EXTENSION ELENA = BUILDING 193 Status of integration

Slides:



Advertisements
Similar presentations
My Life Monday Office safety Keeping you work area clean and tidy
Advertisements

Heritage Hall/Rare Book Collection Renovations, 2012.
Front view of coach house (photographer facing west) Front view of coach house (facing north-west)Side view of coach house (facing south) Rear view of.
Marvin K. Peterson Library Graduate Student Orientation Thursday, August 29, 2013 Hanko H. Dobi, University Librarian.
Kitchen New sandwich prep table. Kitchen New pizza prep table.
Frank’s new apartment In TOULOUSE old new town square.
Campus signage – Internal
To Find and Open Your Locker.  Your locker will either be in the Upper A Hallway or the D Building Hallway.
Drafting symbols and lines
Jo Beth Folger MMF Site and October 14, Conventional Facilities – MMF Presentation Outline Facility Design.
DAQ&CM Infrastructure Paul Drumm. Issue Space is running out! Power supplies, RF system –Big kit, legislation dictates space requirements (not a clear.
Understanding House Plans
Work Station area A & B Reception & Waiting Executive Area A & B.
Developed by: Purdue University Agricultural Safety and Health Program Department of Agricultural and Biological Engineering West Lafayette, IN This material.
CPS welcomes onto the market an excellent 3 bedroom, mid terraced property located in a ideal residential development. Comprising 3 Bedrooms, kitchen,
New to the market is this excellent 3 bedroom Detached property located within the popular Primrose Hill development. The property benefits from an attached.
Electrical and MHE Issues MA11 Slide 1. Allocation of Electrical Categories MA11 Slide 2.
This game is with EmanE Games G3 Games G3 Games EmanE Games G3 EmanE Games G2 Press F5 to play the game.
IEFC 22 March 2011T. Eriksson CERN BE/OP How to ensure a bright future of the AD.
Physics coordinator report: Shifts 2014 Schedule 2015 Access, safety and courses b508 and 275 Magdalena Kowalska.
Infrastructure for CO 2 cooling in the CBM experiment at FAIR Wolfgang Niebur and Johann M. Heuser GSI, Darmstadt, Germany for the CBM collaboration 18-Mar-2013Work.
ALICE space in P2 ALICE TC (W.Riegler, A.Tauro) SPOB meeting –
Big Green Internal dimensions ?. Table for 1 door driver engine box Table for 2Table for 3 Bench for 2 passen ger Bench for 3 Table for 1Table for 4 Space.
THINKING INSIDE THE BOX CHAD HENNING, EFP ASSISTANT DIRECTOR, HOUSING PENN STATE UNIVERSITY.
B508 and 275 Magdalena Kowalska. b275 2 AEGIS laser lab ASACUSA test setup g-BAR? Storage of big parts, test stands? Test setups SSP, detector labs Electronics.
Francois BUTIN CERN EN/MEF.  Future of AD is clearer and deserves investment  New AEGIS experiment being prepared, requires new control room  Existing.
SEB Room Allocation Plan. Civil Engineering Lab Technician Offices Additive Engineering Research Labs Open Plan High Bay Sample Preparation Lab Chemistry.
AD/ELENA (B193) Hall Extension F. Butin. Status The need of a new building for AD was already discussed in 2010, First pre-study shown to GTPE 1st Sept.
ELENA Project GBAR Experimental area L ayout / time scales / questions F. Butin / ELENA collaboration.
ISOLDE Physics Coordinator Report Schedule Access to the hall Visits b275 and b508 Magdalena Kowalska.
Status of the ELENA transfer lines with special consideration of vacuum, hand-over optics and beam time distribution after 2017 W. Bartmann, D. Barna,
AD/ELENA (B193) Integration and constraints F. BUTIN / ELENA collaboration.
Iouri Ivaniouchenkov RAL Specifying the needs for MICE July 8, RAL MICE Collaboration Meeting 1.
Horst Breuker Review Oct ELENA Safety and Radio Protection ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive, Demonstrative (Risk.
Horst Breuker ADUC Jan Safety and Radio Protection, Consequences for the Experiments ELENA TDR : Chapter 6; Safety Files in preparation; Descriptive,
SIZE - Top SERVER ROOM Designed by – openbox |
23 September 2010 Casablanca, Morocco CALICE Collaboration Meeting Hassan University HASSAN II 1 Towards Ecal Assembly Julien Bonis
CPS is excited to welcome onto the market a excellent 4 bedroom detached property located in a ideal residential development. Comprising of 4 Bedrooms,
MICE Project Progress Update Power Converters Rack housing MQ1 to MQ3 magnet power converters –Marshalling for all other quadrupole & dipole units –Houses.
CMS exhibition area with LHC objects in SDX5 (3578 R-A11) 1.Plans & measures 2.Pictures 3.Questions 4.Possible ideas to “steal” from SM18.
ELENA Layout Naming Convention F. Butin / ELENA collaboration.
L5 Assembly Plans in Vienna 5 February 2013 Christian Irmler (HEPHY Vienna) 3 rd PXD/SVD Workshop Wetzlar, Germany.
Plans for the UT Installation LHCb infrastructure workshop February Burkhard Schmidt for the UT group.
ELENA installation progress F. Butin / ELENA collaboration.
ELENA Integration F. Butin / ELENA collaboration.
The Best Health Service Providers Hospitality Health ER (HHER)
UNIVERSAL DESIGN MEGAN LEE
Vacuum System P. Chiggiato TE-VSC
MEDICIS Safety Alarms Systems
ELENA installation and commissioning status
Collaboration meeting 26 to 28 June 2017
H A L L x x X = IN CASE OF FIRE DO NOT ENTER ROOMS x x x x x x x
Current Site Status at IP Preliminary survey of campus
Please keep to Gritted Pathways
Construction Tools Supplier in Canada
Construction Tools, Electrical and Plumbing Suppliers
Name :Reema Balharith ID:
News from Projects Lau Gatignon / EN-EA Input from F.Butin, Q.Bouirek
Columbus State Community College
ELENA Technical Coordination
B. 163 facility upgrade: work space options in B. 163 and B. 103 F
Extension SR1 WP3 Electrical installations
Furniture Arrangement
Barleycove Cottage This stone-built house was extended and fully renovated in The house has lots of character with beamed ceilings, a feature fireplace.
Furniture Arrangement
KUSA NATIONALS FINALS AND AWARDS HALL PLAN – SAX ARENA, Irene
Around the room Orders of operations.
Cell is a School Notes.
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
& Private Equity workshop
Presentation transcript:

EXTENSION ELENA = BUILDING 193 Status of integration   O.Choisnet / ELENA collaboration

INTEGRATION OF BUILDING 393 HALL 193 O. Choisnet / ELENA collaboration

INTEGRATION OF BUILDING 393 O. Choisnet / ELENA collaboration

INTEGRATION OF BUILDING 393 KICKERS CV ACCESS to B.193 ENTRANCE MAIN O. Choisnet / ELENA collaboration

INTEGRATION OF BUILDING 393 KICKERS (12.7x14.7 m2) (5x3 m2) Storage GBAR FLOOR ASACUSA (6x3 m2) Storage (6x3 m2) Storage ALPHA WC (6x3 m2) Storage AEGIS Workshop (5x6 m2) Cleaning Room (5x4 m2) Area (8x4.6 m2) Offloading ATRAP Storage (6x3 m2) Test Bench (7x10 m2) BASE Storage (6x3 m2) O. Choisnet / ELENA collaboration

INTEGRATION OF BUILDING 393 Mezzanine Storage Storage Storage Storage Storage O. Choisnet / ELENA collaboration

INTEGRATION OF BUILDING 393 Emergency Emergency Door O. Choisnet / ELENA collaboration

INTEGRATION OF BUILDING 393 Material Door Staff door Electrical boxes O. Choisnet / ELENA collaboration

INTEGRATION OF BUILDING 393 Height under cables ladder Material Door Height under mezzanine Staff door Electrical boxes O. Choisnet / ELENA collaboration