CONDOMINIUM TOWER & PARKING

Slides:



Advertisements
Similar presentations
Introduction to composite construction of buildings
Advertisements

Introduction to Lateral Force Resisting Systems
Lecture 9 - Flexure June 20, 2003 CVEN 444.
Structural System Overview
Fraser Centre State College, PA Tyler Strange Structural Option Consultant: Dr. Thomas Boothby April 13, 2011 Tyler StrangeStructural Option Fraser Centre.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Modeling for Analysis CE Design of Multi-Story Structures
Carl Hubben – Structural Option Ae senior thesis Office Building-G EASTERN UNITED STATES.
Utilizing Steel Plate Shear Walls for Seismic Hazard Mitigation
Jeremiah Ergas AE 482 – 5 th Year Senior Thesis Structural Option April 15 th, 2008 Faculty Consultant: Dr. Ali Memari Northside Piers – Brooklyn, NY Structural.
Milton S. Hershey Medical Center Biomedical Research Building Joshua Zolko, Structural Option.
Penn State Hershey Medical Center Children’s Hospital Hershey, Pennsylvania Matthew Vandersall Structural Option AE Senior Thesis Dr. Richard Behr.
The University Sciences Building Northeast, USA Final Presentation Chris Dunlay Structural Option Dr. Boothby.
SEISMIC ANALYSIS WITH SHEAR WALLS
University Health Building Thesis Final Presentation
High Rise Structural Systems
Villanova University Dept. of Civil & Environmental Engineering CEE 8414 – Structural Dynamics Northridge Earthquake 1 Northridge Earthquake - Concrete.
Courtesy of Holbert Apple Associates Georgia Avenue Building Introduction Statistics Gravity System Lateral System Problem Statement & Solution.
Samuel M. P. Jannotti Structural April 14, 2008 American Eagle Outfitters Quantum III: South Side Works.
360 State Street New Haven  CT  Structural | Sabrina Duk | T. Boothby.
City Vista | Building L Street Washington D.C 460 L Street Washington D.C. Julie Davis | Structural Option Penn State University Sr. Thesis Presentation.
Rockville Metro Plaza II Rockville Pike John Vais | Structural Option PSU AE Senior Thesis 2014 Faculty Advisor – Dr. Hanagan Rockville, Maryland
Senior Thesis Structural Option Ryan Friis Spring Morgan St. Chicago, IL 111 Morgan St. Chicago, IL Ryan Friis Structural Option.
TOPICS COVERED Building Configuration Response of Concrete Buildings
GARY NEWMAN STRUCTURES OPTION ADVISOR: DR. HANAGAN SENIOR THESIS PRESENTATION SPRING 2008.
AMERICAN EAGLE OUTFITTERS Quantum II Corporate Headquarters Michael Sandretto Spring – 2007 Structural Option.
Southeast View of IRMC West View of IRMC. Presentation Outline Introduction Existing Structure Thesis Goals Structural Depth Lighting Breadth Conclusion.
Structural System Redesign Existing Conditions Proposal Gravity Design Lateral Design Cost Comparison Schedule Impact Conclusions.
Duquesne University Forbes Expansion
Structural Option Senior Thesis Presentation Spring 2007 Advisor: Dr. Lepage Eric R. Mueller th Street – Oakland, CA.
Lancaster, PA Courtyard by Marriott Danielle Shetler - Structural Option Senior Thesis - Spring 2005.
300 North La Salle Liam McNamara BAE / MAE Senior Thesis April 13 th, 2010.
Seth M. Moyer Office Buildin g Sayre, PA Structural OptionAdvisor: Dr. Thomas E. Boothby.
The Towers at the City College of New York Robin Scaramastro - Structural Option - Advisor: Dr. Memari Senior Thesis Final Presentation – Spring 2007.
Lexington II at Market Square North, Washington D.C. Alexis Pacella – Structural Option.
Dan Donecker BAE/MAE – Structural Option Senior Thesis Project 35 West 21 st Street New York, New York.
Ryan Pletz Structural Dr. Hanagan The Pennsylvania State University Department of Architectural Engineering Senior Thesis April 14, 2008.
Signal Hill Professional Center: Implementing a Concrete Structural System Joseph Henry,Structural Option Dr. Linda Hanagan, Advisor Penn State Architectural.
Senior Thesis 2006 The Pennsylvania State University
Jonathan Goodroad Structural Option 2005 Thesis Penn State AE Delaware State University Administration and Student Services Building.
N EW Y ORK, N EW Y ORK 100 Eleventh Avenue © Tyler E. Graybill | Structural Option AE Senior Thesis Presentation | April 12, 2010 Faculty.
Brad Oliver – Structural Option Advisor – Professor Memari.
Fordham Place Bronx, NY Aric Heffelfinger Structural Option Spring 2006.
151 First Side William J. Buchko introduction overview proposal structural depth acoustics breadth cm breadth conclusions 151 First Side Pittsburgh, PA.
Park Potomac Office Building “E” Kyle Wagner l Structural Option AE Senior Thesis l Spring 2010 Faculty Consultant l Prof. Kevin Parfitt.
Structural Curriculum for Construction Management and Architecture Students 1 Prepared by: Ajay Shanker, Ph.D., P.E. Associate Professor Rinker School.
Discovery Communications Headquarters Silver Springs, MD Josh Woolcock Structural Option Architectural Engineering Pennsylvania State University.
 Building Background  Building Structural System  Problem Statement  Proposed Solution  Structural Investigations  Architectural Impact  Sustainability.
SteelStacks Performing Arts Center Sarah Bednarcik | Structural BAE/MAE Faculty Advisors: Dr. Linda Hanagan & Dr. Ali Memari Spring Thesis 2013Bethlehem,
Michael A. Troxell Structural Option Senior Thesis 2006 The College of Business Administration Northern Arizona University Flagstaff, Arizona.
Biobehavioral Health Building The Pennsylvania State University Daniel Bodde Structural Option Advisor – Heather Sustersic.
THE NORTHBROOK CORPORATE CENTER Redesign of the Lateral Load Resisting System.
Lecture 2 Structural System Overview CVEN Structural Concrete Design January 15, 2003.
Hunter Woron Spring 2012 Structural Professor Parfitt.
Structural Systems Design for a Laramie Office Building
R. Bryan Peiffer– Structural Option AE Senior Thesis 2011 Three PNC Plaza, Pittsburgh Pa.
Integrated Design : Building Scale | Prof. Craig Schwitter, Prof
Introduction to composite construction of buildings
An-Najah National University Faculty of Engineering
Structural Design of Technology College in Hebron University
Advisor: Professor M. Kevin Parfitt
Introduction James W. & Frances G. McGlothlin Medical Education Center
Acterna Headquarters John M Sekel, EIT Germantown, Maryland
Outline Introduction Structural Redesign Gravity System
Rutgers University Law School Building Addition and Renovation Nathan E. Reynolds Advisor: M. Kevin Parfitt Structural Option The Pennsylvania State.
North Shore at Canton The Pennsylvania State University
Mitre III Building McLean VA Debra Schroeder Structural Option.
Masonry Bearing Walls.
Faculty of Engineering Civil Engineering Department
RiverView Condominiums II Chicago, IL
Presentation transcript:

CONDOMINIUM TOWER & PARKING ARCHITECTURAL ENGINEERING THE PENNSYLVANIA STATE UNIVERISITY THESIS PROJECT PASEO CARIBE CONDOMINIUM TOWER & PARKING Coupled Shear Wall Systems in High Seismic Zones PASEO CARIBE CONDOMINIUM TOWER & PARKING

BACKGROUND LOCATION San Juan, Puerto Rico INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION LOCATION San Juan, Puerto Rico Bordered by the Caribbean & South American Plates UBC 1997 Seismic Zone 3 N. American Plate S. American Plate Caribbean Plate

BACKGROUND Project Overview Project Overview Parking Garage: Phase II INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Project Overview Parking Garage: Phase II 10 stories, 1700 parking spaces Condominium Tower: Phase III Add. 14 stories 4 – 3,500 ft2 aparts / floor Project Overview IV Phase Development Project

EXISTING STRUCTURE Gravity System Lateral System INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Gravity System Cast-in-Place Bearing Wall 9” Post-Tensioned Flat Slab 36 – 12” Walls: 620 LF / Floor Typical Open Span: 17’ E-W Lateral System Bearing Walls act as Shear Walls Very Stiff 10’ x 160’ Core 4 Elevator Shafts 3 Sets of Stairs

PROBLEM STATEMENT Lateral Discontinuity INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Lateral Discontinuity Transition of Occupancy at 8th Floor Vertical Irregularity: UBC Table 16L Type 1: Soft Story – Transfer Girders Type 2: Weight Mass – Doubled Slab Area Type 3: Vertical Geometry > 1.3L Type 4: In plane Discontinuity

VERY LARGE SEISMIC FORCES PROBLEM STATEMENT INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Multiple Lateral Discontinuities Large Self Weight = 92,000k Low R Bearing Wall Value = 4.5 VERY LARGE SEISMIC FORCES V = 8400 KIPS

PROBLEM STATEMENT Non-Structural Issues INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Non-Structural Issues In plan, no open space > 22’ E-W Material and Labor Intensive Design Concrete: 11200 cy Formwork: 520,000 ft2 Rebar: 560 tons

DESIGN GOALS Efficient Lateral System: INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Efficient Lateral System: Reduce No. Lateral Elements to 4 in each direction Limit No. Irregularities Has a Predictable and Clean Failure Mechanism Does not interfere with the Architecture & Assigned Use of Space

KEY ELELEMENTS Reduce Vase Shear: Improved Capacity: INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Reduce Vase Shear: Use a frame gravity system with a higher R: 5.5 Reduce the Weight with a lighter Steel Frame Improved Capacity: Higher f’c = 5ksi Thicker 24” walls Diagonally Reinforced Coupled Walls Higher T to increase participation of coupled beam Limit discontinuity and use symmetry to keep a low ρ factor

FRAME SYSTEM Method Requirements INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Method Take advantage of the Existing 27’x30’ Parking Grid Requirements Existing Height w/ 9” P/T Slab: 230 ft UBC Overall Height Restriction: 240 ft Clear Story Height Required: 9 ft Max Story Height Increase: 8 in

FRAME SYSTEM Results – Apartments Spacing: 7.5’ Max Span: 27’ INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Results – Apartments Spacing: 7.5’ Max Span: 27’ Apartments: W10 x 26 Corridor: W14 x 30 ∆Hstory = 5” ∆Htotal = 70”

FRAME SYSTEM Results – Parking Garage CIRCULATION INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Results – Parking Garage CIRCULATION

FRAME SYSTEM Results – Transition Level, 8th A6 INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Results – Transition Level, 8th 15’ A6 W40x183 Girder

FRAME SYSTEM Results – Connection Check Rn, kips Φ ΦRn, k Ru, kips INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Results – Connection Check Rn, kips Φ ΦRn, k Ru, kips Lateral Flange Bending 465 0.9 419 415 Local Web Yielding 519 1 Local Web Crippling 724 0.75 543 Web Buckling 642 0.85 545

COUPLED WALLS Proposed Layout Method Load Combinations INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Proposed Layout Method Direct Shear – ETABS Axial Dead & Live – RAM Steel System W = 62,000 kips 25% Reduction Torsion Eccentric Loading Accidental Torsion, Ax = 2 Load Combinations ρ = 1.1 Ca = 0.33 0.8D + 1.2E (Load Case 1) 1.48D + 1.2E + 0.55L (Load Case 2)

COUPLED WALLS ETABS MODEL INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION ETABS MODEL

COUPLED WALLS Summary Results INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Summary Results

COUPLED WALLS Coupled Beams CR Ratio = 27% Results Details INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Coupled Beams CR Ratio = 27% Results Details Vertical: #4@6” Horizontal: #6@9” Diagonal Ties: #4@4”

COUPLED WALLS Flexure ФMn 1st Level L = 33 ft B.Z: 39 #11 Web: #10@9” INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Flexure ФMn 1st Level L = 33 ft B.Z: 39 #11 Web: #10@9” ФMn = 146337 ft-k > 144233 ft-k

COUPLED WALLS Flexure, ФMn Cut-Off Requirements – 0.8*L INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Flexure, ФMn Cut-Off Requirements – 0.8*L Vertical Reinforcement ∆ = 12.8 ft ∆ = 12.8ft

Preferred Plastic Hinge Minimize Impact on Non-Structural Systems COUPLED WALLS INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Ductility & Plastic Hinge Development Virtual Work ∆ Preferred Plastic Hinge at Base: Minimize Impact on Non-Structural Systems Θ1 < θ9 θ9 θ1

COUPLED WALLS Minimum Shear and Magnified Shear Demand INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Minimum Shear and Magnified Shear Demand

COUPLED WALLS Boundary Zones Requirements Length Ties: #5@6” INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Boundary Zones Requirements Length Ties: #5@6”

COUPLED WALLS Final Design INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Final Design

COMMODITIES Architecture Saved 160 ft2 / Floor INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Architecture Saved 160 ft2 / Floor Flexible and Open Plan for: Architect Owner Future Tenants Larger Open Areas of up to 50’

COMMODITIES Acoustics Vibrations Living Areas: W10X15 TO W10X26 INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Acoustics Vibrations Living Areas: W10X15 TO W10X26

CONSTRUCTION U.S Cost Puerto Rico $1,000,000 Savings INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION U.S Cost $1,000,000 Savings Formwork  450,000 sfca Rebar Placement  100 tons Puerto Rico $400,000 Deficit Concrete Labor Market  12% Finishes & Partitions  323%

CONCLUSION INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION Current design reflects the labor practices and situation of the country Designers applied the best and most economical design to a complicated structure Coupled wall systems proved to be an effective resisting system, allowed for increased floor area and architectural freedom Reduced the amount of material and labor required for the project Overall: Good design when the resources are available

THANK YOU INTRODUCTION BACKGROUND EXISTING STRUCTURE PROBLEM STATEMENT DESIGN GOALS KEY ELEMENTS FRAME SYSTEM COUPLED WALLS COMMODITIES CONSTRUCTION &COST CONCLUSION