Proposal on Drafting Hydrogen Storage System Part of the HFCV-gtr

Slides:



Advertisements
Similar presentations
OIL#19 Alternative warm-up procedure (JAPAN proposal) 14th of January, 2015 WLTP rev1e.
Advertisements

Brian Somerday Sandia National Laboratories Livermore, CA, USA
Japanese Technical Standard for Hydrogen Containers
Draft Deliberative Document1 of 15 Hydrogen Fuel Cell Vehicle Safety Research to Support Rulemaking/GTR Objectives September 2008 SGS
Worldwide Harmonised Test Procedure for Light Duty Vehicles WLTP EVE 2nd Session 13 of September Per Öhlund Co-chair Subgroup EV.
Research Activities of HFCV in Korea Speaker : Economy : The Republic of Korea.
ELECTRICAL SAFETY ISSUES DISCUSSION WITH SHUTTLE SMALL PAYLOADS PROJECTS (a.k.a. HITCHHIKER)
Proposal of Fire Resistance Test
Review of FAA Guidelines for Fabric Prepreg Material Specification
Helfried Rybin 1 AUTOMOBILENTWICKLUNG / ENGINEERING Safety Demands for Automotive Hydrogen Storage Systems Helfried Rybin.
WLTP-11-12e Christoph Lueginger (BMW), Céline Vallaude (UTAC), Folko Rohde (VW) on behalf of Annex 4 taskforce wind tunnel method road load.
Analysis of Circuits Containing Diodes. Definition of Diode Current and Voltage Forward Bias –When I D > 0mA and V D > 0V Reverse Bias –When I D < 0mA.
Item 3: Electrified Vehicle Battery Performance & Durability EVE-14-08e Presented by: USA, Canada EVE-14 meeting April 20,
Hydrogen Fueled Vehicle Global Technical Regulation (GTR) Subgroup Safety (SGS) Nha Nguyen 49 th GRSP Session May Informal document GRSP (49th.
NREL is a national laboratory of the U.S. Department of Energy, Office of Energy Efficiency and Renewable Energy, operated by the Alliance for Sustainable.
National Highway Traffic Safety Administration U.S. Proposal on BMS Functionality-In Use Brian T. Park Safety Engineer.
1 HPHT Equipment Development Process Presented by Jim Raney Based on the work from 6HP.
Comparison of Permeation Standards Among HySAFE, SAE and Japanese Regulations and Proposal to GTR JASIC -SGS SGS-9-06.
NREL is a national laboratory of the U.S. Department of Energy Office of Energy Efficiency and Renewable Energy operated by the Alliance for Sustainable.
TÜV SÜD Automotive GmbH SGS HFCV, Japan, 24th – 26th September 2008 GTR-Development for H2- and FC-Vehicles a TÜV SÜD - opinion SGS
Research Activities of HFCV in Korea May 26 ~ 29, th HFCV-SGS Meeting Ministry of Land, Transport and Maritime Affairs, Korea Transportation Safety.
SAE J2579 Technical Information Report Fuel Systems in Fuel Cell & Other Hydrogen Vehicles Presented by Phil Horton To Hydrogen Fuel Cell Vehicle Subgroup.
API 6HP Process1 API 6HP Example Analysis Project API E&P Standards Conference Applications of Standards Research, 24 June 2008.
SC6 Resource Group on Trees and Wellhead SC6 Winter Meeting 2012 Eric Wehner 22 February 2012.
Status of SAE FCV Safety Working Group Activities Developing Systems-level Performance- based Standards for Hydrogen and Fuel Cell Vehicles (FCVs) Presented.
1 PED: equivalent overall level of safety PED Annex 1, clause 7: The following provision apply as a general rule. However, where they are not applied,
André Rijnders RDW (NL) and Ernst Peter Weidmann ACEA-LCV
Reproduction interdite © ALMA EUROPEAN CONSORTIUM Reproduction forbidden Design, Manufacture, Transport and Integration in Chile of ALMA Antennas Page.
M M M R.
Mean: The AVERAGE values of a set of numbers. The mean is found by ADDING all of the values, then DIVIDING by the number of values in the set of data.
TF5 – Status report on thermal propagation EVS-GTR 9 th IWG meeting Changchun, China 2015/9/17.
Experimental and numerical studies on the bonfire test of high- pressure hydrogen storage vessels Prof. Jinyang Zheng Institute of Process Equipment, Zhejiang.
Yield point and yield stress or strength,  y Offset method finds this yield stress by assuming a 0.2 % strain (.002).002 Big yielding region, large elongation.
1 Warning requirement for the management system of the REESS May, 2014 U.S. DOT Head Quarter 1200 New Jersey Avenue, SE Washington, DG JASIC.
STAR ONE C1 - Insurance Presentation
Department of Transportation U.S. DOT National Highway Traffic Safety Administration Research & Development/Studies SGS-1-2.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-081 Leader: Per Ohlund / Kazuki Kobayashi.
10th EVS-gtr IWG Progress Report TF6 - SOC 2nd March
Yohsuke Tamura, Koji Yamazaki, Kiyotaka Maeda and Kenji Sato
JASIC Japan ______ 62nd GRSP Session December 2017
Measures of Central Tendency & Range
Thermal analysis Friction brakes are required to transform large amounts of kinetic energy into heat over very short time periods and in the process they.
JASIC Japan ______ 61st GRSP Session May 2017
Heavy Duty Vehicle Requirements in EVS-GTR for HFCV-GTR Discussions
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-012
Draft Dyno requirements for GTR (proposal broadly as per CFR § )
Input on wind tunnel criteria discussions
Tianjin Motorcycle Technical Center
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-077
Using Baseline Data in Quality Problem Solving
Status report of Evap Task Force
WLTP-DTP-LabProcICE-229
Motorola Solutions Internal Information
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 1/2/2019.
01 General requirements Road load matrix family vehicle definition 02 Annex 4 Wind tunnel for road load matrix family 03 Annex 6 CO2 interpolation range.
WLTP Validation2 for RLD ~ Validation test plan by Japan ~
Instrument PDR Summary of Objectives
The Analysis of Fire Test for the High Pressure Composite Cylinder
For ASME VIII-I vessels, Hydraulic test pressure is
Brian Somerday Sandia National Laboratories Livermore, CA, USA
Tianjin Motorcycle Technical Center
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 February 5, 2015.
WLTP-E-Lab Sub Group Progress report WLTP-DTP-E-LabProc-028
Title : Alternative warm-up procedure WLTP rev1e by Japan
Electrified Vehicle Durability
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 8/20/2019.
CLEPA comments on OBD II GTR 18 Draft
GTR Corrections, Open Points, Expert Proposals and Confirmations in GTR 15 8/13/2019.
UNECE WLTP COP task-Force Revision on testing Frequency
SGS-4-05 Current Status of Discussion on New Standards for High-Pressure Hydrogen Containers in Japan Japan Automobile Standards Internationalization.
Presentation transcript:

Proposal on Drafting Hydrogen Storage System Part of the HFCV-gtr SGS 7 – 09 Proposal on Drafting Hydrogen Storage System Part of the HFCV-gtr 21 SEP, 2009 JASIC

JASIC propose to change the 5.1.2.2.1 Proposal for the 5.1.2.2.1 Verification Test for Performance Durability (sequential hydraulic tests) JASIC propose to change the 5.1.2.2.1 1)Hydraulic Cycle Sequential Test (5,500cy) with extreme temperature condition 2) Add static pressure test of 1000hr and 85C. 5.1.1 Material Requirements 5.1.2.1 Verification Tests for Baseline Metrics 5.1.2.2 Performance Test Requirements for New Systems 5.1.2.3 Performance Test Requirements for Criteria-Qualified Systems 5.1.2.2.1 Verification Test for Performance Durability (sequential hydraulic tests) 5.1.2.3.2 Expected Service and Durability Performance Test 5.1.2.2.2 Verification Test for Expected On-road Performance (sequential pneumatic tests) 5.1.2.3.3 Permeation Test 2

vehicle lifetime range Proposal for the 5.1.2.2.1 Verification Test for Performance Durability (sequential hydraulic tests) /JASIC propose to change the 5.1.2.2.1 / JASIC think hydraulic test(5,500cy) with extreme temperature and static pressure test of 1000hr and 85C is appropriate to validate the safety at end of life(15 years, extreme vehicle range). /JASIC think the purpose of pneumatic cycle test (500cy) is not to validate the end of life safety. /Pneumatic cycle test(100,000mile=500cycle) is appropriate to validate the fails which could not be validated by hydraulic test. A:extreme vehicle range(360,000mile、5,500cycle*1) B:average vehicle range(100,000mile、500cycle*2) frequency vehicle lifetime range *1 5,500cycles=360,000mile/200mile×3 safety margin) *2 500cycles=100,000mile/200mile 3

vehicle lifetime range Proposal for the 5.1.2.2.1 Verification Test for Performance Durability (sequential hydraulic tests) /JASIC propose to change the 5.1.2.2.1 SGS-6-1 draft proposal comment 5.1.2.2.1 Hydraulic Cycle Sequential Test (5,500cy) -ambient temperature 1)Hydraulic Cycle Sequential Test (5,500cy) -extreme temperature 2) Add static pressure test of 1000hr and 85C. Hydraulic test(5,500cy) with extreme temperature and static pressure test of 1000hr and 85C is appropriate to validate the safety at end of life(15 years, extreme vehicle range). A:extreme vehicle range(360,000mile、5,500cycle*1) B:average vehicle range(100,000mile、500cycle*2) frequency vehicle lifetime range *1 5,500cycles=360,000mile/200mile×3 safety margin) *2 500cycles=100,000mile/200mile 4

Durability Confirmation Test (hydraulic) Proposal for the 5.1.2.2.1 Verification Test for Performance Durability (sequential hydraulic tests) detailed condition should be discussed 180%NWP (30 sec) 150% NWP 10 cy 150%NWP 5.2.2.1.4 time burst 5.2.2.1.5 Residual Strength 125%NWP <20% 5.2.2.2.2 5.2.2.2.1 150% NWP Proof Pressure 5.2.3.1 Pressure  48hr 25%cy -40oC,80%NWP 25%cy +85oC, 125%NWP 50%cy Ambient temp 125% NWP 1000 hrs +85oC 80%NWP 80% NWP Durability Confirmation Test (hydraulic) Flaws & Chem Drop

Durability Confirmation Test (hydraulic) Proposal for the 5.1.2.2.1 Verification Test for Performance Durability (sequential hydraulic tests) As a result, 5.1.2.2.1 Verification Test for Performance Durability is same as 5.1.2.3.2 Expected Service and Durability Performance Test. 5.1.2.2 Performance Test Requirements for New Systems 5.1.2.3 Performance Test Requirements for Criteria-Qualified Systems 5.1.2.2.1 Verification Test for Performance Durability (sequential hydraulic tests) 5.1.2.3.2 Expected Service and Durability Performance Test (sequential hydraulic tests) 5.1.2.2.2 Verification Test for Expected On-road Performance (sequential pneumatic tests) 5.1.2.3.3 Permeation Test 180%NWP (30 sec) 150% NWP 10 cy 150%NWP 5.2.2.1.4 time burst 5.2.2.1.5 Residual Strength 125%NWP <20% 5.2.2.2.2 5.2.2.2.1 150% NWP Proof Pressure 5.2.3.1 Pressure  48hr 25%cy -40oC,80%NWP 25%cy +85oC, 125%NWP 50%cy Ambient temp 125% NWP 1000 hrs +85oC 80%NWP 80% NWP Durability Confirmation Test (hydraulic) Flaws & Chem Drop 6

Proposal to add Maximum Defect Size Inspection Test(New paragraph) /JASIC propose to add Maximum Defect Size Inspection Test in Design Qualification Test because the pneumatic cycle test(5,500cy) is impossible for too long test period. This test is same as NGV(ANCI/CSA) /The maximum defect size shall be calculated which does not lead to any damage from fatigue or burst during the use of the container for a period of 15 years in hydrogen atmosphere.

Comment for 5.1.2.1.2 (Ambient cycling test in design qualification test) Failure mode of 150%NWP PCL may be different from 125%NWP PCL .(JASIC will comfirm these data and introduce you.) 5.1.2.1.2 Baseline Pressure Cycle Life (Leak Before Break) Test. At least 3 new storage containers will undergo ambient hydraulic pressure cycling from <2MPa to 150%NWP without rupture for 11,000 cycles (2 times the number of cycles required for 5.1.2.2.1.4) or until leak occurs. The pressure cycle life, PCL, of a storage container is the number of cycles until leak. If no leak occurs, then PCL is equated to 11,000. All 3 storage containers must have a pressure cycle life, PCL, within 25% of PCL0. PCL0, the average of the measured PCLs, is the baseline pressure cycle life for 5.1.3.2.

END