NPM Workplan K. Kavoussanakis.

Slides:



Advertisements
Similar presentations
LCG WLCG Operations John Gordon, CCLRC GridPP18 Glasgow 21 March 2007.
Advertisements

Tony Doyle GridPP2 Proposal, BT Meeting, Imperial, 23 July 2003.
08/11/908 WP2 e-NMR Grid deployment and operations Technical Review in Brussels, 8 th of December 2008 Marco Verlato.
EGEE is a project funded by the European Union under contract IST JRA4 Execution Plan and Brainstorming Javier Orellana JRA4 Coordinator EGEE.
EGEE is a project funded by the European Union under contract IST JRA1 Testing Activity: Status and Plans Leanne Guy EGEE Middleware Testing.
DORII Joint Research Activities DORII Joint Research Activities Status and Progress 4 th All-Hands-Meeting (AHM) Alexey Cheptsov on.
EGI-InSPIRE RI EGI-InSPIRE EGI-InSPIRE RI EG recent developments T. Ferrari/EGI.eu ADC Weekly Meeting 15/05/
INFSO-RI Enabling Grids for E-sciencE Federated Network Performance Monitoring for the Grid K. Kavoussanakis, EPCC, The University.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis, EPCC, The University of Edinburgh J-P. Gautier,
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
The Minnesota State Colleges and Universities system is an Equal Opportunity employer and educator. Information Technology Enterprise Strategic Investment.
INFSO-RI Enabling Grids for E-sciencE Plan until the end of the project and beyond, sustainability plans Dieter Kranzlmüller Deputy.
Bob Jones Technical Director CERN - August 2003 EGEE is proposed as a project to be funded by the European Union under contract IST
SA1/SA2 meeting 28 November The status of EGEE project and next steps Bob Jones EGEE Technical Director EGEE is proposed as.
NMI End-to-End Diagnostic Advisory Group BoF Fall 2003 Internet2 Member Meeting.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Multi-level monitoring - an overview James.
BalticGrid-II Project BalticGrid-II Kick-off Meeting, , Vilnius1 Joint Research Activity Enhanced Application Services on Sustainable e-Infrastructure.
JRA Execution Plan 13 January JRA1 Execution Plan Frédéric Hemmer EGEE Middleware Manager EGEE is proposed as a project funded by the European.
BalticGrid-II Project The Second BalticGrid-II All-Hands Meeting, Riga, May, Joint Research Activity Enhanced Application Services on Sustainable.
INFSO-RI Enabling Grids for E-sciencE EGEE SA1 in EGEE-II – Overview Ian Bird IT Department CERN, Switzerland EGEE.
EGEE is a project funded by the European Union under contract IST Network Resources Provision Jean-Paul Gautier SA2 manager Cork meeting,
JRA2: Quality Assurance Overview EGEE is proposed as a project funded by the European Union under contract IST JRA.
Overview and status of the project EuroVO-AIDA – Final review – 5 October 2010 Françoise Genova, Project Coordinator, 1 Overview and status of the project.
WP3 Information and Monitoring Rob Byrom / WP3
Authentication and Authorisation for Research and Collaboration Christos Kanellopoulos
INFSOM-RI Project Overview Alberto Di Meglio Project Manager 2.
CERN Alberto Di Meglio Darmstadt, February 2009 Project Status Update ETICS 2 All-Hands Meeting.
INFSO-RI Enabling Grids for E-sciencE NRENs & Grids Workshop Relations between EGEE & NRENs Mathieu Goutelle (CNRS UREC) EGEE-SA2.
EGEE is a project funded by the European Union under contract IST Roles & Responsibilities Ian Bird SA1 Manager Cork Meeting, April 2004.
SA2 : Network Resource Provision All Activity Meeting – 17 March SA2 Execution Plan for the first year Jean-Paul Gautier SA2 Manager CNRS/UREC.
INFSO-RI Enabling Grids for E-sciencE Technical Overview Bob Jones, Technical Director, CERN EGEE 1 st EU Review 9-11/02/2005.
EGEE is a project funded by the European Union under contract IST Information and Monitoring Services within a Grid R-GMA (Relational Grid.
Connect. Communicate. Collaborate JRA1 Status Update Stephan Kraft, RRZE FAU Erlangen-Nürnberg JRA1 Montpellier Meeting, October 2006.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Ian Bird All Activity Meeting, Sofia
Javier Orellana JRA4 Coordinator Face to Face Partners Meeting University College London 11 December 2003 EGEE is proposed as a project funded by the European.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks SA2 Networking support for EGEE III Xavier.
INFSO-RI Enabling Grids for E-sciencE SA2 and JRA4: Network Services K. Kavoussanakis J-P. Gautier.
EGEE is a project funded by the European Union under contract IST JRA4 Overview Javier Orellana JRA4 Coordinator EGEE Kick Off Meeting SA2.
JRA1 Activity Feedback Frédéric Hemmer EGEE Middleware Manager and the JRA1 team EGEE is a project funded by the European Union under contract IST
INFSO-RI Enabling Grids for E-sciencE NPM Security Alistair K Phipps (NeSC) JRA4 Face To Face, CERN, Geneva.
Javier Orellana JRA4 Coordinator All-Activity Meeting CERN 14 January 2004 EGEE is proposed as a project funded by the European Union under contract IST
GridPP2 Data Management work area J Jensen / RAL GridPP2 Data Management Work Area – Part 2 Mass storage & local storage mgmt J Jensen
INFSO-RI Enabling Grids for E-sciencE Network Services Development Network Resource Provision 3 rd EGEE Conference, Athens, 20 th.
EGEE is a project funded by the European Union under contract IST Pete playing devils advocate JRA4-F2F Javier Orellana EGEE-JRA4.
Javier Orellana EGEE-JRA4 Coordinator CERN March 2004 EGEE is proposed as a project funded by the European Union under contract IST Network.
TSA1.4 Infrastructure for Grid Management Tiziana Ferrari, EGI.eu EGI-InSPIRE – SA1 Kickoff Meeting1.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Operational Tools M2 Update James Casey.
JRA1 Middleware re-engineering
OASIS Next Generation Project Summary
Bob Jones EGEE Technical Director
Grid Event Management Using R-GMA Monitoring Framework
Regional Operations Centres Core infrastructure Centres
Status of SA2 network monitoring and troubleshooting tools
EGEE is a project funded by the European Union
EGEE Middleware Activities Overview
JRA1/Job Submission and Monitoring
SA1 Execution Plan Status and Issues
Claudio Grandi (INFN and CERN)
Ian Bird GDB Meeting CERN 9 September 2003
ETICS 2 All-Hands Meeting
JRA1 (Middleware) Overview
Elisabetta Ronchieri WP3
Leanne Guy EGEE JRA1 Test Team Manager
WP7 objectives, achievements and plans
LCG Operations Centres
Continuous Performance Engineering
Future EU Grid Projects
Wide Area Workload Management Work Package DATAGRID project
e-Infrastructure commons Updates
Peter Clarke EGEE Peter Clarke
Presentation transcript:

NPM Workplan K. Kavoussanakis

NPM Deliverables PM12 MJRA4.3 “Prototype tool” Discussed enough for now PM18 MJRA4.6 “Specification of monitoring and diagnostic tools; revision of NPM metrics” PM21 DJRA4.5 “Service to supply NPM to middleware” PM24 DJRA4.7 “Report on NPM in EGEE”

MJRA4.6 Due PM18: Specification of high-level monitoring and diagnostic tools. Revision of NP metrics. Deliver a tool, together with the design for it. What could it do? Expose selected metrics Expose trouble tickets Attempt to “script” the actions a Network Operator would take to diagnose a network fault Enhanced WP7 deployment a parallel activity

What user? We need to identify a set of users so as to extract requirements on the Security and UI fronts and certainly on metrics. We have expertise within the group from GARR and DFN, and also from DANTE and CNRS, which we should exploit anyway. If we don’t find users, we shall press on based on above. It would be impressive if our tool was used by the 5 EGEE Core Infrastructure Centres (CIC) http://egee-sa1.web.cern.ch/egee-sa1/Organisation.htm Made preliminary contacts, to be followed up on Wednesday Overly ambitious? Other alternatives?

The hidden goals Deployment must have progressed significantly by then Which is why we must fix the number of tools we will need to deploy very soon As part of MJRA4.3? April? Continuous yet gradual deployment on more and more sites. Backbone monitoring? Security Control both who and how accesses the data and who and how provides the data Discovery Downgraded for MJRA4.3; should/could it stay a fixed table? Aggregation Mk II

MJRA4.6 Timelines Specify DT (PM18) UI specification and use cases (PM13) Mediator design (PM13) Design of tool (PM14) Develop & Test Mediator & DT (PM18) Beta (PM16) First (PM18) (Bug-fixes PM21-22) Deploy NPM framework and Mediators (PM18) Deployment plan (PM13) Requires understanding of monitoring requirements Midi (PM16) Maxi (PM18) Revise metrics (PM18) Depends on users’ early opinions Would benefit from beta releases of tool and deployment

DJRA4.5 Due PM21 (3 months after Diagnostic Tool) and a Deliverable rather than a Milestone. PM21 is also December Service to supply network performance information to resource brokering middleware Note “Service”; deployment is key It requires significant interactions with JRA1, which we can start soon and really pursue from April onwards Volunteers? If the interactions don’t happen, we shall press on speculating Different architecture and perhaps North security model from Diagnostic Tool Overlapping modules?

DJRA4.5 Timelines Specify GIS (PM21) Develop & Test Publisher and GIS UI specification and use cases (PM14) Publisher design (PM14) Design of GIS (PM15) Develop & Test Publisher and GIS Beta (PM18) First (PM21) (Bug-fixes PM22-23) Deployment Exploit deployment of MJRA4.6 Publisher deployment? Dissemination to and integration with JRA1/NA4 Must start in PM13 at the latest

MJRA4.6 and DJRA4.5 Dissemination to and integration with JRA1/NA4 Specify DT (PM18) UI specification & use cases (PM13) Mediator design (PM13) Design of tool (PM14) Deploy NPM framework and Mediators (PM18) Deployment plan (PM13) Requires understanding of monitoring requirements Midi (PM16) Maxi (PM18) Develop & Test Mediator & DT (PM18) Beta (PM16) First (PM18) (Bug-fixes PM21-22) Revise metrics (PM18) Depends on users’ early opinions Would benefit from beta releases of tool and deployment Dissemination to and integration with JRA1/NA4 Must start in PM13 at the latest Specify GIS (PM21) UI specification and use cases (PM14) Publisher design (PM14) Design of GIS (PM15) Develop & Test Publisher & GIS Beta (PM18) First (PM21) (Bug-fixes PM22-23) Deployment Exploit deployment of MJRA4.6 Publisher deployment?