The Elimed Control System approch

Slides:



Advertisements
Similar presentations
CBM slow controls CBM collaboration meeting DAQ work group CBM collaboration meeting DAQ work group Burkhard Kolb GSI1.
Advertisements

Gelu M. Nita NJIT. Noise Diode Control Day/Night Attn. Ctrl. Solar Burst Attn. Ctrl. V/H RF Power Out Attn. Ctrl. Temperature Sensors.
ICU: Home Security System Mr. Jones Mr. Morrison.
Industrial Control Engineering Industrial Controls in the Injectors: "You (will) know that they are here" Hervé Milcent On behalf of EN/ICE IEFC workshop.
February 17-18, 2010 R&D ERL James Jamilkowski R&D ERL Controls Larry Hoff James Jamilkowski February 17-18, 2010 Controls.
UW Clinical Neutron Therapy Program. CNTS Engineering Staff Dave Reid Rob Emery Ruedi Risler James Kuan Eric Dorman Stefani.
LabView Users Group Meeting June 20 th, 2006 Process Control Using Compact Field Point/Labview Real-time Michael Tockstein Microelectronics Technology.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
EPICS Insertion Device Control System Pete Owens EPICS Collaboration Meeting June 2003 Control System for a Helical Undulator Pete Owens Daresbury Laboratory.
1 Progress of the Controls for BEPCII EPICS Seminar Presented by J. Zhao 20 August, 2002.
DAQ Cards, or Instruments The purpose of this presentation is to familiarize new Lab View users to the different computer aided test recourses available.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
TPC/TRD DCS meeting, GSI, 27 Sep 2002Børge Svane Nielsen, NBI1 TPC laser system controls adjustable mirrors Laser Controls, Power, Cooling DCS: 1/ Laser.
1 Responsibilities & Planning DCS WS L.Jirdén.
CLS Control System Progress Report Elder Matias Canadian Light Source University of Saskatchewan Saskatoon Saskatchewan.
Beam diagnostics in the beamlines
MA CS workshop Adriaan Rijllart1 LabVIEW integration into the LHC control system The LHCLabVIEW.
NICA control system, beam diagnostics V.Andreev, E.Gorbachev, A.Kirichenko, D. Monakhov, S. Romanov, G.Sedykh, T. Rukoyatkina, V.Volkov VBLHEP, JINR, Dubna.
1. LabVIEW and EPICS Workshop EPICS Collaboration Meeting Fall 2011.
7th IMAC Meeting 7th MACHINE ADVISORY COMMITTEE MEETING OF TARLA CONTROL SYSTEMS Ayhan AYDIN ANKARA UNIVERSITY ON BEHALF OF TARLA TEAM.
NSLS-II Transfer Lines BUDKER INSTITUTE OF NUCLEAR PHYSICS NOVOSIBIRSK.
Slow controls R and D Chris Gould North Carolina State University and TUNL.
11 th February 2008Brian Martlew EPICS for MICE Status of the MICE slow control system Brian Martlew STFC, Daresbury Laboratory.
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
CEA DSM Irfu SIS LDISC 18/04/2012 Paul Lotrus 1 Control Command Overview GBAR Collaboration Meeting Paul Lotrus CEA/DSM/Irfu/SIS.
Information support of physical experiments on Nuclotron NEC’2003 Varna, Bulgaria V. Andreev, E. Frolov, B. Sveshnikov., B. Vasilishin., V. Volkov (JINR)
Controls Test Stand Test stand proposal document review - Dayle. The activities can be prioritized according to which measurements we need to do first.
The Lead Glass Detector Overview, Experience and Direction.
Electrical Engineering for NSS - Status and Planning- Thomas Gahl Electrical Engineering Group Leader February 26, 2014.
Employment of scada system in water purification and transmission system.
Examples of Matlab Controls Software on ALICE Andy Wolski 24 September 2014 Multiknobs: simultaneous control of a set of magnets Undulator Gap Scan ALICE.
Introduce of Linac Control System Xiangcheng.Kong Control Group.
HIE-ISOLDE Project 3 rd beam line + HELIOS June 16th 2015 (updated on June 18th) Y. Kadi, S. Maridor.
Hall B Gas System Controls Physics Detector Support Group.
Gamma Beam System at ELI–NP The ELI–NP Team* ELI–NP, IFIN–HH, Bucharest–Magurele, Romania * The ELI–NP Gamma Beam System (GBS) will.
Using COTS Hardware with EPICS Through LabVIEW – A Status Report EPICS Collaboration Meeting Fall 2011.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
Scalable Readout System Data Acquisition using LabVIEW Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer]
V Review SPARC Diagnostic & Control Status G. Di Pirro On behalf control and diagnostic group.
Beam Diagnostics for the FAIR Proton LINAC RFQ Workshop at GSI
Motion Controllers in SLS and SwissFEL
A. Aloisio, R. Giordano Univ. of Naples ‘Federico II’
Use of FPGA for dataflow Filippo Costa ALICE O2 CERN
National Centre for Nuclear Research, Poland
Overview of TANGO Control system
Status & Plans for WA105 Control System
Diagnostic & Control Status
TOF Low Voltage and High Voltage Systems Vahe Ghazikhanian UCLA Department of Physics and Astronomy V. Ghazikhanian July 21, 2005.
Test bench for active bases for SATLAS Photomultipliers
Control and Data Acquisition System for VEST at SNU
E4 hall technical specifications
Current Status of IPM-Linac Control System
BI-day 2014, The SEM-grid renovation project Michel Duraffourg
ProtoDUNE SP – Slow control temperature readout setup test
P.V. Chumakov, D.S. Egorov, R.V. Nagdasev, V.B. Shutov
BE-BI Software for LINAC4
An Overall Structure of the PANDA Hydrogen Targets Slow Control
ADE today RADE workshop, Adriaan EN-ICE-MTA.
DarkSide-50 Distributed Control System Towards DarkSide-20k
MEDICIS Facility Isotope Separator Controls and HMI
Electronics requirements for special diagnostics for the XFEL
Development of built-in diagnostics in the RADE framework (EN2746)
CSNS Accelerator Control and Beam Instrumentation JIN Dapeng, XU Taoguang … June 9, 2015
دانشگاه شهیدرجایی تهران
تعهدات مشتری در کنوانسیون بیع بین المللی
DAQ Racks, Bins and Modules Internal Design Review
Linac Diagnostics Commissioning Experience
Ion Source and LEBT Beam Diagnostics
Slow PC Support Service Number
quadEM: New Beam Position Monitor & Electrometer Hardware and Software
Presentation transcript:

The Elimed Control System approch Praga, June 9, 2015

Subsystems Slow control: vacuum, power supplies, motor control, Beam Diagnostic: TOF detectors, beam emittance Dosimetry: faraday cups, transmission chambers, SEM monitor, sample irradiation system

Hardware features Expandibility Scalability Flexbility

Hardware levels First level Second level Third level Field control: NI-CRIO Beam Diagnostic: NI-PXI Dosimetry: NI-PXI Second level PC for interface with local users Third level Elimaia Console

Hardware subsystems EMI Cabinet slow control Control Room Power Supply 1 Power Supply 6 Magnet Power Supply High EMI Shielding Effectiveness at list 90db up to 10GHz Dosimetry and Beam Diagnostic cabinet Cabinet slow control interfaces Motor control Vacuum Interface ETHERNET Field Bus Protocols

Software system Control software: Labview Local Console software: Labview Export data to Elimaia control system DataSocket

A typical User Interface

Elimed Thanks for your attention.