The EM/HQ Perspective on Readiness Review

Slides:



Advertisements
Similar presentations
How Will it Help Me Do My Job?
Advertisements

Course Material Overview of Process Safety Compliance with Standards
Contract and Project Management: A Field Perspective Moderator Michael Peek, PE CCE CFM Office of Engineering and Construction Management.
Quality Assurance Update Presented byRay Hardwick Presented by: Ray Hardwick.
Department of Energy Quality Assurance Updates Frank Russo Deputy Assistant Secretary Office of Corporate Performance Assessment Energy & Environmental.
1 Integration of EMS and ISMS at the Idaho Cleanup Project Kliss McNeel November 1, 2006.
THE PROJECT TEAM TYPICAL REQUIREMENTS AND RESPONSIBILITIES OF THE PROJECT TEAM TRADITIONAL TEAM ORGANIZATION AND VARIATIONS THE OWNER’S TEAM THE DESIGN.
Expanded Version of COSO a presentation by Steve Wadleigh Expanded Version of COSO a presentation by Steve Wadleigh Standards for Internal Control in the.
Opportunities for RAC Participation. Three Part discussion General presentation; Example of oil and gas decision making; and Panel Discussion of RAC involvement.
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
TRU Waste Processing Center Culture and Successful Implementation of an ISO Certified Environmental Management System Presented at the DOE ISM Conference.
CD NS Chief, Defense Nuclear Safety FIRE PROTECTON FUNCTIONAL AREA CDNS BIENNIAL REVIEWS May 15, 2012 Carl Sykes.
Accelerator Safety Workshop SLAC Scott L. Davis Accelerator Safety Program Manager – SC Office of Science, U.S. Department of Energy Progress on.
Readiness Review Course November Nov Readiness Review Course Introduction – Mod 1.
Work Planning & Control for “All” Activity Level Work Tim Flake Maintenance Advisor Washington Savannah River Company ISMS Work Shop November 28, 2007.
Safety Analysis Working Group FY2010 EFCOG Semi-Annual Meeting Brad Evans, Chair Pacific Northwest National Laboratory Rob McKeehan, Vice-Chair Oak Ridge.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
Work Planning & Control for R&D Activities – Lessons Learned 2007 ISM Workshop – Brookhaven National Lab John Miller Manager, SRNL Safety Programs Lori.
1 DOE IMPLEMENTATION WORKSHOP ASSESSING MY EMS Steven R. Woodbury
ISMS Best Practices Workshop Initial Steps to Integrate HPI into ISMS Continuous Improvement CH2M HILL Hanford Group, Inc. September 12-13, 2006.
Safety Culture Jim Hutton December 3, Safety Culture at DOE 2 Safety Culture Organizational Culture SCWE Safety Conscious Work Environment Organizational.
Cultivating a Safety Culture within a Creative Environment Frances Alston Manager, Environmental, Safety & Waste Management.
U.S. Department of Energy Environmental Management Los Alamos Field Office Legacy Cleanup Completion Project DOE National Cleanup Workshop September 29,
Departmental Initiative to Enhance Activity-level Work Planning and Control DOE and DOE Contractors Industrial Hygiene Meeting in Conjunction with the.
Using ISMS Principles and Functions in Developing an ARRA Readiness Review Process Presented by Linda K. Rogers Assessments & Readiness Programs Manager.
DOE Order 413.3A Program and Project Management for the Acquisition of Capital Assets Catherine Santana Deputy Director, Project Management Systems, OECM.
DOE Integrated Safety Management (ISM) Conference Knoxville, TN August 24-27, 2009 Colette Broussard, DOE-HQ Office of Quality Assurance Policy.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Facility Evaluation Board Steve Johnson, Manager Operations Evaluation Department.
Presented by: Rick Kendall, NA-17 Integrated Safety Management Best Practices Workshop September 2006; Denver Co. Assessment Criteria and Guidelines for.
Model Contract Implementation at Sandia National Laboratories Risk Based Oversight Dan Pellegrino Sandia Site Office November, 2007.
Integration of Safety into the Design Process Overview of DOE-STD-1189 Richard Black, Director Office of Nuclear & Facility Safety Policy.
ISM at the Savannah River Site Department of Energy Best Practices Workshop Work Planning and Control Tim Flake, Principle Technical Advisor Maintenance.
Integrating EM QA Performance Metrics with Performance Analysis Processes August 26, 2009 Robert Hinds, Manager, Quality Assurance Engineering & Greg Peterson,
HSS Inspection of Environment, Safety, and Health Programs at BNL Accelerator Safety Workshop E. Lessard Collider-Accelerator Department August 12-14,
ISM WORKSHOP April 24-27, 2006 Albuquerque, NM Feedback and Improvement Assessment Results and Path Forward Michael N. Worley Office of Nuclear Energy.
Office of the Under Secretary 1 CENTRAL TECHNICAL AUTHORITY A SYSTEMATIC APPROACH TO NUCLEAR SAFETY Dr. Tim Arcano Deputy Chief of Nuclear Safety Office.
Defense Nuclear Facilities Safety Board September 26, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office of Quality Assurance.
Monitoring the Long-Term Effectiveness of Integrated Safety Management System (ISMS) Implementation Through Use of a Performance Dash Board Process Mike.
Berkeley Lab Exposure Assessment: thoughts after an ISM Audit Tim Roberts, Industrial Hygiene Jim Floyd, ALS LBNL.
ORDER ENVIRONMENTAL PROTECTION PROGRAM WORKSHOP OVERVIEW OF ORDER Larry Stirling
Qualification & Training of Work Planners Steven K. Little Work Control Department Manager.
1 Service Coordinator Orientation FN R. CollESH SectionX8518.
Quality Assurance Briefing Defense Nuclear Facilities Safety Board June 1, 2005 Frank Russo Office of Corporate Performance Assessment Robert Loesch Office.
Audits & DOE Walkthroughs ISO and OHSAS surveillance audits August 18 th – 20 th –CD, ESH&Q, and FESS organizations to be audited Software.
American Recovery & Reinvestment Act Office of Environmental Management Presentation to Regulators March 6, 2009 Cynthia V. Anderson, EM Recovery Act Program.
Environmental Management Division 1 NASA Headquarters Environmental Management System (EMS) Michael J. Green, PE NASA EMS Lead NASA Headquarters Washington,
Regulations Under Revision Hazardous Waste
Safety Configuration Management Process at JLab
BLM Decision Making Process
Planning for Succession
The Readiness Review Process – Mod 2
The ORR/RA and the Authorization Basis May 2005 Revision
OPERATIONAL READINESS PROCESS FOR OPERATIONS MANAGERS AND OSBs
DOE Worker Safety and Health Policy
Readiness Review Course
Corrective Action Plans – Mod 13
ORR Team Leader May 2005 Revision
Readiness Review Course
The Path Forward for WIPP: A State and Local Perspective
Dana Engineering, Inc., PSC UMCDF OPERATIONAL READINESS REVIEW
A Framework for Control
Training Appendix for Adult Protective Services and Employment Supports June 2018.
The Federal Oversight and Contractor Assurance System Directives Safety Culture Improvement Panel Meeting September 7, 2016 Patricia.
Contractor Assurance Systems (CAS) Summit August 23, 2016
Charles Simpson Washington River Protection Solutions May 2018
The Process for Final Approval: Remediation
DOE Office of Security Policy, AU-51 July 2018
Schoolwide Programs.
Ian Evans SSRL Safety Office
HUD’s Coordinated Entry Data & Management Guide
Presentation transcript:

The EM/HQ Perspective on Readiness Review Robert Goldsmith, PhD Director of Operations Oversight EM-62

Office of Operations Oversight EM-60 - Office of Safety Management and Oversight EM-62 - Mission: To determine the effectiveness of Federal and contractor safety and health programs and management systems at EM field sites

EM-62 Oversight Responsibilities Day-to-day oversight of operational safety Line management assessments Integrated Targeted Validation and verification of completed corrective actions Startup and restart of nuclear facilities Timely identification and assistance in correction of deficient safety conditions Line management assessments, consistent with DOE Order 226.1, the DOE Worker Safety and Health Program, and ISMS criteria – targeted is stuff like con ops, work control, radcon, hazardous energy control Completeness of CAs and effectiveness Operational Readiness Reviews/Readiness Assessments

EM-62 Readiness Review Responsibilities Startup Authorities ID OR ORP RL SR WIPP P/P BNL Cat 3 FOM HQ Cat 2 restart Startup authority is Dae S-1 is the startup authority for new Category 1 and 2 Facilities. (NNSA may have had this delegated to S-2 New Category 2 activities in existing facilities have been treated as Cat 2 Restarts (Historically)

EM-62 Readiness Review Responsibilities Review and recommend approval Plan of Action Startup Notification Requests Declaration of Readiness ORRs & RAs Lead, participate or observe Central Technical Authority DNFSB We Review and Recommend where EM has startup authority The Appropriate Startup Authority approves the SNR ORRs – both contractor and field office

EM Recent Experience Most ORRs and RAs executed properly Anomalous events Premature declaration of readiness Site not following its own procedures RA begun before DSA approved Site procedure that almost precluded ORRs Over Last 18 months Premature – Oak Ridge MSRE Not following procedures ID RA w/o DSA – SRS Site Procedures the precluded ORRs – RL “Optics Problem” with GWSB#2 at SRS. This is a new building to hold vitrified waste canisters from the DWPF. Up to 4 of these buildings were analyzed in the DSA. Therefore the site did not consider it a major modification and did not do a PDSA. The regulators saw the situation differently. Both positions can be defended by the Order. The new SRS decision process still does consider this action as requiring a PSA.

Recent EM/HQ Actions Include readiness review process in integrated assessments Developed a DOE O 425.1C CRAD Memo from COO reiterating expectations with regard to DOE O 425.1C Working group with DOE-ID, CWI, EM, HSS, CTA EM Field SRS: New Decision Process in Place RL: Revised Readiness Procedure Ines memo: SNRs due 1/31 and quarterly Approved DSA before ORR/RA Working group with DOE-ID, CWI, EM, HSS, CTA To develop comprehensive plan that addreses what facilities are needed to carry out the cleanup mission, what facilities are needed, what is the AB umbrella for these facilities, what exemptions are required, what can we do at HQ to streamline exemption process, and what changes or interpretive guides can we make to minimize the level of subjectivity for 425?

Some EM issues with DOE O 425.1C Readiness Assessments are intended to be highly flexible What is an initial startup? What is a new facility? What is a major/substantial modification? What should follow a contractor RA? Need for S-1 approval of new Cat 2 facilities? Readiness Assessments are intended to be highly flexible, enabling a broad range of scope and depth – this may not be well embraced throughout the complex and regulators. Other processes should not be used to diminish the RAs domain or preclude sound professional judgment. RAs as defined in the Order, and even more so in STD-3006, are intended to be very flexible.  Also, 3006 clearly states in section
.10.1(8), "There is flexibility within the expectations for an RA. Therefore, it should not be necessary for the contractor to define any other readiness review processes."  Initial startups – new nuclear activity in existing facility; new equipment; existing nuclear process that moves to different locations (burial grounds, waste drums). S-1 approval carries a high overhead that doe not necessarily improve safety. Incentive to game the system to avoid the overhead.

Workshop Should Consider Recommendations for changes to Order and associated standards and guides Consensus on key definitions Template for readiness determination site process, including documentation Standardized CRAD DOE library of precedents Consider not making changes. The PDSA standard STD-1189 (in draft) has a definition of new facility. This will pre-empt and resolve some of our issues. Standardized CRAD- so sites know what to expect and reviewers know what to review.