Rheinisches Institut für Umweltforschung RIU Abt. Planetare Forschung

Slides:



Advertisements
Similar presentations
Rosetta_CD\PR\what_is_RS_v4.ppt, :45AM, 1 Mars Data Workshop Mars Express Radio Science MaRS Data Products, Part II Martin Pätzold, Silvia.
Advertisements

1 Chelmsford Amateur Radio Society Advanced Licence Course Anthony Martin M1FDE Slide Set 9: v1.0, 24-Aug-2004 (4) Receivers-1 - Parameters Chelmsford.
Applied Computer Science II Chapter 4: Decidability Prof. Dr. Luc De Raedt Institut für Informatik Albert-Ludwigs Universität Freiburg Germany.
Step by Step Instructions for Programming Cross Band Operation
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
Key Technology Overview. All PIR is not Created Equal… Sensors are fine-tuned at the factory for optimum detection for its coverage pattern – no PIR sensitivity.
Power Budgeting in Distributed Systems.  Single transmitter signal distributed to two or more receivers via optical splitters Transmitter Receiver #1.
Applied Computer Science II Chapter 5: Reducability Prof. Dr. Luc De Raedt Institut für Informatik Albert-Ludwigs Universität Freiburg Germany.
SWT 27/11/ Consert W.Kofman, A. Herique, JP. Goutail, A. Roux.
CSC 450/550 Part 2: The Physical Layer. CSC 450/550 Summary (1)Transmission medium (2)* Switching (3)The Nyquist limit (4)The Shannon limit.
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
Q09/2001 The GEO 600 Laser System LIGO-G Z V. Quetschke°, M. Kirchner°, I.Zawischa*, M. Brendel*, C. Fallnich*, S. Nagano +, B. Willke° +, K.
Mixer. Performance Parameters Gain (convolution analysis) Port-to-Port Feedthrough (Noise) (Linearity)
Developing RFID Application In Supply Chain
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
CLIPPING DISTORTION IN LASER DIODE: MODEL, SIMULATIONS AND STATISTICS By: Omar Falou.
ARISSat-1 Critical Design Review Orlando, Feb 15, 2010 U/v Transponder Bill Ress – N6GHz
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
Doc.: IEEE /0161r1 Submission Doc.:IEEE /0537r0 May 11th, 2009 Slide 1 Measured Doppler Frequency in Indoor Office Environment Date:
Martin Hewitson Overview of DC work. GEO DC workshop June DC work Noise characterisation Noise projections, noise sources, noise couplings Calibration.
University of Kansas 2004 ITTC Summer Lecture Series Network Analyzer Operation John Paden.
Characterization of Receiver Response to a Spoofing Attack
TU9 German institutes of technology SEVERAL LOCATIONS TU Berlin, TU Braunschweig, TU Darmstadt, TU Dresden, Leibniz Universität Hannover, Karlsruhe Institute.
Mars Data Workshop Mars Express Radio Science MaRS
1 Summary: Americans Support Increased Economic Aid to Indonesia.
DC Power supply circuit
V f λ.
Scientific Method (Inquiry). What is the scientific method….. ? The scientific method is a ______ for answering questions. process.
Igor Yakushin, December 2004, GWDAW-9 LIGO-G Z Status of the untriggered burst search in S3 LIGO data Igor Yakushin (LIGO Livingston Observatory)
MSC, focus on: WI ghost noise. 1 “Recent” history and effect July 11 July 22 Aug 1 Jul 28 Aug 1 The disturbance, with us since Dec , had disappeared.
REGISTRATION OF SUMMARY IN DIGITAL PORTFOLIO 1 st minute.
LHC Beam Commissioning, LHC Q Stability Revisited M. Gasior & Ralph J. Steinhagen,
IT-101 Section 001 Lecture #15 Introduction to Information Technology.
DBM 265 Week 1 Summary Check this A+ tutorial guideline at M-265/DBM-265-Week-1-Summary For more classes visit
DBM 265 Week 2 Summary Check this A+ tutorial guideline at M-265/DBM-265-Week-2-Summary For more classes visit
DBM 265 Week 3 Summary Check this A+ tutorial guideline at M-265/DBM-265-Week-3-Summary For more classes visit
DBM 265 Week 4 Summary Check this A+ tutorial guideline at M-265/DBM-265-Week-4-Summary For more classes visit
DBM 265 Week 5 Summary Check this A+ tutorial guideline at M-265/DBM-265-Week-5-Summary For more classes visit
DBM 384 Team Assignment CIF Expanded Check this A+ tutorial guideline at 384/DBM-384-Team-Assignment-CIF- Expanded.
DBM 384 Week 4 Learning Team Executive Summary Memo Draft Check this A+ tutorial guideline at 384/DBM-384-Week-4-Learning-Team-
DBM 384 Week 5 Learning Team Specialized Database Executive Summary Check this A+ tutorial guideline at 384/DBM-384-Week-5-Learning-Team-
RSOC Overview at SWT #26, 11/12 June 2009
Max-Planck-Institut für Sonnensystemforschung
Status of the BRAMS project & plans for the future
Using the GAVRT Radio Telescope: The SETI Project
Lutetia Flyby Rosetta Radio Science Investigations RSI
OSIRIS Horst Uwe Keller and the OSIRIS Team
Monitoring glitches in the frequency divider
Status of PLL system of ALS
Virgo Status Detector Status Computing Data Analysis status and Plans
Alignment status & plans
Overview Communication is the transfer of information from one place to another. This should be done - as efficiently as possible - with as much fidelity/reliability.
V f λ.
RF Front End Radio Design- Simulations and Specifications
FOX HUNTING 101 RADIO DIRECTION FINDING TECHNIQUES SAFETY FIRST!
High Performance IF and Transverter Design
Temperature Calibration for the KX3-PX3 Doug Millar K6JEY
Coherence Time Measurement in NTT Lab.
False Radar Pulse Detection on WUR Signals in DFS Channel
DATA COMMUNICATION Lecture-19.
60 MINUTES REMAINING.
Instructor Lesson Plan Unit 1 Basic Troposcatter Theory
SN-553 Frequency Synthesizer
Gravitational radiation from known radio pulsars using LIGO data
Sample Problem c =    c  =  3.00  108 m/s  = 6.0  /s
False Radar Pulse Detection on WUR Signals in DFS Channel
Student Studyguide Unit 1 Basic Troposcatter Theory
Status of the BRAMS network and recent progress
The Vertical Structure of the Martian Ionosphere
Interfacing keyboard with FPGA
Presentation transcript:

Rheinisches Institut für Umweltforschung RIU Abt. Planetare Forschung Rosetta Radio Science Investigations (RSI) Martin Pätzold, Silvia Tellmann Rheinisches Institut für Umweltforschung RIU Abt. Planetare Forschung Universität zu Köln B. Häusler Institut für Raumfahrttechnik, Universität der Bundeswehr München, Germany

Team Status & Recent Activities No changes RSI activities since last SWT: PC9 09.02.2009 Purpose: check the stability of the USO

Reconstructed Transmitted USO Frequencies Switch OFF of USO

Passive Checkout 9

RSI PC9 Measurement Overview ONED-TCXO ONED-USO ONED-TCXO TWOD-X

RSI PC9 Measurement Overview ONED-USO ONED-TCXO TWOD-X

USO measurement: First part End of noisy measurement part Start of USO measurement

USO measurement: First part End of noisy measurement part Start of USO measurement

Noisy Measurement Part: Residual & AGC Signal Level (AGC)

Comparison with typical residual 35 Hz Residual Typical Residual 50 mHz

End of Noisy Measurement Part Residual 3dBm Signal Level (AGC) End of noisy measurement part

End of Noisy Measurement Part (Zoomed in) Residual Signal Level (AGC) End of noisy measurement part

Remaining USO Measurement: Residual Signal Level (AGC) 8dBm TM OFF

Summary Passive Checkout 9 First ~750 s of USO measurement show several frequency jumps Explanation: False Lock on Transponder 2

TM: Transponder 2 RX DC Current

TM: Transponder 2 RX DC Current

Summary Passive Checkout 9 First ~750 s of USO measurement show several frequency jumps Explanation: False Lock on Transponder 2 Happens at start of measurement Lasts for a few minutes Remaining USO measurement as expected! USO behaves quite well!