Sandbagging Techniques
Bridge over BNSF Railroad 7 km East of Windham - East Bridge Replacement Project Using Accelerated Bridge Construction.
Chapter 34 Bridge Construction.
DEPARTMENT OF PUBLIC WORKS BUREAU OF ENGINEERING & CONSTRUCTION STRUCTURAL DESIGN SECTION REPLACEMENT OF BRIDGE NO. B-0427 ON DAIRY ROAD OVER OWL BRANCH.
1 FEMA Flood Insurance Rate Map Update FEMA Public Meeting October 22, 2009.
Reconstruction of the Eads Bridge Highway Deck
Using HECRAS TO Evaluate Scour At Bridges County of Orange Presented to the Flood Division August 13, 2001 by Nadeem Majaj.
Breaching the Mahar Regional School Dam Presentation to Ralph C. Mahar Regional School Committee GZA GeoEnvironmental, Inc. February 9, 2011.
4 TH STREET BRIDGE Pueblo, Colorado December 2006 Project Overview.
Public Information Meeting Rehabilitation of Bridge No Flat Rock Hill Road over I-95 Old Lyme, Connecticut Rehabilitation of Bridge No Flat.
Floodplains and your Treatment Plant How Hurricane Katrina Is Changing Your Floodplain in Michigan Daniel Schechter, P.E. Greeley and Hansen 1.
ASFPM – May 24, 2012 CASE STUDY – 408 PERMITTING AND LEVEE ACCREDITATION FOR WATERLOO, NEBRASKA ASFPM MAY 24, 2012 Presented by Randy Behm, PE, CFM Lalit.
Bridge Building Timelines Presented by The Richland County Engineers Office Thomas E. Beck, PE, PS 77 North Mulberry Street Mansfield, Ohio Jan.
Enosburg BRO 1448(40) Bridge 48 on TH 2 Over the Tyler Branch Alternatives Presentation.
Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.
Tips and Tricks On Writing a Good SWMP / Drainage / Hydraulic Report. Presented by Doug Gates David Evans and Associates, Inc. ODOT Geo/Environmental Conference.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Bridge Engineering (5) Substructure – Abutments and Piers
October 8, 2008 Spokane, WA Doug Walters, P.E. King County DOT
Fluvial Criteria in the FAHP. “ All permanent stream crossing replacements must provide for a fully functional floodplain”
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Welcome to Oregon’s Programmatic ESA.
Beaver Dam Wash Bridge Project Introduction Nick Hont, P.E. Mohave County Flood Control District Engineer.
1 Implementing the Concepts Environment Pre-Conference Workshop TRB MPOs Present and Future Conference August 27, 2006 Michael Culp FHWA Office of Project.
Channel Rehabilitation Projects TAMWG - June ‘04 Trinity River at Hocker Flat 1/16/2003.
Basic Hydraulics: Bridges. Definition & terminology Abutments Flow contraction.
Oregon Department of Transportation Stormwater Management Initiative: Meeting New Challenges Presented by: William Fletcher, ODOT February 5, 2008.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
Three Rivers Levee Improvement Authority February 26, 2007 Presentation to the State Reclamation Board Subcommittee Proposed Feather River Setback Levee.
US Army Corps of Engineers BUILDING STRONG ® Rock Arch Rapids Fish Passage Cape Fear River Lock and Dam No.1 Bladen County, NC US Army Corps of Engineers.
US Army Corps of Engineers BUILDING STRONG ® Lisa Mangione Regulatory Division Los Angeles District January 14, 2016 USACE Regulatory Program Emergency.
Engineers and bridges. Just the facts The four main factors are used in describing a bridge. By combining these terms one may give a general description.
Design Project #1 Replacement of Vehicle Bridge over Spring Creek Centre County, PA Introduction to Engineering Design EDGSN 100 Section 001 Team Armadillo.
Santa Barbara County LCP Amendment 1-09-A and –B Land Use and Development Code (LUDC) & Rezone Th17 b & c.
Brookeville Bypass Final Design Presentation Initech May 6, 2004.
ODOT Programmatic ESA Consultation on the Federal-Aid Highway Program (FAHP) User’s Guide Training, June-July 2013 Early Coordination This required step.
DESIGN AND CONSTRUCTION GUIDELINES
EPA Region 7 Lead Remediation Byrnes Mill Dam and Park
Bridge disasters.
Anthony Alvarado, PE, CFM National Hydraulic Engineering Conference
TOTAL BRIDGE REPLACEMENT OF M-13 OVER CHEBOYGANING CREEK
Lions, Tigers, Coast Guard Permits – Oh My!
Posting Bridges for Specialized Single-Unit Trucks
Replacement of Vehicle Bridge over Spring Creek
Environmental Compliance & Bridge Maintenance
Ladd Creek Fish Passage Project
Programmatic Agreements
Innovative Designs for the 2013 Colorado Flood Damage
Interaction between Riprap Layout and Contraction Scour from Vertical-Wall Bridge Abutments Supported by Shallow Foundations presented by Huang, C., Xie,
Fluvial Criteria in the FAHP
Little Rapids Habitat Restoration St
INTEGRAL BRIDGES Guided by: Dipu.V.S Lecturer Civil Engg Dept
INDOT Culvert Sizing Policy
New Bridge Construction
Blatnik Bridge Management Study
a design technique for achieving fish passage
May, 1999 Bridges This module will cover bridges and how they are input into HEC-RAS. 9/21/2018.
Identifying Barriers to Fish Passage in Mason County
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
11/20/2018 Culverts Culverts are the same as bridges as far as locating cross sections 11/20/2018.
Bridges.
OKLAHOMA’S STATE FLOODPLAIN
I-85 Widening Project MM Cherokee County Public Hearing March 14, 2017.
Replacement of Vehicle Bridge over Spring Creek
HEC-RAS US Army Corps of Engineers Hydrologic Engineering Center
Monterey County Project Report for Measure X Expenditures
Replacement of Vehicle Bridge over Spring Creek
Ron Hancock, PE NCDOT State Construction Engineer
Presentation transcript:

2016 FHWA National Hydraulic Engineers Conference Portland, OR August 9-12, 2016 Hydraulic Design Considerations of a Bridge Crossing a Levee Edward Foltyn, P.E., Sr. Hydraulic Engineer, ODOT Bridge Engineering Section David McDonald, P.E., Hydraulic Engineer, Region 1, Oregon DOT

Background The existing bridge is a single-span through-truss. It is historic because of the welded truss The existing bridge is functionally obsolete and is scour critical. Also, there is damage to some of the truss members from vehicular accidents. The roadway has poor alignment for the agricultural and truck traffic to-and-from a quarry. This bridge is at the downstream end of a USACE constructed levee system. ODOT was asked to design and permit a bridge crossing for Umatilla County. ODOT was asked to design and permit a bridge crossing the Walla Walla River in Milton-Freewater, OR near the Oregon-Washington border for Umatilla County. The existing bridge is a single-span through truss. It is historic as it is the only welded truss in the State. The bridge is functionally obsolete and is being replaced for roadway widening and better alignment. The bridge has been damaged from trucks (agricultural and quarry) hitting the superstructure This bridge is at the downstream end of a USACE constructed levee system. This levee was constructed by the USACE n the 1940s, refurbished in the last few years. It is currently maintained by the Milton-Freewater Water District

Typical Bridge Hydraulic Considerations Flooding Issues No-Rise Certification Balanced cut/fill below 100-yr flooding Fish Passage Issues Federal Aid Highway Program (FAHP) Programmatic with NOAA NMFS (anadromous species, OR - NMFS) “…procedures and tools for implementing the Federal Highway Administration (FHWA) statewide programmatic Endangered Species Act (ESA) Section 7 consultation and Magnuson Stevens Act (MSA) consultation with the National Marine Fisheries Service (NMFS) and the U.S. Fish and Wildlife Service (USFWS). “

Fish Passage (cont.) Scour Issues Oregon Department of Fish & Wildlife Local populations and In Water Work Window (IWWW) Scour Issues Long term aggradation/degradation Both occur in this reach (degradation D/S of exiting bridge, aggradation near the proposed bridge). The abutments for the existing bridge are a choke point Contraction Scour Pier scour No piers Abutment Scour Existing bridge is experiencing abutment scour, settlement has occurred

Levee and Bridge Considerations Could not find much clear-cut information about bridge construction within a levee (large multispan structures generally stay outside of levee) Limited information about levee encroachment (mostly stay out) FHWA could not provide any information USACE “policies” were to stay away from the landside slope toe, but not written in stone

Primary criteria for new design Roadway alignment needs improvement for agricultural and trucks from quarry Single span for fish passage, debris, and to eliminate pier scour issues Had to meet USACE levee criteria Low chord needs to be above the top of the levee Any excavation/disturbance is supposed to be behind the landside slope toe

Normal Design at a Levee This would have required a span of 250’ or so

Analysis and Design We obtained a recent FEMA FIS HEC-RAS deck (2010 update of FIS; 100-yr flow 11,000 cfs, 500-yr flow 22,700 cfs) Modified HEC-RAS data deck to incorporate USACE design flow of 18,600 cfs The Modified data deck overtopped the levee at the location of the new bridge before the bridge was modeled.

Analysis and Design (cont.) Contacted USACE, Walla Walla District. They modified the deck The new alignment for the roadway and bridge leads to a significantly longer span Wanted to maintain a single span bridge to minimize fish passage, debris, and permitting issues

Current Design at Levee

Preliminary Design Existing Bridge Proposed Bridge Structure Type Through Truss (not much structure below deck level), historic because of the welded truss configuration Steel Girder (deep girder below deck level ~8’) Span length 112’, perpendicular 190’, with the skew Spans Single Span Abutments/foundation Concrete structure as downstream end of levee Pile foundation constructed in the levee Roadwork in the vicinity of the bridge Poor roadway alignment Reconstructed several thousand feet of roadway to improve alignment and raise roadway 10’

Conceptual Plan

Current Status and Issues This is a County owned structure and will remain so Currently the project is delayed for R.W. issues There are still issues with the existing bridge. It is historic, but the county wants it removed The existing abutments are the downstream anchor for the levee system. When the existing bridge is removed, who is responsible for the maintenance and likely replacement of this portion of the levee? USACE Review for Milton-Freewater Water District Final plans due late winter/spring 2017

Conclusions When working near a levee, determine the “standards” early in the project In our case, the levee standards were more strict than any other criteria that we normally use, this stream will never see the effect of a bridge unless the levee fails