Data acquisition system for the Baikal-GVD neutrino telescope

Slides:



Advertisements
Similar presentations
Lake Baikal Neutrino Experiment Present and Future G.V.Domogatsky (INR, Moscow) for the Baikal collaboration.
Advertisements

Kay Graf Physics Institute 1 University of Erlangen ARENA 2006 University of Northumbria June 28 – 30, 2006 Integration of Acoustic Neutrino Detection.
A scalable DAQ system using the DRS4 sampling chip H.Friederich 1, G.Davatz 1, U.Hartmann 2, A.Howard 1, H.Meyer 1, D.Murer 1, S.Ritt 2, N.Schlumpf 2 1.
Kay Graf University of Erlangen for the ANTARES Collaboration 13th Lomonosov Conference on Elementary Particle Physics Moscow, August 23 – 29, 2007 Acoustic.
Calibration of the 10inch PMT for IceCube Experiment 03UM1106 Kazuhiro Fujimoto A thesis submitted in partial fulfillment of the requirements of the degree.
Aloha Proof Module Design Cabled Observatory Presentation School of Ocean and Earth Science and Technology February 2006.
Prototype string for a km3 Baikal neutrino telescope Roma International Conference on Astroparticle Physics V.Aynutdinov, INR RAS for the Baikal Collaboration.
Sebastian Böser Acoustic test setup at south pole IceCube Collaboration Meeting, Berkeley, March 2005.
Search for relativistic magnetic monopoles with the Baikal Neutrino Telescope E. Osipova -MSU (Moscow) for the Baikal Collaboration (Workshop, Uppsala,
The PEPPo e - & e + polarization measurements E. Fanchini On behalf of the PEPPo collaboration POSIPOL 2012 Zeuthen 4-6 September E. Fanchini -Posipol.
Coincidence analysis in ANTARES: Potassium-40 and muons  Brief overview of ANTARES experiment  Potassium-40 calibration technique  Adjacent floor coincidences.
1 S. E. Tzamarias Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Readout Electronics DAQ & Calibration.
SINP MSU, July 7, 2012 I.Belolaptikov behalf BAIKAL collaboration.
Data acquisition system for the Baikal-GVD neutrino telescope Denis Kuleshov Valday, February 3, 2015.
S. Viola VLVνT 2015, Rome – 14/09/2015 Characterization and testing of the KM3NeT acoustic positioning system F. Simeone VLVνT 2015 – Rome, 14/09/2015.
Baikal Neutrino Experiment Vladimir Aynutdinov for the Baikal Collaboration Athens, October 13, 2009.
1 N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Operation and performance of the NESTOR test detector.
Physics results and perspectives of the Baikal neutrino project B. Shoibonov (JINR, Dubna) for the Baikal collaboration February 2009.
STATUS OF BAIKAL NEUTRINO EXPERIMENT: Vladimir Aynutdinov, INR RAS, Moscow for the Baikal Collaboration for the Baikal Collaboration HECR’ May.
Digital & Analog electronics for an autonomous, deep-sea Gamma Ray Burst Neutrino prototype detector K. Manolopoulos, A. Belias, E. Kappos, C. Markou DEMOKRITOS.
1 A.Tsirigotus Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch The NESTOR O.M.
Design for Wide FOV Cherenkov telescope upgrading THE 2 nd WORKSHOP OF IHEP Shoushan Zhang Institute of High Energy Physics.
Catania 11 ICATPP october, 2009 Como 1/12 Catania Comparative measurements of the performances of four super bialkali large.
Baikal-GVD: status and plans Denis Kuleshov Denis Kuleshov INR, Moscow, Oct 28, 2015.
Gigaton Volume Detector in Lake Baikal: status of the project Zh.-A. Dzhilkibaev (INR, Moscow) Zh.-A. Dzhilkibaev (INR, Moscow) for the Baikal Collaboration.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
BAIKAL-GVD: status, results and plans Zh.-A. Dzhilkibaev, INR (Moscow), for the Baikal Collaboration for the Baikal Collaboration Amsterdam, October 17,
5 June 2002DOM Main Board Engineering Requirements Review 1 DOM Main Board Hardware Engineering Requirements Review June 5, 2002 LBNL David Nygren.
Time and amplitude calibration of the Baikal-GVD neutrino telescope Vladimir Aynutdinov, Bair Shaybonov for Baikal collaboration S Vladimir Aynutdinov,
A Device for Detection of Acoustic Signals from Super High Energy Neutrinos Presenter: Presenter: G.L.Pan'kov Applied Physics Institute of Irkutsk State.
Status of the PSD upgrade - Status of the PSD cooling and temperature stabilization system - MAPD gain monitoring system - PSD readout upgrade F.Guber,
Nearly vertical muons from the lower hemisphere in the Baikal neutrino experiment Zh. Dzhilkibaev - INR (Moscow) for the Baikal Collaboration ( Uppsala,
Calibration of Under Water Neutrino Telescope ANTARES Garabed HALLADJIAN October 15 th, 2008 GDR Neutrino, CPPM, Marseille.
A. Tsirigotis Hellenic Open University N eutrino E xtended S ubmarine T elescope with O ceanographic R esearch Reconstruction, Background Rejection Tools.
Status of NEWCHOD E.Guschin (INR), S.Kholodenko (IHEP), Yu.Kudenko (INR), I.Mannelli (Pisa), O.Mineev (INR), V.Obraztsov (IHEP), V.Semenov(IHEP), V.Sugonyaev.
Update on works with SiPMs at Pisa Matteo Morrocchi.
The BAIKAL-GVD project of a km3-scale neutrino telescope in Lake Baikal Vladimir Aynutdinov for the Baikal Collaboration Beijing, 17 August, International.
Isabella Amore VLV T08, Toulon, France April 2008 International Workshop on a Very Large Volume Neutrino Telescope for the Mediterranean Sea Results.
Status and Perspectives of the BAIKAL-GVD Project Zh.-A. Dzhilkibaev, INR (Moscow), for the Baikal Collaboration for the Baikal Collaboration September.
Gigaton Volume Detector in Lake Baikal Vladimir Aynutdinov for the Baikal Collaboration Cassis, May 3, th International Workshop on Ring Imaging.
High energy neutrino acoustic detection activities in Lake Baikal: status and plans N.Budnev for the Baikal Collaboration Irkutsk State University, Russia.
Prototyping Phase of the BAIKAL-GVD Project Zh.-A. Dzhilkibaev, INR (Moscow), for the Baikal Collaboration for the Baikal Collaboration Rome, May,
THE BAIKAL NEUTRINO EXPERIMENT: STATUS, SELECTED PHYSICS RESULTS, AND PERSPECTIVES Vladimir Aynutdinov, INR RAS, Moscow for the Baikal Collaboration for.
KM3NeT Neutrino conference 2-7 June 2014, Boston, U.S.A. Maarten de Jong on behalf of the KM3NeT collaboration The next generation neutrino telescope in.
IRFU The ANTARES Data Acquisition System S. Anvar, F. Druillole, H. Le Provost, F. Louis, B. Vallage (CEA) ACTAR Workshop, 2008 June 10.
Development of new DAQ system at Super-Kamiokande for nearby supernova A.Orii T. Tomura, K. Okumura, M. Shiozawa, M. Nakahata, S. Nakayama, Y. Hayato for.
 13 Readout Electronics A First Look 28-Jan-2004.
The prototype string for the km3 scale Baikal neutrino telescope VLVnT April 2008 Vladimir Aynutdinov, INR RAS for the Baikal Collaboration for.
The dynamic range extension system for the LHAASO-WCDA experiment
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Front-end Electronic for a neutrino telescope : a new ASIC SCOTT
Status of the Baikal-GVD experiment
Jinfan Chang Experimental Physics Center , IHEP Feb 18 , 2011
Status of the BAIKAL-GVD Project Zh.-A. Dzhilkibaev, INR (Moscow),
Robert Lahmann VLVnT – Toulon – 24-April-2008
An expected performance of Dubna neutrino telescope
KRB proposal (Read Board of Kyiv group)
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
VLVNT08 Toulone April 2008 Low Power Multi-Dynamics Front-End Architecture for the OM of a Neutrino Underwater Telescope Domenico Lo Presti Istituto Nazionale.
Baikal-GVD (technical report)
LHAASO-WCDA: Design & Performance
A First Look J. Pilcher 12-Mar-2004
Front-end electronic system for large area photomultipliers readout
Directional Optical Module Integration
Department of Physics and Astronomy,
Commodity Flash ADC-FPGA Based Electronics for an
BESIII EMC electronics
High Rate Photon Irradiation Test with an 8-Plane TRT Sector Prototype
Development of hybrid photomultiplier for Hyper-Kamiokande
Presented by T. Suomijärvi
Presentation transcript:

Data acquisition system for the Baikal-GVD neutrino telescope 5th Roma International Conference on Astroparticle Physics   Data acquisition system for the Baikal-GVD neutrino telescope Vladimir Aynutdinov for Baiakal collaboration September 30, 2014

OUTLINE 1. Baikal site 2. GVD design and electronics 3. Engineering array 2014 4. Summary

Collaboration 7 Institutions, ~ 50 authors State Marine U. Petersburg JINR Dubna INR, MSU Moscow Techn State U. Nizhni Novgorod Irkutsk State University Germany: EvoLogics GmbH 7 Institutions, ~ 50 authors Collaboration

The BAIKAL Site Lake Baikal, Siberia , nm Absorption cross section, m-1 Scattering cross section, m-1 Baikal water properties: Abs.Length: 22 ± 2 m Scatt.Length: 30-50 m 1370 m maximum depth. Distance to shore ~4 km No high luminosity bursts from biology. No K40 background. Deployment simplicity: ice is a natural deployment platform Winter expedition Summer Day temperature Baikalsk 4

Gigaton Volume Detector GVD 2015 – 1 Cluster with 8 strings (196 OM) 2020 –12 Cluster (1st GVD phase - 0.4 km³) ) The pressure-resistant optical sensors register flashes of the Cherenkov light emitted by charged particles from collisions of high-energy neutrinos. Cluster – 8 str. Neutrino Muon Cascade Cherenkov light Optical sensors R = 60 m H = 350 m Optical module. GVD String 24 OM

GVD Optical module Φ220 mm R7081-100 Hamamatsu Quantum efficiency R7081-100 Hamamatsu D=10 inch. SBA photocathode QE ≈ 35% @ 400nm; Gain ~107, dark count ~8 kHz Angular sensitivity OM electronics Mu-metal cage PMT Optical gel Glass pressure-resistant sphere VETROVEX (17”)

Optical module electronics HV converter: SHV 12-2.0 K 1000 P 0 …+ 2000 VDC, stability 0.05% ripple and noise 8 mVpk-pk Passive divider: 18 M 2-channel amplifier: Output channel and PMT noise monitoring channel. LED flasher: 2 LEDs L7113: 470 nm, ~6 ns - Intensities regulation: 1…~108 photons - Flashes delay regulation: 0 … 1000 ns Slow control board: SiLabs C8051F121 Control of electronics operation and monitoring of PMT parameters via RS485 interface. Power consumption – max 0.3A12V

Functional scheme of one FADC channel ADC electronics FPGA FADC (AD9430) 12bit, 200 MSPS FPGA (Xilinx Spartan 6) Trigger channel: 2-level digital comparator forms low threshold L and high threshold H channel requests ( GVD basic trigger: L&H coincidence of neighboring channels). Data channel (triggered) consists of double-buffered memory and data transmitter. - Monitor channel (non-triggered) includes peak detector and amplitude analyzer. Functional scheme of one FADC channel LED pulse Noise Waveform stamp example (5 mks) Single PE pulses Data channel Monitor channel Monitor histogram examples 8

Measuring channel 90 m coax.cable PMT: nominal gain: 1107; Amplifier: kamp=14; Cable: ~0.7: 108 in total Pulse width after cable: ~20 ns FWHM. FADC: 4V. 12 bit, 5 ns time bin. Linearity range: 1 ─ 102 p.e.; Count rate (0.3 PE) ~ 25 kHz in average. Threshold (min): ~ 0.20×Ape Measuring channel PMT: 107 Amplifier: 14 FADC: ± 2V 90 m coax.cable 1 2 11 12 GVD Section: 12 channels <Ape> = 30 ch  Ape ~ 10% Distribution of the channels on Ape (2014), ADC chan. N Count rate distribution for all channels (2014), kHz. <f> = 23 kHz

GVD Section Section (basic DAQ cell) – 12 OM and Section electronics module (SeM). 12-channel ADC unit: PMTs analog pulse conversion, time synchronization, data processing, local trigger. Data transmission: Two outputs of ADC board: optical output (for future detector extension) and 100 BASE-TX (present stage). shDSL modem: Extending the Ethernet line up to 1 km. Slow control board: OM power on/off and control of OM operation (RS485). SeM MASTER MOXA IEX-402-SHDSL SLOW CONTROL FADC

Engineering array 2014 The current stage of Baikal-GVD Cluster comprising 5 strings (112 OM) 14 April – 25 September: 169 days Data taking: 122 days Efficiency: 72.2% Total: 452 Runs Data : 1.26 108 events Basic trigger: coincidences of neighboring OM with low and high thresholds (1 & 3 p.e.)

Count rates f for all channels, Background condition String 3, Section 2 (Up) String 3, Section 1 (Down) String 5, Section 1 (Down) String 5, Section 2 (Up) Channel count rate for two strings: April – September 2014 N <f> = 23 kHz Count rates f for all channels, from April to August 2014 f, kHz 1. Significant count rate variations depending the season (chemiluminescence). 2. Strong correlation between peak of activity. 3. Average count rate ~20-25 kHz (0.3 p.e.)

Stability of the channels Selected parameters: PMT high voltage (HV) Channel gain (G ) Noise rejection factor ( ): count rate ratio for thresholds 2 p.e / 0.5 p.e. 1100 V 1800 V HV: 1100V … 1800V: PMT Gain 107 N channels HV max deviation: 0.5V … 1.2V (~0.05% stability) May – September 2014; 0.5 V 1.3 V N channels SPE spectrum measured with LED (black) and PMT noise (red) N Channel distribution on max. HV deviation N Channel distribution on the Gain 1.0 1.3 1.6 1.9 0.7 G 108 Run 299 <G> = 1.17 108  G ~ 10% N channels Data 12 May RUN 142 10 Jul RUN 299 21 Aug RUN 399  G> 1.12 (0.02) ×10 8 1.17(0.02) ×10 8 1.14 (0.02) ×10 8 < G >, % 9.9 10.1 9.3 <  > 3.36 (0.12) ×10-1 3.39 (0.18) ×10-1 3.25 (0.15) ×10-1

“On the Velocity of light signal …” NIM A482 (2002), 304-306 LED flashes detection Reference channel Ch 60 Ch 61 Ch 62 Ch 59 Ch 58 Ch 57 Ch 63 Ch 64 LED ~1 p.e. 3.6 p.e. 528 p.e. 257 p.e. 107 p.e. 36 p.e. 12 p.e. 578 p.e. t, ns R, m RUN C0247. 15 m “On the Velocity of light signal …” NIM A482 (2002), 304-306 LEDs L7113: 470 nm, FWHM: 6 ns Light propagation distance for maximum LED intensity ~100 m along the string in Baikal water. Experimental time consistent with expectation for the Q up to 2102 p.e. within ~3 ns accuracy. Possibilities of time walk effect direct estimation

Atmospheric muon detection Trigger Coincidence of neighboring OM Statistics 14 Apr – 25 Sep: 1.17× 108 events Selection – Q > 2 p.e. Time calibration: LED Data consistent with expectation dt distribution between neighboring channels

Summary 1. Results obtained on GVD engineering array demonstrate reliable, stable and correctness operation basic elements of the telescope. 2. Baikal -GVD technical design is basically finalized. 3. The nearest plans (April 2015): full scale GVD cluster in Baikal lake (8 strings).

THANK YOU

Backup slides

( ) ( ) ( ) ( ) Increasing allowed trigger rate: 5-10Hz -> 50Hz Time, 5 ns A, mV ( ) ( ) ( ) ( ) Increasing allowed trigger rate: 5-10Hz -> 50Hz Trigger rate is limited by the data transmission rate from the strings to DAQ-center: 5-6 Mbit (Ethernet, shDSL modem, 1 km line length). New firmware of the Master board: on-line data filtering. Cut the pulses from data frame and paste to output data stream. Rejection factor : 30-40

Power supply 300 VDC power supply system. Power commutator 300 VDC (12 channels) was specially designed for Baikal at 2011 Three-level power supply system: 1-st. Cluster center level (300V). Switching on/off string power supply. 2-nd. String level (300V). Switching on/off section power (independently ADC and OM). 3-rd. Section level (12V). Switching on/off OM power. String power consumption: 0.45A300V => Cluster (8 strings) ~1.2 KW

ADC board 12-ch 200 MSPS ADC FADC (AD9430) 12bit, 200 MSPS FPGA (Xilinx Spartan 6) Trigger logic: 2-level adjustable digital comparator forms low threshold L and high threshold H channel requests - Data channel (triggered) consists of double-buffered memory and data transmitter. - Monitor channel (non-triggered) includes peak detector and amplitude analyzer. - Trigger logic(L&H coincidence of neighboring channels - Data readout from ADC buffer - Control of OM mode of operation - Connection via local Ethernet to the cluster DAQ center

Cluster with 8 two-section strings (2015) GVD cluster architecture Cluster DAQ center Section electronic module Optical module String electronic module SECTION STRING Basic principles of GVD design: Simplicity of all elements; Deployment convenience from the ice cover; Detector extendability and configuration flexibility Basic GVD elements Optical module (OM); Section: 12 OM (spaced by 15m) & Section electronic module (12 FADCs) String: 2 Sections & String electronic module Cluster: 8 strings & DAQ center. Cluster with 8 two-section strings (2015)

Triggering and Data Transmission SECTION CLUSTER

Operational statistics 14 April – 25 September: 169 days Data taking: 122 days Efficiency: 72.2% Total: 452 Runs Data : 1.26 108 events Monitoring: 803 799 records Master data over 2014 Time between events