25th ALICE RRB J. Schukraft

Slides:



Advertisements
Similar presentations
Terzo Convegno sulla Fisica di ALICE - LNF, Andrea Dainese 1 Preparation for ITS alignment A. Dainese (INFN – LNL) for the ITS alignment group.
Advertisements

IV Convegno Nazionale Fisica ALICE, Palau, Andrea Dainese 1 Cosmics in ITS: tracking & alignment A.Dainese (INFN Legnaro) ITS alignment group:
JWG, 14 October, 2009, Vladislav Manko Status of work and plans of the Russian group in the ALICE Collaboration as of October, 2009.
F Antinori - 417th WE-Heraeus-Seminar - Bad Honnef - June Heavy Flavour in ALICE Federico Antinori (INFN Padova & CERN) for the ALICE Collaboration.
WP2: Detector development Summary G. Pugliese INFN - Politecnico of Bari.
12 Dec 2005 J. Schukraft1 ALICE USA ALICE position towards US participation EU participation in emcal Requirements Formal steps & schedule.
First Physics at the LHC ALICE Bjørn S. Nilsen Creighton University.
First Physics at the LHC ALICE Bjørn S. Nilsen Creighton University.
11 CTP Training A.Jusko, M. Krivda and R.Lietava..
October 2010CERN-Korea J. Schukraft1 ALICE Status 8 th CERN-Korea meeting Collaboration News Korean participation General ALICE status report on Wednesday.
M. Gilchriese ATLAS Upgrade Introduction January 2008.
V. Altini, T. Anticic, F. Carena, W. Carena, S. Chapeland, V. Chibante Barroso, F. Costa, E. Dénes, R. Divià, U. Fuchs, I. Makhlyueva, F. Roukoutakis,
ALICE Upgrade for Run3: Computing HL-LHC Trigger, Online and Offline Computing Working Group Topical Workshop Sep 5 th 2014.
Real data reconstruction A. De Caro (University and INFN of Salerno) CERN Building 29, December 9th, 2009ALICE TOF General meeting.
1 ALICE T0 detector W.H.Trzaska (on behalf of T0 Group) LHCC Comprehensive Review, March 2003.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  now recent news on schedule  ‘closure of beam on 31 August’, first injected.
108 Mar 2007L. Musa TPC Commissioning ALICE Technical Forum, CERN, 8 th March 2007 L. Musa Outline Pre-commissioning above ground (2006) Preparing for.
1 CERN related research program in Nuclear Physics High energy nuclear physics –ALICE experiment »Installation and Commissioning »Data taking.
4 th Workshop on ALICE Installation and Commissioning January 16 th & 17 th, CERN Muon Tracking (MUON_TRK, MCH, MTRK) Conclusion of the first ALICE COSMIC.
13 Oct th ALICE RRB J. Schukraft 29 th ALICE RRB Collaboration News Detector Status Physics Results CERN-RRB
The 21st International Conference on Ultrarelativistic nucleus-nucleus collisions, March 30 – April 4, Knoxville, TN Results from cosmics and First LHC.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
The ALICE Experiment at the CERN LHC P. Kuijer for the Alice collaboration ICHEP 2002.
15/2/2006 LHCC Status Report J. Schukraft General News LHC progress & Schedule  continuing well, approx 2-4 month delay in some areas  NEW schedule:
LM Feb SSD status and Plans for Year 5 Lilian Martin - SUBATECH STAR Collaboration Meeting BNL - February 2005.
D0 Status: 04/01-04/08 u Week integrated luminosity –1.7pb -1 delivered –1.5pb -1 utilized (88%) –1.1pb -1 global runs u Data collection s global data.
Early physics at ALICE Francesco Prino (INFN – Sezione di Torino) for the ALICE COLLABORATION XXIV Recontres de Physique de La Vallée d'Aoste, La Thuile,
Jonathan BouchetBerkeley School on Collective Dynamics 1 Performance of the Silicon Strip Detector of the STAR Experiment Jonathan Bouchet Subatech STAR.
First measurements in Pb—Pb collisions at  s NN =2.76 TeV with ALICE at the LHC M. Nicassio (University and INFN Bari) for the ALICE Collaboration Rencontres.
CHIPP meeting Appenberg, 24 Aug 2009 Preparation for LHC beam, Jeroen van Tilburg 1/15 Jeroen van Tilburg (Universität Zürich) LHCb: Preparation for LHC.
LHC Peter Jacobs 06/08/20091 LHC What is ALICE? Status of LHC ALICE readiness for beam ALICE EMCal project.
LHCf Detectors Sampling Calorimeter W 44 r.l, 1.6λ I Scintilator x 16 Layers Position Detector Scifi x 4 (Arm#1) Scilicon Tracker x 4(Arm#2) Detector size.
A. De Caro for the ALICE TOF Offline Group (University of Salerno and INFN)
1 Reconstruction tasks R.Shahoyan, 25/06/ Including TRD into track fit (JIRA PWGPP-1))  JIRA PWGPP-2: Code is in the release, need to switch setting.
17 December 2009J. Schukraft1 First Physics at the LHC seen through the eyes of ALICE.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
DIS 2011, Newport News, April 2011Joakim Nystrand, University of Bergen 1 Small-x and forward measurements in ALICE Joakim Nystrand University of.
Performance Evaluation for Open Charm and Beauty Measurement at LHC ALICE PID capability from λ and K s 0 measurement at LHC ALICE 筑波大学数理物質科学研究科 Kengo.
Monthly video-conference, 18/12/2003 P.Hristov1 Preparation for physics data challenge'04 P.Hristov Alice monthly off-line video-conference December 18,
P. Kuijer1 System run coordinator meeting
First collisions in LHC
Calibration: preparation for pa
eTOF - status and plan CBM-STAR joint Workshop Outline Introduction
TS2 preparatory meeting
Marian Ivanov TPC status report.
ALICE Status Report to LHCC September 2008
ALICE Commissioning: Getting ready for Physics
Analysis and paper on chamber and telescope performance
ALICE Status 4th CERN-Korea meeting
The Silicon Drift Detector of the ALICE Experiment
Approved Plots from CMS Cosmic Runs (mostly CRUZET, some earlier)
ALICE – First paper.
Preparation of LHCb for data taking
IEEE NPSS Real Time Conference 2009
Integration and alignment of ATLAS SCT
ALICE upgrade plans Paolo Giubellino LHCC Upgrades
Experience between AMORE/Offline and sub-systems
Francesco Forti University and INFN, Pisa
TPC status - Offline Q&A
Preparation of the CLAS12 First Experiment Status and Time-Line
Preparation for ITS alignment
High Multiplicity Events in p+p Collisions at LHC Energy
Quarkonium production in p-p and A-A collisions: ALICE status report
Bringing the ATLAS Muon Spectrometer to Life with Cosmic Rays
Jet Measurements with the EMCal of ALICE
11th Pisa meeting on advanced detectors
The LHCb Level 1 trigger LHC Symposium, October 27, 2001
Quarkonium production in p-p and A-A collisions: ALICE status report
First ALICE Results from Proton-Proton Collisions
The LHCb Front-end Electronics System Status and Future Development
Presentation transcript:

25th ALICE RRB J. Schukraft Collaboration News ALICE Status Hardware status Commissioning activities Planning CERN-RRB-2008-115 12 Nov 2008 25th ALICE RRB J. Schukraft

Collaboration News Elections/Nominations New Institutes Houston (USA) EMCAL, Computing Institutes leaving BARC Mumbai (India) leaving ALICE associate member, completed its technical contribution to the PMD electronics Ongoing discussions Comsats, Pinstec (Pakistan) Physics, computing Elections/Nominations Spokesperson: JS re-elected 1.3.2009 until end 2010 Deputy Spokesperson, P. Kuijer (NIKHEF/Utrecht), 2 years (2009-2010) Resource Coordinator: C. Decosse (CERN) (J. de Groot decided to step down end 2008) Special thanks to J. de Groot, first (and only) RC since 1996 Run Coordinator: J. Rak (Jyvaskyula) 1 year (2009) 12/11/2008 25th RRB J. Schukraft

Funding UK : Continued support from STFC for ALICE ALICE & STAR groups merged, will apply at next funding round for Nuclear Physics grant. CERN: ‘White paper money’ CERN share of 2.5 MCHF has been agreed to complete the ALICE detector restore full DAQ capacity, complete TRD/EMCAL services & infrastructure, repay loan to CF for ZDC vacuum chamber additional contributions received (or requested) from other FA MCHF TRD 8.0 5 MEUR, contribution from Germany, agreed early 2006 EMCal 10.0 Estimated CORE equivalent, agreed by US-DOE December 2007. 1.6 1 MEUR, France, IN2P3, agreed 1 MEUR, Italy, INFN, 2008 fraction agreed C/F, C&I 0.2 Extra contribution (.249 MCHF, paid 2007) from France IN2P3 PHOS 15.0 Extra funds for two PHOS modules requested (Russia); 610 kCHF allocated in 2008 to date 12/11/2008 25th RRB J. Schukraft

ALICE Detector Installation mid 2008 Complete: ITS, TPC, TOF, HMPID, FMD, T0, V0, ZDC, Muon arm, Acorde Partial installation: 1/5 PHOS 4/18 TRD 9/48 PMD 0/6 EMCAL ~ 40% DAQ/HLT ALICE Status Installation targets met by mid 2008 12/11/2008 25th RRB J. Schukraft

24 April: Insertion of final TOF super module 12/11/2008 25th RRB J. Schukraft

Installation of final muon chamber 12/11/2008 25th RRB J. Schukraft

Installation 1st PHOS module 12/11/2008 25th RRB J. Schukraft

Formal end of ALICE installation July 2008 12/11/2008 25th RRB J. Schukraft

Data Taking & Commissioning Comissioning runs (24/7) Cosmics I (2 weeks, Dec 2007) local (individual detectors) and start of global (several detectors) commissioning Cosmics II (3 weeks, Febr/Mar 2008) local/global commissioning, first few days of alignment ‘test’ run, magnet commissioning TPC was turned off after ~ 1 week (Drift HV instability, now understood & corrected) Cosmics III (since 5 May 2008 continuous operation 24/7) global commissioning, calibration & alignment production runs Injection tests TI2 dump in June , injection tests August, first circulating beam September observed very high particle fluxes during dumps and even during injection through ALICE 10’s to 1000’s of particles/cm2 with beam screens in LHC and/or TI2 decided to switch off all sensitive detectors during injection SPD, V0 always on (trigger), SSD, SDD, FMD, T0, HMPID, muon trigger occasionally (beam was useful only for a subset of detectors !) > 6 months 24/7 running ~ 6700 shifts (~ 30 MY) + 2800 ‘on call’ 12/11/2008 25th RRB J. Schukraft

Injection tests SPD hits versus bunch intensity (beam through ALICE) FMD event display (1 bunch through ALICE, > 100 000 hits) FMD hits versus SPD hits (beam through ALICE) SPD/SSD, Sunday, 15.6 Dump on TED 12/11/2008 25th RRB J. Schukraft

First beam 10th September SPD hits on 10.9.2008, shortly after 9 am V0 hits on 10.9.2008, shortly after 9 am 12/11/2008 25th RRB J. Schukraft

Luminosity monitor (V0) Double turn, beam 1 back at point 2 ! Single turn 12/11/2008 25th RRB J. Schukraft

Auto-correlation for SPD trigger, with multi-turn correlations Beam pick-up T0 SPD V0 Auto-correlation for SPD trigger, with multi-turn correlations (3564 bunch crossings) Trigger timing (before alignment) versus bunch number single shot for SPD, V0, beam-pickup BPTX, T0 triggers 12/11/2008 25th RRB J. Schukraft

First interactions 12th September Circulating beam 2: stray particle causing an interaction in the ITS ITS tracks on 12.9.2008 7 reconstructed tracks, common vertex 12/11/2008 25th RRB J. Schukraft

TPC Commissioning TPC up and running since end 2007 chamber+FC, gas system, cooling, FEE, Laser, DCS, DAQ, HLT,… noise reduction: modify PS (some occasional excess noise remains in outer parts) replaced several faulty electronics components (FEE, RCU, ..) some IROC decoupling capacitors show leakage after months of operation already several replaced, currently 2 ‘weak’ left + 2 IROCs not operational difficult or no access to parts of the TPC => modify cabling during shutdown TDR: s ~ 1 measured: 0.7-0.8 12/11/2008 25th RRB J. Schukraft

TPC Calibration Gain, drift velocity, ExB, alignment,… Krypton Gain Calibration Gain, drift velocity, ExB, alignment,… Laser, Cosmics, Krypton, drift velocity monitor, gas composition, T/P sensors .. ExB scan (Laser tracks) Drift velocity from Laser (~ 2x10-4) Krypton Calibration chamber gain variation (s ~ 8%) 12/11/2008 25th RRB J. Schukraft

TPC Performance First preliminary results from cosmics Momentum Resolution (uncalibrated) First preliminary results from cosmics dE/dx resolution (PPR goal: ~ 5.5%) < 6% pt resolution (PPR goal: ~ 5% @ 10 GeV) ~ 10% @ 10 GeV w/o calibration Particle Identification 12/11/2008 25th RRB J. Schukraft

Silicon: ITS & FMD status all silicon detectors fully commissioned (Det.,DAQ, DCS, cooling, ..) pixel trigger worked ‘out of the box’ and was heavily used individual bad/noisy channels ~ within specs (<0.15% SPD, FMD, 1.5% SSD, 3% SDD) lost some modules/half-ladders (tracking is sufficiently redundant, so physics impact is minor) (ITS detectors could only be fully tested after cabling on miniframe, i.e. w/o access) SPD: 12.5% half-staves (2 connection, 13 insufficient cooling flow) plan to improve flow regulation for individual circuits next WS SDD: 5% modules (few can be recovered during shutdown) SSD: 3.8% modules, 9% half-ladders mostly Sintef ladders which developed excessive bias current (8/22) FMD: S/N ~ 30 FMD3-o SSD SSD: S/N ~ 40 FMD2-o FMD 1-i FMD 2-i FMD 3-i 12/11/2008 25th RRB J. Schukraft

ALICE Inner Tracking System: Alignment with Cosmics Silicon Pixel Detector (SPD): ~10M channels 240 sensitive vol. (60 ladders)‏ Silicon Drift Detector (SDD): ~133k channels 260 sensitive vol. (36 ladders)‏ Silicon Strip Detector (SSD): ~2.6M channels 1698 sensitive vol. (72 ladders)‏ ITS total: 2.2k alignable sensitive volumes  13k degrees of freedom Alignment using tracks and Millepede program in a hierarchical approach ~50k cosmic  for alignment collected since end of May (~0.1 Hz), using Pixel trigger ITS Event display Distribution of clusters in the 6 layers

ALICE Inner Tracking System: Alignment with Cosmics Preliminary results for SPD (Pixels, ~ 80% prel. aligned): Residual misalignment < 10 m (detector resolution = 12 m in r ) SSD & SDD, as well as ITS/TPC alignment has started (smaller coverage) Track-to-“extra clusters” distance in transv. plane (sensor overlap) Track-to-track (top vs bottom) distance in transv. plane before alignment before alignment after alignment after alignment = 55 m (vs 40 m in simulation without misalignment)‏ = 21 m (vs 15 m in simul. without misalignment)‏

Other Detectors TOF: 2/3 fully commissioned (3 finishing gas tests, several missing DC-DC converters) TOF trigger works very well (noise factor 2 better than in tests) TRD: 4 SM’s installed (2 final ones), noise and L1 trigger ok HMPID: fully commissioned, noise at specs PHOS: 1 module fully commissioned, trigger com. ongoing occasional noise pickup (depends on the day..) Muon tracking: ~ 70% commissioned, noise problem cured in all but station 3 Muon trigger, V0, T0, ACORDE, ZDC: all up and running TRD cosmic HMPID cosmic event (no calib/slewing, offset correction etc..) Oct 08 Jul 08 TOF raw spectra (no calib/slewing, offset correction etc..) 12/11/2008 25th RRB J. Schukraft

Online Continuous online operation since March (24/7) DAQ: 40% HW installed, stable operation up to 500 MB/s transfer, data taking > 3 kHz complete HW for 2009 DCS/ECS: all essential functionality operational, continuous improvement in functionality some problems encountered with scalability (mostly resolved) CTP: some problems with spurious triggers resolved, running well HLT: 500 CPU’s, very successful operation (online reconstruction, data reduction) complete HW in 2009 Aggregated cumulative time in the global partition 12/11/2008 25th RRB J. Schukraft

DAQ: Global Partitions Number of detectors in the global partition Now also runs with large number of detectors run stable over hours with realistic trigger sequences ! (Useful cosmic data taking done for subsets of detectors working with different triggers) 12/11/2008 25th RRB J. Schukraft

Offline & Physics ‘commissioning’ exercise data transfer to T0/T1, prompt reconstruction, prompt calibration, data Q/A Concentrating on early physics at 900 GeV and 10 TeV global event features, pt spectra, particle rations, baryon transport, …. detailed trigger & data taking scenario elaborated fast calibration/alignment/reconstruction prepared daily meetings of ‘first physics task force’ to exercising analysis until mid Sept. 12/11/2008 25th RRB J. Schukraft

Computing Computing Resources (updated after CRSG review) ALICE deficit in 2009 : ~ 25 CPU% , 60% Disk (error found by CRSG), 50% Tape ‘optimistic running scenario’ 107 s, but ALICE pp data depends much less on it ! need 109 pp MB events/year, i.e. 107s@100 Hz or 106s@1000 Hz addressing the shortfall adding resources: partially successful and ongoing in discussion with a number of specific partners redistribution of existing resources between experiments (integral LHC resources much more adequate than differential distribution) CRSG: ‘A very limited degree of redistribution of resources may be advisable in 2009’ ‘living with less’: scenarios & physics impact under discussion with LHCC a modest shortfall may be accommodated with a modest loss of physics … 24/10/2007 23rd RRB J. Schukraft 12/11/2008 25th RRB J. Schukraft 25

Planning Until 12 October Medium term (until LHC restart in 2009) continue cosmic running & consolidation of online software Medium term (until LHC restart in 2009) ‘shutdown mode’, start with activities planned for winter shutdown re-arrange cabling on mini-frame (ITS,TPC) to allow better access to electronics major activity, requiring > 4 months of work both underground & surface detector consolidation TPC capacitors; recover some ITS modules, improve SPD cooling, … detector installation (TRD, PHOS, PMD, EMCAL), … 3 PHOS, 6-8 TRD modules, 2 EMCAL modules, complete PMD Long term: complete detector PMD (2008), DAQ/HLT(2009),TRD (2009), PHOS (2010/11), EMCAL (2010/11) 12/11/2008 25th RRB J. Schukraft

Summary Installation: Commissioning and initial calibration/alignment met all installation goals by mid 2008 Commissioning and initial calibration/alignment went rather well, sometimes even better than expected (e.g. TPC, SPD alignment + trigger) some (mostly minor) hickups / problems (noise, lost channels) / bug fixing to be improved: access to TPC for repairs/FEE exchanges cooling flow of SPD Detector performance better – within - very close to specs (at least as far as could be verified with cosmics) After > 15 years of designing & constructing ALICE we do have a working experiment ready for physics. Thanks to all the Funding Agencies who have made this possible with their strong support over 1½ decades ! 12/11/2008 25th RRB J. Schukraft