Project Headlands, Phases 1 and 2

Slides:



Advertisements
Similar presentations
SR Lititz Pike Bridge Replacement Note: Dates indicated in this presentation are estimated based on the contractors current schedule and does.
Advertisements

Town of Mount Airy Main Street Construction Update Community Forum #5 and #6.
Lawrence Park-Wide Traffic Task Force Update April 11 th, 2008 Lawrence Park Ratepayers Association.
CR 236 Resurfacing from US 441 to I-75 30% Plans Alachua County Board of County Commissioners September 28, 2010.
City of Omak Central Avenue Bridge Replacement Project Prepared by Highlands Associates Photos by FlyBy Photos.
Titusville to Edgewater Bike Loop PD&E Study
Lander Streets and Utilities 2015 Public Meeting No. 2 McDougall & Cliff Project Area.
Capilano Road Improvement Project WELCOME TO THE OPEN HOUSE.
West Contra Costa Unified School District
Project Construction Update August 30, 2011 I-5 North Stockton Freeway Widening and Pavement Reconstruction Project Between Dr. Martin Luther King Jr.
75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014.
Capital Improvement Program City of Warren, Ohio April 2012.
March 14, 2013 CSSC Transportation Update. APG Traffic Counts Tuesday (2/26/13)Wednesday (2/27/13)Thursday (2/28/13) 6:00 – 7:00 AM :00 –
Clinton Street Bridge over the Maumee River ODOT Project DEF April 1, 2015 Stakeholder’s Meeting.
2 Why fortify? 30-year-old pavement was cracking and crumbling because of a chemical reaction happening underneath the road, triggered by a substance.
Route 28 South of I-66 Corridor Safety and Operations Study Technical Committee Meeting #2 June 25,
Bridge Rehabilitation W Interstate 290 over CSX Railroad and 4 City Streets I-290 Viaduct Reconstruction.
Northwest ISD Samuel Beck Elementary School Addition and Renovations, 2012.
Alameda Creek Bridge Replacement Scoping Meeting March 4, 2014.
Capital Improvement Program. During the Annual Strategic Action Plan (SAP) evaluation, long-term needs and priorities are identified by City Council Capital.
Roosevelt Road: State to Columbus Public Meeting September 22, 2015.
Town of Cobourg Division Street Improvements Public Information Centre October 1, 2015 Image Courtesy of Google 2015.
State Road 5 over Eel River Bridge Rehabilitation DES# South Whitley Community Public Library Thursday, February 5, :30 p.m. Please silence.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Public Information Meeting.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Public Works Department FY Budget Challenges February 16, 2010.
Campus Renewal Project Closing of Parkview Place Starting July 7 Date: May 27, 2014.
1 Leon County Board of County Commissioners MICCOSUKEE ROAD RESURFACIING INTERMITTENT ROAD CLOSURE From North MERIDIAN STREET To DOCTORS DRIVE.
Design Manager: Chris Thomas CEAL July 17, Interstate 8 (I-8) to Interstate 5 (I-5) Connector Widening and Auxiliary Lane Project.
HOOSIER HEARTLAND HIGHWAY SR25 Segment Four Cass County Public Information Meeting December 10, 2009 Design Consultant – United Consulting Engineers.
MED SR 18 Corridor Project MED PID October 13, 2015.
Major Project Scoping Committee.  Two previous studies to develop improvements for the I-35W Corridor ◦ Project Limits were from 42 nd to I-94 ◦ Project.
Elevating the Quality of Life in the District. Agenda  SITE VIEW  SECTIONS  CONSTRUCTION STRATEGY  TIMELINE – JUNE 2013 TO JULY 2015  TIMELINE –
I-5/Genesee Avenue Interchange Project. Project Purpose Improve east and west traffic flow on Genesee Ave. Enhance access to and from I-5 Replace and.
Approve Humboldt Avenue Pedestrian and Bicycle Improvement Project Plans.
Excellence - Integrity - Service - Creativity - Communication Courts of Canterbury HOA Meeting Rufe Snow Reconstruction Project Construction Update Keith.
GEORGE WASHINGTON HIGHWAY WIDENING PROJECT E.V. WILLIAMS, INC.
Hearst Recreation Center

City of Charlottesville
Proposal of SERVICE & FARE CHANGES
Week 7, April 10, 2017.
The Gainesville Area Chamber Infrastructure Investment Initiative
Scranton/Carter Road Reconstruction
June 5, 2017.
Sully District Council of Citizens Associations January 25, 2017 Susan Shaw, P.E., Megaprojects Director Virginia Department of Transportation.
Getting to the Walters Art Museum, Sunday, September 18th
Project Status & Right-of-Way Acquisition
June 26, 2017.
2012 Sarasota Chalk Festival Overview Sarasota City Commission
Waltham Road (Andover – North Star).
CHANNEL DISTRICT ACTION TEAM
Proposal of SERVICE & FARE CHANGES
Citizens’ Bond Oversight Committee March 22, 2017
Arizona Conference on Roads and Streets Multimodal Cities: Addressing Issues in Transit Corridors March 24, 2016.
Facilities Report to the Buffalo State College Senate May 6, 2016
Malibu Canyon Pole Replacement Project Information
Transportation Alternatives (TA) Set-aside
Capital Improvement Program
Issaquah-Fall City Road
The Construction team appreciates this opportunity to discuss the work that will begin in October on State Road 397 over Toms Bayou. My name is Mike Sasser,
Work Hours: Monday – Saturday, 5:00 a.m. – 3:30 p.m.
Meadow Lake Boulevard Street Extension Project
Harbour Island Force Main Replacement
FY Budget Workshop Meeting
Metropolitan District | mndot.gov
ODOT Region 1 Lents Neighborhood
Project Location. Cambridge/Arlington Intersection Reconstruction Public Information Meeting June 16, 2015.
Utility Relocation: 11th/Mill
State Route 55 Improvement Project from Interstate 5 to State Route 91
Presentation transcript:

Project Headlands, Phases 1 and 2 Presentation to Sausalito City Council February 26, 2013 Preservation of 7 metal bridges

Phase1 Summary: Schedule: 2010-2011 – Complete Budget – 8.76 million East, Conzelman, McCullough, Field Roads and Danes Drive Restoration of “erosion fingers” on Conzelman Construction of 5 overlooks on East Road and Conzleman Northwest Bridge and Battery Alexander parking lots Improved parking, bike, public transit and disabled access Schedule: 2010-2011 – Complete Budget – 8.76 million

Watertower stabilization Building 64 bridges Dock Guartower

$1,615,181.00 -steel replacement equipment issues -roof eave angle rework

7

$1,615,181.00 -steel replacement equipment issues -roof eave angle rework

$1,615,181.00 -steel replacement equipment issues -roof eave angle rework

$1,615,181.00 -steel replacement equipment issues -roof eave angle rework

$1,615,181.00 -steel replacement equipment issues -roof eave angle rework

PHASE 2 SCOPE Bunker, Old Bunker, Mitchell Roads: Resurfacing, Restoration and Rehabilitation Parking Lots – Smith Road, Fort Cronkhite Annex Lot, Fort Cronkhite Lot Fort Cronkhite Parade Ground Quarry Fort Cronkhite Dirt Overflow Lot restoration Guardrail replacement at East Bunker Road  Alexander Avenue Left turn lane extension/MSE wall installation

SCHEDULE BUDGET Bunker/Mitchell/Old Bunker: April 2013-June 2014 Alexander Ave/Quarry: April 2013-June 2013 BUDGET $11,257,789.00 Preservation of 7 metal bridges

Impacts:

Preservation of 7 metal bridges

Scoping, De-Scoping and Re-Scoping >>>Sequencing impacts 22

Traffic Control on Alexander Avenue No road closures – 15 minute delays maximum Two way traffic maintained during non-work hours (22’ vehicles and bikes/3’ for peds) Priority given to vehicles exiting off of 101 Northbound Daytime work causing delays allowed 8am-5pm, except during paving (8am-6pm). Nightime work permitted upon approval by the CO Sunday-Friday, 9pm-6am Traffic Control Plan reviewed by FHWA, GGBHTD and NPS Alternate routes will be available and strongly suggested

Project Resources WEBSITE: www.projectheadlands.gov EMAIL: projectheadlands@dot.gov TELEPHONE: 415-561-2847 David Dusterhoff, NPS Project Liaison David_Dusterhoff@nps.gov 415-561-4977