SIP 3
Patient Centered Flow Main (before 5 pm) Pavilion Main (after 5 pm) Pre-Op Holding Main (before 5 pm) OR PACU Unit/Home Pre-Op OR Pavilion PACU Unit/Home Holding OR Main (after 5 pm) PACU Unit/Home
Flow
SIP 3 Issue Samples Setting standard times for each activity How do we work with decreased resources Elastic variables (e.g. Start and finish times)
How do we link with the other SIP teams? Assumption that all patient and supply preparation and procedure information will be complete SIP 2: Similar processes to get the patient to the OR with different timelines and resource issues
Patient Centered Flow Main (before 5 pm) Pavilion Main (after 5 pm) Pre-Op Holding 60 min Main (before 5 pm) 60 min OR PACU 210 min 120 min Unit/Home Pre-Op OR 60 min Pavilion 110 min PACU 90 min Unit/Home Holding 60 min OR Main (after 5 pm) 210 min PACU 120 min Unit/Home
Questions to Oversight Team Have we missed any steps? Have we missed any issues or complicating factors? Are there other ways to breakdown the process (Main, Pavilion, Main – after hours) to get SIP 3 to the desired outcome? Any suggestions?