts; European industry, European universities and laboratories; pan European organizations (such as ESA) to study and overcome critical accelerator limitations, to boost performance of present and future accelerators or colliders beyond the state of the art help present projects (e.g. HL-LHC, FAIR, ESS, SuperKEKB,…) to reach their goals lay the groundwork for next generation of extreme-performance accelerators in Europe (e.g. HE-LHC/VHE-LHC, LHeC, MESA, TLEP,…)

XBEAM network XBEAM will push all accelerator frontiers: luminosity, energy, beam power, beam intensity, and polarization luminosity: x10-100 (1000) higher than present state of the art beam power: x10 higher beam intensity: x10 higher polarization: ≥60% (p), ≥30% (e+), ≥80-90% (e-)

XBEAM structure Task 5.1. Coordination and Communication coordinated by F. Zimmermann (CERN) Task 5.2. Extreme colliders (XCOLL) coord: F. Zimmermann (CERN), M. Biagini (INFN-LNF) Task 5.3. Extreme performance rings (XRING) coord: G. Franchetti (GSI), J. Struckmeier (GSI) Task 5.4. Extreme SC linacs (XLINAC) coordinated by M. Eshraqi (ESS) Task 5.5. Extreme polarization (XPOL) coordinated by K. Aulenbacher (JGU Mainz)

Coordination & Communication– 5.1 objectives & work: coordinate and schedule WP tasks, adjusting activities according to priorities and budget monitor the work and use of resources, informing project management and WP participants ensure compliance with contract obligations and disseminate achievements organization of XBEAM internal steering meetings organization of and/or support to activity workshops or specialized working sessions, implying the attendance of invited participants from inside and outside the consortium

Common Elements & Objectives annual workshops with publication of proceedings as well as topical mini-workshops - similar to past CARE-HHH and EuCARD-AccNet events support visitors and visits between partner institutes summer students; supporting travel of technical students, PhD students and postdocs/fellows disseminating network results by journal publications and by seminars at partner institutes, conferences, European universities, and via web documentation integrate efforts of large laboratories, smaller institutes and universities; form and maintain community capable of advancing technical realization & scientific exploitation of European accelerator infrastructure create synergies across communities, countries & continents

work plan for each task: identify issues for each project tentative workshop schedule, dates & location web site(s) ….

Extreme colliders (XCOLL) – 5.2 objectives & work: realize full potential of the LHC, by means of LHC luminosity and energy upgrades, and/or extension to LHeC, HE-LHC, VHE-LHC maximize performance of future Super B, Higgs and t-c factories (SuperB, SuperKEKB, TLEP, SAPPHiRE), and hadron-lepton colliders (LHeC, eRHIC, MEIC) and IRIDE explore key items for a (Very) High-Energy LHC (injector, synchrotron radiation, beam dynamics, magnets) provide guidance for the LHC injector upgrade become THE European forum for discussing key aspects of extreme performance colliders ultimate limitations, optimum solutions, beam experiments bring together experts in collider beam dynamics with specialists of magnets & collimation to find optimum solutions

Extreme colliders (XCOLL) – 5.2 projects:

Extreme colliders (XCOLL) – 5.2 example issues: inter-WP issues: top-up injection (e±) off momentum aperture beam-beam effects incl. beamstrahlung cooling of hadron beams, e.g. CeC e+ sources & polarization vertical emittance tuning (WP6) RF & energy efficiency (WP3, 5.3) draft near-term schedule (preliminary): first workshop 16-18 October (TLEP & LEP3) with WP5.5 WS on SuperKEKB commissioning, November 2013 joint workshop TLEP & VHE-LHC, February 2014 joint mini-workshop with ICAN on gg colliders & Higgs factories

Extreme colliders (XCOLL) – 5.2 continuing/new collaborations: CONACyT/CINVESTAV Mexico - 2-3 new students ESA ICAN new!

Extreme rings (XRING) – 5.3 objectives & work: help optimize performance of FAIR, ISIS and PSI-HIPA, and guide the upgrade strategy for the LHC injector complex studies on critical beam diagnostics (e.g. continuous emittance & beam-loss measurements) ultimate limitations, optimum solutions, beam experiments studies on advanced FFAGs designs, including machine experiments at EMMA become THE European forum for discussing performance limitations of high-intensity high-brightness hadron rings bring together experts in beam dynamics with specialists of magnets and collimation to arrive at optimum upgrade solutions with risk mitigation

Extreme rings (XRING) – 5.3 projects: The high-intensity proton accelerator (HIPA) G. Franchetti

Extreme rings (XRING) – 5.3 high intensity issues: Long term effect of space charge Lattice modeling Diagnostics for high intensity Benchmarking experiments G. Franchetti

Extreme rings (XRING) – 5.3 synergies: overlapping topics: high intensity beam dynamics, lattice modeling, benchmarking experiments G. Franchetti

Extreme rings (XRING) – 5.3 example issues (preliminary): FAIR ISIS/EMMA LIU G. Franchetti

2nd workshop (M24), SpaceCharge2014 3rd workshop (M36) Extreme rings (XRING) – 5.3 example schedule (preliminary): 1st workshop (M12) magnets and nonlinear beam dynamics. Measurements of multipoles for non-circular chambers. ….. Space charge in diagnostics (IPM, tunes, etc.)… 2nd workshop (M24), SpaceCharge2014 simulations and experiments with high intensity beams 3rd workshop (M36) topical 4th workshop (M48), SpaceCharge2016 G. Franchetti

Extreme linacs (XLINAC) – 5.4 objectives & work: help optimize performance of high-power SC linacs such as ESS, FRIB, HP-SPL, MYRRHA, MESA, eRHIC, or Project-X study beam dynamics issues, e.g. space charge, beam break up, ion effects, halo generation, beam losses, recirculation aspects, and energy recovery ultimate limitations, optimum solutions, beam experiments advance crucial beam diagnostics like measurements of beam profile and emittance become THE European forum for discussing performance limitations of high-intensity high-power SC linacs, and optimizing designs of European SC linac facilities. bring together experts in beam dynamics with specialists of SRF and cryogenics to arrive at optimum upgrade solutions

Extreme linacs (XLINAC) – 5.4 projects:

Extreme linacs (XLINAC) – 5.4 example issues: inter-WP issues: ions sources high power couplers modulators cavity failure due to beam loss (SNS) increased Field/Yield of SC cavities, XFEL,.. HOMs and SOMs (WP12.4) Reliability and availability (WP4) IOTs, other RF sources (WP3.3) example schedule (preliminary): first workshop at ESS some time in November other workshops in different labs two workshops per year at least two workshops per subject (see above)

Extreme linacs (XLINAC) – 5.4 a special message from the XLINAC coordinator: 5 doctoral positions are being opened at ESS [Application deadline 04 September 2013]   The subjects are related to accelerator science, XLINAC, and especially to SRF. Norway guarantees the financial support and ESS chooses the candidates.  Candidates shall apply through the Norwegian web site shown in: http://esss.se/vacancies.  In case of questions please contact Mohammad Eshraqi.

Extreme polarization (XPOL) – 5.5 objectives & work: help reach the lepton and hadron beams of highest possible polarization, for future projects such as SuperB, LHeC, MESA, TLEP, SAPPHiRE and RHIC-II/e-RHIC study polarized sources, preservation of polarization during acceleration, spin manipulation, depolarization mechanisms, and high-accuracy polarimetry ultimate limitations, optimum solutions, beam experiments become THE European forum for discussing performance limitations of polarized particle beams bring together experts in beam dynamics with specialists on sources, magnets and beam instrumentation as well as particle physicists and laser experts to arrive at optimum solutions

Extreme polarization (XPOL) – 5.5 projects:

Extreme polarization (XPOL) – 5.5 example issues: inter-task issues: polarimetry Siberian snake schemes polarization for hadron beams polarization for LHeC polarization in SuperKEKB & TLEP polarized sources (with WP 5.2) depolarization e.g. due to beam-beam (with WP 5.2) draft near-term schedule (preliminary): first workshop 16-18 October (TLEP & LEP3) – with WP5.2 topical workshop on polarimetry in 2014

deliverables : Preliminary strategies, optimization, limitations, paths & parameters for future hadron & lepton colliders; future high-performance hadron rings; future high-power high-current SC linacs; and future polarized beams [month 36] Strategy for future extreme beam facilities; [month 48]

Work package(s) involved milestones : Milestone name Work package(s) involved Expecte d date Means of verification XCOLL topical workshop 5 (Task 5.2) M12 XCOLL web pages XRING topical workshop 5 (Task 5.3) XRING web pages XLINAC topical workshop 5 (Task 5.4) XLINAC web pages XPOL topical workshop 5 (Task 5.5) XPOL web pages M24 M36 M48

XBEAM time line & other community meetings XBEAM takes over / sponsors European meetings ≥6 workshops ≥6 workshops Tentative schedule ≥ 5 topical meetings ≥5 topical meetings SC-2013 (CERN) EuCARD-2 Kick-Off 1st W 2nd W 3rd W 4th W EuCARD 1 2 3 4 time-line 2012 2013 2014 2015 2016 2017 Meetings or Conference Other IPAC’14 (Germany) IPAC’13 (China) HB2014 (USA) IPAC’15 (USA) IPAC’16 (Korea) HB2012 HB2016 G. Franchetti

tomorrow, Friday 14 June 9:00-12:00 next step: 1st XBEAM meeting, room B, tomorrow, Friday 14 June 9:00-12:00 photo courtesy Marica Biagini