SCOPE MANAGEMENT Information Technology Project Management

Slides:



Advertisements
Similar presentations
Mission Oriented, Customer Focused
Advertisements

Project Management Concepts
ELC 347 project management Day Agenda Questions Assignment 3 graded –3 A’s, 5 B’s, 2 C’s, 1 D, 2 F’s and 2 answered the wrong questions Assignment.
Day 8 ELC 347/BUS 348/PSA 347.
Chapter 2 The Analyst As Project Manager In Managing Information Systems 2.3.
Project Management.
Degree and Graduation Seminar Scope Management
Project Cost Management Estimation Budget Cost Control
ELC 347 project management Week 5. Agenda Assignment 2 re-graded –Missing case 2.3 found and graded Assignment 3 Graded –Could have used more effort –case.
1 Pertemuan 4 Auditing Standards and Responsibilities Matakuliah:A0274/Pengelolaan Fungsi Audit Sistem Informasi Tahun: 2005 Versi: 1/1.
CS Integration Management (Part 6) Bilgisayar Mühendisliği Bölümü – Bilkent Üniversitesi – Fall 2009 Dr.Çağatay ÜNDEĞER Instructor Bilkent University,
Project Management Session 7
4 4 By: A. Shukr, M. Alnouri. Many new project managers have trouble looking at the “big picture” and want to focus on too many details. Project managers.
Scope Management Chapter 5.
Copyright 2002 Prentice-Hall, Inc. Managing the Information Systems Project 3.1 Chapter 3.
S/W Project Management
PPMT CE-408T Engr. Faisal ur Rehman CED N-W.F.P UET P.
Scope Management Chapter 5 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall5-1.
5-1Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Scope Management Chapter 5.
Scope Management Chapter 5.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
Scope Management. 5-2Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Project Scope Project scope is everything about a project –
Scope Management Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall Chapter 5 Learning Objectives After completing this chapter,
Copyright © 2013 Pearson Education, Inc. Publishing as Prentice Hall o P.I.I.M.T o American University of Leadership Ahmed Hanane, MBA, Eng, CMA, Partner.
Develop Project Charter
In the name of Allah the Most Gracious the Most Merciful.
Evaluate Phase Pertemuan Matakuliah: A0774/Information Technology Capital Budgeting Tahun: 2009.
Report Performance Monitor & Control Risk Administer Procurement MONITORING & CONTROLLING PROCESS.
Team-Based Development ISYS321 Managing the Information Systems Project.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Project Management 6e..
Project integration Management
Title of presentation Name(s) of author / presenter / co-authors
Project Cost Management
Project Management 6e..
ANSI/EIA-748-B Earned Value Management Systems (EVMS)
Project Management Systems
Chapter 7: Project Cost Management
Managing the Information Systems Project
Chapter 3 Managing the Information Systems Project
Organisational Structures
Project Management BBA & MBA
Procurement Management
Project life span.
Chapter 4 Defining the Project.
Project Management -- Defining the Project
Magister Sistem Informasi Universitas Komputer Indonesia
SCOPE MANAGEMENT Information Technology Project Management
Project Integration Management
TechStambha PMP Certification Training
ESTIMATING PROJECT TIME, COST & BUDGETING
Project Management.
Chapter 3 Managing the Information Systems Project
Defining the Activities
Chapter 3 Managing the Information Systems Project
Where We Are Now. Where We Are Now Defining the Project (100) Step 1: Defining the Project Scope Step 2: Establishing Project Priorities Step 3: Creating.
Scope management Chapter 5 Copyright ©2016 Pearson Education, Inc.
Project Theory and Application
Created by Katy Koenen © Microsoft Corporation
Chapter 3 Managing the Information Systems Project
Scope Management Chapter 5
MGT 605: CH 04 Defining the Project.
CIS12-3 IT Project Management
Project Management Process Groups
P ROJECT M ANAGEMENT Skills.
DOD’S PHASED SYSTEM DEVELOPMENT PROCESS
Scope Management Chapter 5
Managing Project Work, Scope, Schedules, and Cost
Chapter 2 Managing the Information Systems Project
Definition of Project “An organized endeavor aimed at accomplishing a specific non-routine or low-volume task.” Definition of Project Management “The.
Presentation transcript:

SCOPE MANAGEMENT Information Technology Project Management WEEK 6 SCOPE MANAGEMENT Information Technology Project Management Magister Sistem Informasi Universitas Komputer Indonesia Source: Pinto, j.k. 2010, 2ND. ED.

IT PROJECT FAILURE An article by Smith, Keil, and Depledge highlight one of the mysteries of IT project failure; that is, the fact that “runaway” IT projects are often made even worse by unwillingness of project team members to convey negative information or bad news regarding the project’s status. They cite the unhappy history of the CONFIRM computerized reservation developed as a joint venture between Marriott, Hilton, and Budget Rent A Car in 1987. After almost four years and the cost over $125 million, the project was finally canceled due, in no small part, to the fact that the project team charged with its development had “deliberately concealed a number of important technical and performance problem.” In May of 1992, two months before the project was canceled, one of the key members of consortium’s top management team charged these willful deceptions regarding the true nature of project’s status had “created more difficult problems-of both business ethics and finance-than would have existed if those people had come forward with accurate information.

Project scope is everything about a project – work content as well as expected outcomes. Project scope consist of naming all activities to be performed, the resources consumed, and the end product that result, including quality standard. Scope includes a project goals, constraints, limitations.

SCOPE MANAGEMENT is the function of controlling a project in terms of its goals and objectives through the processes of conceptual development, full definition, execution, and termination. It’s a dream until you write it down. Then it’s goal

ELEMENT IN PROJECT SCOPE MANAGEMENT Conceptual development Scope statement Work authorization Scope reporting Control systems Project closeout

CONCEPTUAL DEVELOPMENT is the process that addresses project objectives by finding the best ways to meet theory. To create an accurate sense of conceptual development for a project, the project management team must collect data and develop several pieces of information. Key steps in information development are: 1.Problem or need statements 2. Information gathering 3. Constraints 4. Alternative analysis 5. Project objectives 6. Statement of work

Statement of work is a detailed narrative description of the work required for a project. A statement of work is an important component of conceptual development as it identifies a need within the firm or an opportunity from an outside source, for example, the commercial market.

Comprehensive Sow elements

Comprehensive Sow elements (continued)

SCOPE STATEMENT The heart of scope management, reflects a project teams lest efforts at creating the documentation and approach of all important project parameters prior to proceeding to the development phrase.

Key steps in scope management process Establishing the project goal criteria: cost, schedule, performance, delivered les, and key receives and approach ‘gates’ with important project stakeholders (client). Developing the management plan for the project: organization structure, policies and procedures, job description, reporting structure. Establishing a Work Breakdown Structure: devides the project into its component sub steps in order to begin establishing critical interrelationship among activities.

WORK BREAKDOWN STRUCTURE is a deliverable-oriented grouping of project elements which organizes and defines the total scope of the project. WBS is a process that sets a project scope by breakdown its overall mission into a cohesive set of syndrome, increasingly specific tasks.

Goal setting with & without wbs

It installation flowchart

Example of wbs for a project

THE ORGANIZATION BREAKDOWN STRUCTURE OBS allows companies to define the work to be accomplished and assign it to the owners of the work packages. The budget for these activities are then directly assigned to the departmental accounts responsible for the project work.

The intersection of the wbs and obs

RESPONSIBILITY ASIGNMENT MATRIX To identify personnel who will be directly responsible for each tasks in the project’s development. The RAM is sometimes referred to as linear responsibility chart, although it is considered a separate document, the RAM is often developed in conjunction with creating the WBS for a project.

Example of Cost & personal assignments matrix

WORK AUTHORIZATION is the step that reflects the formal “go a head” given to the project to commence once the scope definition, planning documents, management plans, and offer contractual documents have been prepare and approved. Contractual documentation posses some keep identifiable features: - Contractual requirements: Specific functionality or performance criteria. - Valid consideration: What items are voluntarily promised in exchange for a reciprocal commitment by another party? Dose the work authorization contract make dear the commitment agreed to by both parties? - Contracted terms: What are excusable delays, allowable costs, statements of liquidated damages in the case of ……. performance? What are the criteria for inspection? Who has responsibility for correction of deffects?

SCOPE reporting fulfills the project team and key client about their needs for project updates, how many will they required, and how frequently? By determining the types of information that will be regularly reported, who will receive copies of this information, and how this information will be acquired and disseminated.

Project reporting parameter Cost Status: Update on budget performance - S Curves: Graphical displays of costs (including laborious and offer costs) against project schedule - Earned Value: Reporting project status in terms of both cost and time (the budget value of work performed regandless of actual costs incurred). - Variance or Exception Reports: Documenting any slippages in time, performance, or cost against planed measures Schedule Status: Updates on schedule adherence. Technical Performance Status: Updates on technical challenges and solutions.

CONTROL SYSTEM A famous question once asked: “How does a project become one year later?” The answer was, “one day at a time.” Control System is vital to ensure that any changes to the project baseline are conducted in a systematic and through manner.

CONTROL SYSTEM Configuring Control: Includes procedures that monitor emerging project scope against the original scope. Design Control: Relates to systems for monitoring the project’s scope, schedule, and costs during the design stage. Trend Monitoring: is the process of tracking the estimated costs, schedules, and resources needed against those planned. Document Control: Ensures that important documentation is compiled and disseminated in an orderly and timely fashion. Acquisition Control: Monitor systems used to acquire necessary project equipment, materials, or services needed for project development and implementation. Specification control ensures that project specifications are prepared clearly, communicated to all concerned parties, and changed only with proper authorization.

PROJECT CLOSEOUT The Project closeout step requires project managers to consider the types of records and reports, they and their clients will requires at the completion of project. Closeout documentation are: 1. Historical Record: As the project documentation that can be used to predict trends, analyze feasibility, and highlight problem areas for similar future project, may be kept. 2. Post project Analysis: Which follows as formal reporting structure, including analysis and documentations of the project’s performance in terms of cost, schedule adherence, and technical specification performance, may be prepared. 3. Financial closeout, or the accounting analysis of how founds were dispered on the project, may be produced.