PLCS - Delivering the Promise

Slides:



Advertisements
Similar presentations
Slide 1 Presentation of the example business concept – DNV Exchange architecture - DNV Summary / issues from last workshop - DNV Presentation of Swedish.
Advertisements

BASSnet Maintenance Name: Oliver Roldan Mesina
Thad Henry Configuration and Data Management. Purpose: To propose a strategy for assessing the development and effectiveness of configuration management.
<<Date>><<SDLC Phase>>
2006, Feb 15-16th, T.Turner, LSC Group Lessons Learnt: LSC Group - Implementing AP-239 Washington, Feb 2006 Tim Turner, LSC Group
Howard Mason BAE Systems
Development plan and quality plan for your Project
Product Life Cycle Support (PLCS) The Information Backbone to transform the Logistics Enterprise PLCSlib status PLCS OASIS TOG Filton, UK Rob.
BAE SYSTEMS Overview of Systems Engineering at BAE SYSTEMS & ALENIA MARCONI SYSTEMS 8/10/2015/MS By Leigh Watton Friday 27th July 2001.
Module 9 Session 9.2 Visual 1 Module 9 Designing Control and Reporting Systems (Time, Cost, Resources and Scope (Performance and Quality)) Session 9.2Managing.
What is Business Analysis Planning & Monitoring?
® VisualPlex Exchange Project Definition Phase June 23, 2000 Prepared James M. Dutcher Oracle Consulting Services.
Rolls-Royce & Ministry of Defence Pilot for Early Implementation of PLCS Marine Olympus/Tyne Summary 3 Feb 04.
Process Modeling CS 4320 Fall Process Difficulties SW not a production line Each project is different—even within the same company No universally.
© 2008, Integrated Support Systems, Inc. All rights reserved. 1 © 2009, Integrated Support Systems, Inc. All rights reserved. An Implementer's View of.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
Project Management-Manufacture
ISO edition 2 Publication plan R. Bodington Eurostep Limited ISO edition 2.
Integrating Asset Registers Richard Bramham Asset Co-ordinator Manningham City Council 2010 National Local Government Asset Management and Public Works.
Project Scope Management Information Technology Project Management, Fifth Edition Note: some slides have been removed from the author’s original presentation.
Implementing Parametric CAD in STEP ???? Kenneth E. Wolsey May 16, 2007
11/24/2015Dr. SASTRY-PROJ SOFTWARE PROJECT MANAGEMENT By Dr. M V S PERI SASTRY. B.E,Ph.D.
Common Terminology Services 2 CTS 2 Submission Team Status Update HL7 Vocabulary Working Group May 17, 2011.
PLCS DEXs Trine Hansen DNV 20 April Content OASIS / PLCS Organization PLCS DEXs DEX architecture Process – define and verify capabilities Way forward.
UK MoD Initiatives TLSS (Through Life Support Standard) PLCS is being used as the basis for both the Information and Activity models. This will require.
1 Margaret Christison Head of Product Data Standards Product Information Standards Defence Logistics 2004.
DEX 7 – Operational Feedback Business Need Introduction This exchange enables the transmission of information on the condition and usage of a supported.
Product Screenshots February Dashboard Summary Service Automation Dashboard.
Recommendations from PLCS TOG Meeting Filton, UK Aug 2011.
ESSRT In-Process Review September 10, Agenda 1.Work Completed Till Date 2.Scope of future activities and deliverables 2.
The Planning Phase Recognize the problem MIS steering committee 7. ManagerSystems analyst Define the problem Set system objectives Identify system constraints.
1 Industry Specifications and their importance in Product Lifecycle Management (Dr Michael Day & Deborah Jane Ham) (September-2012)
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
PLCS Face-to-Face: LSC Group – Lessons from PLCS Activities Huntsville, Oct 2006 Tim Turner, LSC Group.
ITIL Project Change Management Workshop 7 February 2007
BIM Terminology Explained BIM Masterclass & Technical Workshop 2015.
Breakdown Work Structure Applying Management Tools to a Project.
Information Security Policy
Internal and external control in an automated environment
SDP Software Presented by Bill Clover and Brad Diggans Bill Clover
support task records, including product data collected by the task;
Status DEX Publication Project
Data Exchange Architecture
22-INTEGRATION HUB
Integrating Asset Registers
Project Roles and Responsibilities
DoD PLCS Meeting Arlington, USA 15 February 2006
OASIS PLCS TC, Alabama, 31Oct – 1Nov 2006
Operational Feedback DEX Status Jan 04
Configuration Control and the Standard Nuclear Performance Model
Order-to-Cash (Project-Based Services) Scenario Overview
Lockheed Martin Canada’s SMB Mentoring Program
Integrating Asset Registers
Analytical Method Validation PAI Readiness / Certification
Data Discovery Change Committee.
Proof of concept 29 September 2010
Software Engineering I
Order-to-Cash (Project-Based Services) Scenario Overview
Proposed K-20 Budget FY 08/09.
DSC Change Committee Summary – 11th July
DSC Change Committee Summary – 10th October
June 2019 Release Scope DSC Change Management Committee
BI-19 Process Improvement
2016 Maintenance Innovation Challenge
Work Breakdown Structure Tasks and Sub-Tasks
FlexFile 101 MARCH 2019.
Implementation Approach Distribution Workgroup – June 2014
Introduction of PTM (Planning Tracking & Management) Tool - developed by Meridian Technology 29/05/2019.
WG2 ADAS report – May Marseille
DSC Change Committee Update
Presentation transcript:

PLCS - Delivering the Promise OASIS DEX Co-ordination Sub-Committee 4 – 5 February 2004

An MoD Asset

Through Life Information Sub Contractor Supplier RN ARMY RAF MOD Prime Through Life Product Data

The Standard for the Exchange of Product Data IS 10303 The Standard for the Exchange of Product Data

The ILS Process

DEX 1 / 8 Configuration Statement Development Team led by Rolls Royce Scope is to enable the transfer of a statement of the product physical breakdown structure as designed, as built or as planned WSA has conducted an assessment of DEX 1 against an existing automated exchange between the Submarine Design Definition System (SDD) and Devonport Dockyard’s Vessel Materiel Planning System (VMP)

DEX 1 / 8 Configuration Statement Assessment Result : 100% of the requirement was contained within the AP 239 Data Model 95% of the requirement was contained within the scope of DEX 1 as then drafted Way ahead : Investigate applicability of DEX 8 to exchange Product_as_Individual information Build a DEX 8 import/export interface into SDD

DEX 4 Work Request Development Team led by LSC Group Scope is to enable the transfer of a Work Package containing the details of the required tasks for a given Support Period The Work Package file, as generated by the new WSA Maintenance Management System (UMMS) for export to the Dockyards has provided a target data set to define the exchange scope.

DEX 4 Work Request Work has included : Mapping the UMMS data set to the AP239 data model Developing an XML based architecture for the exchange Building an XSLT automated data transformation capability Capability built into UMMS for its roll-out in September 2003

UMMS Architecture

WSA STEP Adoption Proposed Road Map

Implementation Architecture

UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Platform Name OpDef category OpDef description Asset ID Datahub SS-CWE SSDD CRISP

UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Platform Name Compartment ID Datahub SS-CWE SSDD Equipment ID’s A&A No. [for each equipment]affected by CRISP

UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Datahub SS-CWE SSDD Equipment ID’s Quantity Date for delivery Stock availability CRISP

UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS A&A Details:- Drawings, Description Datahub SS-CWE SSDD A&A No’s affecting compartment CRISP

UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Task Specification Estimate cost Cost Datahub SS-CWE SSDD CRISP

UMMS PEPS Datahub SS-CWE SSDD CRISP DATA WRITE: Task Specification Generate task requirement Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS DATA WRITE: Task Specification DATA WRITE: Job complete Do work Task Specification Datahub SS-CWE SSDD CRISP

Feedback Loop UMMS PEPS Datahub SS-CWE SSDD CRISP Generate task requirement Request affected Equip ID’s from SSDD Request availability of replacement equipment Request details of A&A Pass to dockyard for cost estimate Approve task for completion Feedback UMMS PEPS Job ID Actual parts used Changes to task spec Datahub SS-CWE A&A No implemented SSDD A&A No implemented CRISP Associated changes to scale

Information Systems Integration Hub

Information Systems Integration Hub