Moroccan Grid Infrastructure MaGrid

Slides:



Advertisements
Similar presentations
CBPF J. Magnin LAFEX-CBPF. Outline What is the GRID ? Why GRID at CBPF ? What are our needs ? Status of GRID at CBPF.
Advertisements

Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
- CENTRU DE RESURSE GRID ICI - Bucharest 1 Grid site RO-12-ICI Grid site RO-12-ICI Bildea Ana ICI Bucharest, December 5, 2008.
Site Report HEPHY-UIBK Austrian federated Tier 2 meeting
IFIN-HH LHCB GRID Activities Eduard Pauna Radu Stoica.
Bondyakov A.S. Institute of Physics of ANAS, Azerbaijan JINR, Dubna.
Makrand Siddhabhatti Tata Institute of Fundamental Research Mumbai 17 Aug
Cambridge Site Report Cambridge Site Report HEP SYSMAN, RAL th June 2010 Santanu Das Cavendish Laboratory, Cambridge Santanu.
ScotGrid: a Prototype Tier-2 Centre – Steve Thorn, Edinburgh University SCOTGRID: A PROTOTYPE TIER-2 CENTRE Steve Thorn Authors: A. Earl, P. Clark, S.
GridKa SC4 Tier2 Workshop – Sep , Warsaw Tier2 Site.
Grid Infrastructure for the ILC Andreas Gellrich DESY European ILC Software and Physics Meeting Cambridge, UK,
How to join the CYCLOPS VO Marco Verlato CYCLOPS Second Training Workshop 5-7 May 2008 Chania, Greece.
Romanian Tier-2 Federation One site for all: RO-07-NIPNE Mihai Ciubancan on behalf of IT Department.
Company LOGO “ALEXANDRU IOAN CUZA” UNIVERSITY OF IAŞI” Digital Communications Department Status of RO-16-UAIC Grid site in 2013 System manager: Pînzaru.
Tier2 Centre in Prague Jiří Chudoba FZU AV ČR - Institute of Physics of the Academy of Sciences of the Czech Republic.
CEOS WGISS-21 CNES GRID related R&D activities Anne JEAN-ANTOINE PICCOLO CEOS WGISS-21 – Budapest – 2006, 8-12 May.
INFSO-RI Enabling Grids for E-sciencE Introduction to Grid Computing, EGEE and Bulgarian Grid Initiatives - Plovdiv,
KOLKATA Grid Site Name :- IN-DAE-VECC-02Monalisa Name:- Kolkata-Cream VO :- ALICECity:- KOLKATACountry :- INDIA Shown many data transfers.
Eine Einführung ins Grid Andreas Gellrich IT Training DESY Hamburg
Grid DESY Andreas Gellrich DESY EGEE ROC DECH Meeting FZ Karlsruhe, 22./
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The GILDA t-Infrastructure Roberto Barbera.
Glite. Architecture Applications have access both to Higher-level Grid Services and to Foundation Grid Middleware Higher-Level Grid Services are supposed.
30/07/2005Symmetries and Spin - Praha 051 MonteCarlo simulations in a GRID environment for the COMPASS experiment Antonio Amoroso for the COMPASS Coll.
HEP SYSMAN 23 May 2007 National Grid Service Steven Young National Grid Service Manager Oxford e-Research Centre University of Oxford.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE Site Architecture Resource Center Deployment Considerations MIMOS EGEE Tutorial.
Site Report: Prague Jiří Chudoba Institute of Physics, Prague WLCG GridKa+T2s Workshop.
The EPIKH Project (Exchange Programme to advance e-Infrastructure Know-How) The Egyptian Grid Infrastructure Maha Metawei
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Progress report from University of Cyprus.
Materials for Report about Computing Jiří Chudoba x.y.2006 Institute of Physics, Prague.
BaBar Cluster Had been unstable mainly because of failing disks Very few (
TP: Grid site installation BEINGRID site installation.
Ismayilov Ali Institute of Physics of ANAS Creating a distributed computing grid of Azerbaijan for collaborative research NEC'2011.
Evangelos Markatos and Charalampos Gkikas FORTH-ICS Athens, th Mar Institute of Computer Science - FORTH Christos.
FP6−2004−Infrastructures−6-SSA E-infrastructure shared between Europe and Latin America The GILDA t-Infrastructure Roberto Barbera.
Instituto de Biocomputación y Física de Sistemas Complejos Cloud resources and BIFI activities in JRA2 Reunión JRU Española.
INFN/IGI contributions Federated Clouds Task Force F2F meeting November 24, 2011, Amsterdam.
HLRmon Enrico Fattibene INFN-CNAF 1EGI-TF Lyon, France19-23 September 2011.
INFSO-RI Enabling Grids for E-sciencE Turkish Tier-2 Site Report Emrah AKKOYUN High Performance and Grid Computing Center TUBITAK-ULAKBIM.
Tier2 Centre in Prague Jiří Chudoba FZU AV ČR - Institute of Physics of the Academy of Sciences of the Czech Republic.
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
CNAF - 24 September 2004 EGEE SA-1 SPACI Activity Italo Epicoco.
Grid Technology in Production at DESY Andreas Gellrich * DESY ACAT May 2005 *
NDGF Site Report Mattias Wadenstein Hepix 2009 spring, Umeå , Umeå University.
GridMaGrid Users & Applications Conclusions 16/ Grid activities in Morocco Abderrahman El Kharrim CNRST - MaGrid Team Morocco Grid Workshop - Rabat,
CESGA QR2 SA1-SWE Partner Coordination Meeting 2 CICA, Sevilla
Kilian Schwarz ALICE Computing Meeting GSI, October 7, 2009
Brief introduction about “Grid at LNS”
WLCG IPv6 deployment strategy
Pete Gronbech GridPP Project Manager April 2016
The Beijing Tier 2: status and plans
e-Infrastructures in Algeria
IBCP - CNRS STATUS Christelle Eloto Lyon - France
Andreas Unterkircher CERN Grid Deployment
LCG Deployment in Japan
Grid Computing for the ILC
Christos Markou Institute of Nuclear Physics NCSR ‘Demokritos’
Update on Plan for KISTI-GSDC
The EUMEDGRID-Support Infrastructure
Partner Status HPCL-University of Cyprus
Overview of IPB responsibilities in EGEE-III SA1
Grid Services Ouafa Bentaleb CERIST, Algeria
UTFSM computer cluster
Статус ГРИД-кластера ИЯФ СО РАН.
Interoperability & Standards
Pierre Girard ATLAS Visit
The GENIUS portal and the GILDA t-Infrastructure
Overview of gLite Middleware
GRIF : an EGEE site in Paris Region
Installation/Configuration
The LHCb Computing Data Challenge DC06
Presentation transcript:

Moroccan Grid Infrastructure MaGrid

Outlines - MaGrid ressources - MaGrid CA - Applications & Users

Goal of MaGrid Build the Moroccan infrastructure for a power computation dedicated to scientific researchers. Allow to Moroccan scientific community the increase of relationship at a national and international scale.

MaGrid ressources (MA-01-CNRST) Node Name Services CPU RAM Storage OS M/W bdii.magrid.ma BDII (Not installed yet) 3 GHz Intel Xeon With HT 1 GB 320 Gb SL 4.8 /32bit gLite 3.1 wms.magrid.ma WMS,LB (Not installed yet) voms.magrid.ma VOMS (Not installed yet) ce1.cnrst.magrid.ma CE ui.magrid.ma UI se1.cnrst.magrid.ma DPM-SE, SRM 2*2,2 GHz AMD Opteron 8 GB 8 Tb SL 4.8/64bit wn1.cnrst.magrid.ma WN 2*3 GHz Intel Xeon With HT 2 GB 80 Gb wn2.cnrst.magrid.ma wn3.cnrst.magrid.ma wn4.cnrst.magrid.ma wn5.cnrst.magrid.ma BDII, WMS, LB, VOMS for MaGrid are not configured yet !!!

MaGrid ressources (MA-02-CNRST) Node Name Services CPU RAM Storage OS M/W ce2.cnrst.magrid.ma CE 3 GHz Intel Core 2 Duo 2 GB 80 Gb SL 5.4 /64bit gLite 3.2 ui2.magrid.ma UI wn001.cnrst.magrid.ma WN wn002.cnrst.magrid.ma wn003.cnrst.magrid.ma wn004.cnrst.magrid.ma wn005.cnrst.magrid.ma wn006.cnrst.magrid.ma wn007.cnrst.magrid.ma Wn008.cnrst.magrid.ma Will be operational as soon as possible, and other resources can be added

MaGrid ressources (Topology of today)

MaGrid ressources ( Topologie 2011) Migration to SL5.4/64bit and gLite3.2 Futur site with SL5.4/64bit gLite3.2 SL5.4/64bit gLite3.2

MaGrid CA MaGrid Certification Authority has installed and accredited since 2007. Machine Service OS PKI Offline Machine (CA) CA, Node management Fedora 4 OpenCA 0.9.3 Online Machine (RA) (https://ra.magrid.ma) RA, Node management, PUB Certificates Number Valid Expired Revoked Users 37 20 3 14 Servers - se1.cnrst.magrid.ma - mon1.cnrst.magrid.ma - ce1.cnrst.magrid.ma - ra.magrid.ma - se2.cnrst.magrid.ma - ce2.cnrst.magrid.ma 10 6 4

MaGrid Applications & Users SUPPORTED APPLICATION Yes No SUPPORTED VO Users (Number) EGEE Applications - ATLAS (HEP) X ATLAS, OPS 11 - CMS (HEP) - ALICE (HEP) - LHCb (HEP) - Wisdom (Biomed) BIOMED - Gate (Biomed) EUMED Applications - CODESA3d EUMED - Eumed applications ported in EGASP-1 Cairo National Applications - Molpro (Chimistry) MAGRID (To be installed) 12 (4 universities) - Simulation with Fortran (Physics) 1 - Simulation with Scilab (Signal treatment) X (in progess) 2

Next actions Add more resources to the 2 sites of CNRST. Configure the grid services such as BDII, WMS, LB and others .. Install Athena and Ganga software Provide multiple sessions of training for grid users and administrators Perform the MaGrid NGI Joining EGI as an observer member !!!

Thanks …