INTERNATIONAL PUBLIC TENDER:

Slides:



Advertisements
Similar presentations
Summary of Second Draft of the NERC Standard PRC Disturbance Monitoring and Reporting JSIS Meeting August 10, 2010 Salt Lake City, UT.
Advertisements

Monitoring and tender procedures for infrastructure projects Baltic Retreat 2013 Federal Department of Foreign Affairs FDFA Swiss Agency for Development.
Atlas Copco Group Q4 Results February 2, Q4 - highlights  Order growth continued  Record operating profit –All business areas above 20% operating.
Lima - Perú. Huanuco Pucallpa Tingo María 3 Huancayo 2 Dv Cerro de Pasco La Oroya Pte Ricardo Palma Ramiro Prialé 1  Section 1:Ramiro Prialé - Bridge.
The Cemex Request-for-Proposal: An Auto-Generation Energy Project Emerging Markets February 24, 2003 Salsa by Sunday Andrea Fernandez Jason Haight Michael.
POWER GRIDS AND CDM METHODOLOGIES Workshop for CDM stakeholders The World Bank Buenos Aires December 8, 2004.
Business Portfolio Adding Value to Investors Luiz Fernando Rolla CFO October, 2008.
Prospero LLC December 2, 2004 Connecticut’s Energy Future Financing Sustainable Energy.
Marc Frishman – Partner
Nicola Ware Head of UK Trade & Investment British Embassy
Jeff Delmon FEU Financial Solutions World Bank. Why PPP? Procurement efficiency Lifecycle management Design/construction/operation management Monetizing.
The Australian Energy Regulator. Today’s agenda Presentations from : ◦AER — Chris Pattas, General Manager - Networks ◦Consumer Challenge Panel — Hugh.
Electricity Network Connectivity Between the GCC Countries Presented By: Adnan I. Al-Mohaisen May 17, 2005.
Charles Hosken, General Manager Imperial Irrigation District
JSC “Moscow United Electric Grid Company” (JSC “MOESK”) Operating activity’s results for the first half year of 2010.
WEST DELTA WATER CONSERVATION AND IRRIGATION REHABILITATION (WDWCIR) PROJECT ByA.M.Farahat.
World Bank Water Week – 2004 Jerson Kelman. Hydroelectric power accounts for more than 90% of the total electric energy produced in Brazil.
An Introduction to Public Private Partnerships: Why Government needs to work with the private sector Vilnius 22 nd November 2006 Stephen Harris - Head,
Lithuanian interconnection projects Donatas Matelionis LITGRID AB
United Nations Procurement Division
WVDOH Experience... thus far.  Public-Private Partnerships = PPP=3P = P3 ... Most folks in industry refer to them as P3, so that’s what I go with.
Project Information Brief project description Cairo, Egypt Bus Rapid Transit System with potential capacity of 45,000 people per person per direction Phase.
III Astana Economic Forum. Ensuring Sustainable Economic Growth of Countries in Post-Crisis Period July 1-2, 2010 JSC «Kazakhstan public-private partnership.
Perú: Recent Economic Developments and Perspectives Central Reserve Bank of Peru October 2002.
Review of the Economic System Planning Criteria June 15 th, 2012 / RPG.
2008 Electricity Distribution Maintenance Summit Stream 3A: Funding, Investment and Financial issues 10 June 2008 Theo van Vuuren Divisional Executive.
1 APPLICATION ON THE SPANISH CONCESSIONAL MODEL TO CENTRAL AND ESTERN EUROPE WORLD BANK WORKSHOP ON PPP IN HIGHWAYS: INSTITUTIONAL, LEGAL, FINANCIAL AND.
MAKING IT HAPPEN. TRB 88 th Annual Meeting Risk Management in Public-Private Partnerships January 14, 2009 Statutory and Public Policy Approaches to PPP.
Introduction to DBFM & the bank’s point of view 9 December 2014.
1 AZERBAIJAN: ECONOMIC IMPACT AND RESPONSE TO THE GLOBAL ECONOMIC CRISIS.
Privatization of Siderurgica del Orinoco John Blake Ken McNish Sean O’Brien Phil Thorogood Lew Zaretzki.
PERUVIAN ELECTRICITY SECTOR Prepared to: The Federation of Israeli Chambers of Commers
MINEM – April Undersecretariat of Renewable Energy Ministry of Energy and Mines - MINEM Republic of Argentina RENEWABLE ENERGY IN ARGENTINA New Regulatory.
Public Tender for Comprehensive Project to award GTS Project in concession “AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE (circuit two)” GTS: Guaranteed.
Investment opportunities in public infrastructure
Power Transmission Rehabilitation Project TERMS AND CONDITIONS OF INVESTMENT FUNDS “High Voltage Electric Networks” CJSC (HVEN CJSC) is implementing.
First Quarter 2013 Earnings Conference Call April 18, 2013.
Oppenheimer Industrial Growth Conference May 14, 2014.
NEW ENERGY REGULATION IN THE TRANSMISSION SECTOR & GEOTHERMAL BUSINESS Carlos Jorquera
AFRICAN DEVELOPMENT BANK KENYA- SPAIN Multilateral Partnership Meeting Nairobi, 9 December 2013.
1Q13 Earnings Conference Call Investor Relations São Paulo, May 13, 2013.
© OECD A joint initiative of the OECD and the European Union, principally financed by the EU Ensuring Good Quality PPP Projects Martin Darcy Regional Workshop.
Evolution of Modular Substations Market - Feasibility, Performance, Area of Operations, Availability 2025.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Global Offshore Wind Market to reach 60 GW by 2024: Global Market Insights.
“AGUAYTÍA – PUCALLPA 138 kV ELECTRIC TRANSMISSION LINE
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Middle East Distribution Transformer Market Price, Packaging Trends, Industry.
RAIL BALTICA RIGA STATION – ASPIRATION FOR THE FUTURE
Using Public-Private Partnerships to Move More People The Story of HOT Lanes in Northern Virginia January 30, 2017 Morteza Farajian, Ph.D.
Third Quarter 2012 Earnings Conference Call October 18, 2012
(State Initiatives and Unsolicited proposals projects)
Contractor Review and Prequalification
“Electricity Supply Reliability Project - Additional Financing”
“Caucasus Power Transmission Network’’ (Armenia-Georgia overhead transmission line/substations) Loan Project.
Loan Project of Construction of Iran-Armenia 400kV third power transmission line (“ Noravan’’ 400/220/20 kV) and related substation.
Energy day July 3th, 2012.
Solar Power Plants in the Negev Desert Global Infrastructure Leadership Forum New York City December 2007 Dan Weinstock Electricity Authority, Director.
South Carolina Electric & Gas Company - Strategic SWOT Analysis Review
Investment in Skills and Labour Force for Human Development 2017 Round Table Implementation Meeting Pre-Consultation National Human Resource Development.
Financing Public WSS Infrastructure: Reflections on competing investment drivers and other factors to be considered 3 Challenges & 3 Recommendations from.
© 2016 Global Market Insights, Inc. USA. All Rights Reserved Digital Substation Market 2024: Opportunity and Demand Analysis, 2017-
Measurement of Economic Performance
Converter Transformer Market by Configuration, Voltage level, Application and Region - Global Forecast to 2020.
BEIRUT - RAFIC HARIRI INTERNATIONAL AIRPORT EXPANSION
Toolkit for Public-Private Partnership in Highways
The Oregon Approach to Innovation in Infrastructure
City of Lebanon, Missouri Electric Department
Developing the power sector in Federal Nepal Main lessons from international experience Kathmandu, November 06, 2018.
How Small Developers and EPC Contractors Can Add PPA Financing to their Arsenals John Langhus, VP Business Development Midwest Solar Expo 2019 New Energy.
Presentation transcript:

INTERNATIONAL PUBLIC TENDER: CONCESSION OF 500 kV MANTARO-MONTALVO TRANSMISSION LINE

PROJECT PROFILE Sector: power transmission. Concession to design, finance, build, operate and maintain a transmission line (500 kV, 900 km) and associated substatios between the Central and Southern Peru. Concession term: 30 years + construction period. Grantor: State of Peru, represented by the Ministry of Energy and Mines. Implementing entity: Proinversion. Tender date : II Q 2013. Estimated CAPEX: US$ 350 – 400 million (excluding without Value Added Tax). 500 KV Transmission Line Mantaro-Marcona-Socabaya-Montalvo and Associated Substations

DESCRIPTION Route Main project components: Construction of tranmission line between Mantaro-Marcona-Socabaya-Montalvo (500 kV and estimated total distance of 900 km). Construction of two new substations: Mantaro Nueva 500/220 kV and Socabaya Nueva 500/200 kV. Expansion of three existing substations Campo Armiño 220 kV, Marcona 500 kV and Montalvo 500 kV Montalvo. Connections from 500 kV to 220 kV substations, and ancillary works. The project is the second 500 kV transmission line between Central and Southern Peru, in orden to strengthen the National Interconnected Power System (“SEIN”). Route

FINANCIAL DESCRIPTION Low -risk activity. Proinversion has awarded several transmission lines in recent years following a similar contractual structure. Contracts are well-known in the banking system and financial markets. The concession holder is responsible for financing. Transmission is a regulated activity and concession holder remuneration is determined in the bidding process. CAPEX offered is converted into an annuity (30 years, 12% return), plus Operating and maintenance cost offered. Very low revenue collection risk.

New Demand from Major Mining Projects Southern Peru DEMAND DRIVERS Strong and sustained growth: Peru GDP is expected to grow above 6% in the next 3-5 years. The Central region of Perú will concentrate the highest power generation growth. The Southern region of Peru will have the highest demand growth (associated with large mining projects and expansions in construction, see table below). The Mantaro-Montalvo line project will enable power transmission between Central and Southern Peru. The line will connect Marcona (nearby Shougang Hierro Peru iron mine in expansion), Socabaya (nearby Cerro Verde copper mine in expansion) and Montalvo (nearby Quellaveco copper project and Toquepala copper mine in expansion). New Demand from Major Mining Projects Southern Peru

Qualification of Bidders TENDER PROCESS: TIMETABLE Current timetable: Call for tenders First contract draft Second contract draft Qualification of Bidders Final contract Tender Date and Award Closing 2012 I QT 2013 II QT 2013 III QT 2013 6

TENDER PROCESS: BIDDER QUALIFICATION Financial and operational qualification criteria: Requirements Financial: Minimum equity ; and US$ 70 million. Financial: Minimum total asset; and US$ 210 million. Operational: direct operation of electric transmission systems that meet the following conditions: Length: More than one thousand kilometers (1 000 Km) in voltages higher or equal to 220 kV. Transformation capacity: More than 500 MVA in substations in voltages higher or equal to 220 kV. 7

TENDER PROCESS: OFFERS AND AWARD Competition factor: lower total cost of service. The total cost of service cost comprises Annuity of the CAPEX offered (in 30 year period with 12% return). Annual cost of operation and maintenance offered. Format for submission of offers: Number Amount CAPEX cost, US$ (*) Annual cost of O&M, US$ Note: (*) Global amount. It will be converted into an annuity and added to O&M cost to determine total service cost. 8

CONTACT INFORMATION Public information on Proinversion’s web page: www.proinversion.gob.pe Proinversion - Energy Projects Av. Enrique Canaval Moreyra N° 150, Piso 8 Lima 27, Peru   Ing. Anibal del Aguila Head of Energy Projects T: (+511) 2001200, extension 1340 F: (+511) 6121210 E: masificacion-gn@proinversion.gob.pe E: whuambachano@proinversion.gob.pe  Financial Advisor – Macroinvest S.A. General Borgoño 1156 Lima 18, Peru Sr. Roger Espinosa Sr. Mateo Moreyra Partner Partner T: (+511) 2039800 T: (+511) 2039888 F: (+511) 2212696 F: (+511) 2212696 E: rofranes@macroconsult.pe E: mmoreyra@macroconsult.pe 9

APPENDIX: TECHNICAL SUMMARY 10