SPS EYETS 2016/2017 Planning meeting (No.17) 01/03/17

Slides:



Advertisements
Similar presentations
Commissioning the access system M. Gruwé Machine checkout workshop November 8 th 2007.
Advertisements

IEFC Workshop 2011 David Mcfarlane Superintendent for SPS EN/MEF/ABA 1.
MKE4 Rearrangement -Updated Drawings -Visit to ECA4 -Visit to LSS4 -SPS Safety File -Safety during intervention MKE4 Rearrangement - TCM 25 August
Barriere O, Le Roux P
Injector De-cabling Project Project Team Meeting #
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
LHC-YETS Coordination meeting #9 24 th November, 2015.
SPS YETS 2015/2016 Planning meeting for BE-BI 09/12/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Injector De-cabling Project Project meeting # 7, S. EVRARD, EN-MEF, on behalf of the Injector De-cabling Project Team.
SPS YETS 2015/2016 Planning meeting (No.3) 07/10/15 David Mcfarlane EN-MEF D.Mcfarlane1.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
Activities related to BE-BI during LHC-YETS 7 th December, 2015 Maria Barberan, Marzia Bernardini.
PSB HW Commissioning Meeting 8 February 2016 A. Akroh, B. Mikulec.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
LS1 Day: The Injectors S. Baird EN/MEF Thanks to R Brown, N Gilbert, D McFarlane & V Chohan, IEFC workshop…. LS1 Day: The Injectors 1.
Electrial Safety LS2 days November 2016 AP
Magnet activities in SPS during EYETS
LIU and TE/VSC activities LIU-SPS aC coating & flange impedance reduction Paul Cruikshank LIU & TE/VSC activities, 23/6/2016 Paul Cruikshank.
LIU and TE/VSC activities Status September 2016 LIU-SPS aC coating & flange impedance reduction Paul Cruikshank on behalf of TE-VSC LIU & TE-VSC, 19/9/2016.
SPS LS2 Planning meeting (No.6) 19/07/17
YETS & LS2 Works EN-EL / Power distribution
SPS Personnel Protection System Renovation Project
SPS YETS 2017/2018 Planning meeting (No.1) 13/09/17
SPS EYETS 2016/2017 Planning meeting (No.4) 12/10/16
Linac4-PSB 160 MeV connection readiness review
Safety in the Neutrino Platform Hall
SPS LS1 Planning meeting (N019) 04/09/13
SPS Winter stop Planning meeting (N06) 05/01/2011
BE-ICS Activities during the LS2 Period (15 min)
TE-MSC activities in SPS during LS2
SPS EYETS 2016/2017 Planning meeting (No.16) 22/02/17
SPS YETS 2017/2018 Planning meeting (No.2) 27/09/17
Injector De-cabling Project
Activités SPS pour BE/ICS Systèmes d’Alarmes YETS
LIU – EVM status and next steps
SPS - EYETS 2016/17 Vacuum systems planning
SHORT LHC-TS Coordination meeting #1
BE-ICS activities for LIU Project
LIU–PLI report LIU SPS meeting.
LHC-TS3 Coordination meeting #3
SPS EYETS 2016/2017 Planning meeting (No.11) 18/01/17
SPS YETS 2015/2016 Planning meeting (No.14) 03/02/16
PS Booster Hardware Tests & Cold Check-out planning 16th of March 2017
EN-HE SPS works during EYETS
LHC Civil Engineering Activities for YETS – LS2
SPS EN-CV Planning LS (initial draft)
High Radiation to Materials 16th Project Team Meeting – May 20, 2010
SPS Planning for the EYETS Meeting 8 (07/12/2016)
SPS Planning for the EYETS Meeting 9 (14/12/2016)
SPS LS1 Planning meeting (No.34) 16/04/14
EYETS 2016/2017 Activities SPS Access system Maintenance and Evolutions Access system EYETS 2016/2017 EDMS:
SPS East Extraction bump inhibit during COLDEX operation
SPS activities during LS2 TE-EPC (Power Converter Group)
Cryogenic Risk Assessment in LHC
GIS PORTAL RACKS Integration of Equipment Racks in the Geographic Information Service (SMB/SE) Olivier Barrière.
LHCb & EYETS
YETS & LS2 Works EN-EL / Power distribution
James Ridewood BE-OP-SPS
TE-MSC activities in SPS during YETS
Linac4-PSB 160 MeV connection readiness review ( TE/VSC )
GIS Portal Racks Project
PS Booster Report from: David HAY, Cyrille BEDEL 12-Jan-2018
Monday 11/07: Recovery Plenty of accesses.
BLM planning 03/03/2014.
Wire almost entirely through beam before BLM triggers dump
LS1 status 17/03/2014.
Experimental Areas – LS2 planning
SPS 1 and 5 during W J.MEIGNAN EN-ACE-OSS 06/03/2019.
Powering and Safety day Underground access during powering tests
SPS Planning meeting for LS2 #26 Vacuum sectors status
Presentation transcript:

SPS EYETS 2016/2017 Planning meeting (No.17) 01/03/17 David Mcfarlane EN-ACE D. Mcfarlane

Extended YETS 2016-2017 Reference time: 3.5 Weeks left of access into the SPS EDMS: 1470895 EN-ACE D. Mcfarlane

Key dates Beam off at 06:00 on Monday the 12th December Access into BA7, TI2, TAG41, TAG42 & TI8: Monday the 12th December until Friday the 24th March 2017. 13 weeks of access. Access into BA3,4,5 & 6: Thursday the 15th December until Friday the 24th March 2017. 12.4 weeks of access. XMAS holidays: Thursday the 22nd December to Wednesday the 4th January inclusive Access into BA1 & BA2: Thursday the 5th January until Friday the 24th March 2017. 11.4 weeks of access. 4 weeks foreseen for EPC tests and cold-checkout by OP. SPS will take beam from the PS on Monday the 24th April 2017, followed by 1 week for beam setup. SPS ready to give beam to the LHC on Monday the 1st May 2017! EN/ACE/OSS BE/OP EN-ACE D. Mcfarlane

SPS Water Availability Location De-min Circuit stop date Primary Water Off De-min Circuit start date Comments BA1 20/12/16 09-13/01/17 27/02/17 (Main Magnet & Power supplies for Kickers) Remaining circuit 13/03/17 BA2 14/12/16 (end) 06-10/02/17 20/02/17 Available for users from 06/03/17 BA3 19/12/16 27/02-03/03/17 (inc BEQ2 & BEQ3) 13/03/17 BB3 16-20/01/17 (except RF Skid) BA4 15/12/16 (end) 09-13/01/17 (Coldex) 17/02/17 (Main Magnet & Power supplies for Kickers) Remaining circuits 13/03/17 BA5 16/12/16 (end) 16-20/01/17 BA6 14/12/16(end) 16/12/16 – 16/01/17 (SF1) 27/02/17 Available for users from 13/03/17 BA7 12/12/17 EN-ACE D. Mcfarlane

EN-NC-CV-2017-057 - PREVESSIN - Distribution Eau Déminéralisée - Le 02 EN-NC-CV-2017-057 - PREVESSIN - Distribution Eau Déminéralisée - Le 02.03.17 de 12h30 à 17h Veuillez prendre connaissance de la note de coupure : PREVESSIN - DISTRIBUTION EAU DEMINERALISEE Installation d'un compteur ED Prévue le jeudi 2 mars de 12h30 à 17h https://edms.cern.ch/document/1761637/1 EN-ACE D. Mcfarlane

Lift & Monte-charge Maintenance February & March EN-ACE D. Mcfarlane

Access restrictions to areas of the SPS Zone Dates of restricted access Comments TI2 (LHC side) 10th February to 13th March LHC cool down in sector 1-2 TT20 6th March onwards EPC tests in TT20 TAG41/TAG42 24th February to 12th April Laser tests in the AWAKE area TI8/TJ8 Access via TAG41,42 will be affected. Access via TT40 ok. EN-ACE D. Mcfarlane

Change of access mode in TAG41 On 24/2 PM, Vitor/Didier will perform the maintenance of the access system and put the TAG41 area in key access. From this moment on, and until 24/3 the following applies:   Keys will only be given and people will only be allowed to enter during working hours and on working days (Mon-Fri, 8h-18h). No more than 24 persons can be in TAG41 at the same time. To obtain a key and access TAG41, the intervener does  NOT use the intercom, but phones the CCC (SPS) directly on 70475. As the intercom still connects to the CSA (guards), the CSA guard on duty will be asked to respond to any call with the request to the intervener to phone the CCC. Signs will be put up at the turnstile with the same message. To open the material door, the same applies: phone directly the CCC. There is no on-call service for the access team or the CCC-SPS and their availability during working hours is on a best-effort basis. This means that any issue with access or laser mode occurs late afternoon (for example, when a door is forced and laser test mode is lost), the issue will only be dealt with the next day. There will be a patrol by the CCC (plus laser expert) on 28/2 PM. If a patrol needs to be redone at a later stage, it can be performed by the laser expert as was the case last year. The laser permit, currently in circulation, will need to be signed before the area can be put in laser test mode, ideally on 1/3. From 24/3, the entire SPS complex will move to key access mode, meaning all TAG41 intercom calls will be transferred automatically to the CCC, who will be available Mon-Fri 7h-20h. From 21/4 on, the SPS complex (including AWAKE) will have a 24h 7 days a week CCC support. EN-ACE D. Mcfarlane

Test AUG/ Access Tests (Access will be blocked) Location AUG test Access tests Global test access safety system SPS Auto Transfer Test 4th & 5th February 16th December (15:00 to 17:00) 23rd March (chain 1) 24th March (Chain 2,3,4,5) BA1 13th February 27th January (PM) BA2 15th February 23rd January (PM) BA3 16th February 24th January (AM) BA4 ECX4 TAG42 TAG41 28th February 24th January (PM) 25th January (AM) 25th January (PM) 3rd February (PM) BA5 ECX5/ECA5 1st March 26th January (AM) 26th January (PM) BA6 20th January 27th January (AM) BA7 TT61 10th January 23rd January (AM) 30th January (AM) BA80 4th April 3rd February (AM) 13th March (1 day) “Test interverrouillage ventilation”

Barriers blocking access Veuillez prendre connaissance de la note de coupure :   PREVESSIN - DISTRIBUTION EAU DEMINERALISEE Installation d'un compteur ED Prévue le jeudi 2 mars de 12h30 à 17h https://edms.cern.ch/document/1761637/1 Example EN-ACE D. Mcfarlane

ENNC2017-046 - ELECTRICITE - SPS - ZONE 15 - BA5 - BB5 - le 01. 03 ENNC2017-046 - ELECTRICITE - SPS - ZONE 15 - BA5 - BB5 - le 01.03.2017 de 7h00 à 20h00 Veuillez prendre connaissance de la note de coupure "ELECTRICITE - SPS - ZONE 15 – BA5 – BB5 - Réseaux Stable, Pulsé et Onduleur - Tests annuels des arrêts d'urgence généraux (AUG)" prévue le mercredi 1er mars 2017 de 7h00 à 20h00   https://edms.cern.ch/ui/file/1758751/1/ENNC_EL_2017_046_AUG_BA5_BB5.pdf EN-ACE D. Mcfarlane

ENNC2017-039-V2 - ELECTRICITE - PREVESSIN - ZONE 10 - 04. 03 ENNC2017-039-V2 - ELECTRICITE - PREVESSIN - ZONE 10 - 04.03.2017 de 7h00 à 20h00 Veuillez prendre connaissance de la note de coupure modifiée "ELECTRICITE - PREVESSIN - ZONE 10 - BAT. 867, 864 – 865 (blocs 1 & 2), 866 – 892 (blocs 3 & 4), 904, 927, 926, 933, 880, 881, 939 - Réseaux Normal, Secours et Onduleurs - Tests annuels des Arrêts d'Urgence Généraux (AUG)" prévue le samedi 4 mars 2017 de 7h00 à 20h00 (au lieu du 18.02.17 suite à la demande de plusieurs utilisateurs du bât. 867)   https://edms.cern.ch/ui/file/1753727/2/ENNC_EL_2017_039_V2_AUG_PREVESSIN_ZONE_10.pdf EN-ACE D. Mcfarlane

Consignations It is the responsibility of the Equipment owner to consign any equipment that they will be working on. Please ensure that The coordination team has a copy of all main consignations of the SPS. Do not assume something is consigned. Check first. EN-ACE D. Mcfarlane

All people who must enter in ECA5 will access by BA5. Access into ECA5 While the shielding wall separating ECX5 and ECA5 is removed: All people who must enter in ECA5 will access by BA5. 12th December until 15th March. In order to keep the patrol and the integrity of the area safe, the lift in ECA5 should not be used during this period, only for evacuation. By accessing through BA5, we can guarantee that people are registered and they have their SPS safety courses. A security panel with a chain will be installed at the bottom of the lift : "Do not use the lift, only for evacuation" by the TSO (Franck Bais) If one of the 3 ECA5 doors at the top of the cavern is forced, the CSA will re-arm it at the end of the day. EN-ACE D. Mcfarlane

SPS cleaning campaign There will be a 3 week cleaning campaign in the SPS tunnel starting on the last week of February. The current schedule is as follows: Wk.1 (27th Feb to 3rd March)  BA3 and then BA4 Wk.2 (6th March to 10th March) BA2 and then BA1 Wk.3 (13th March to 17th March) BA5 and then BA6   This will leave the final week as a back-up. EN-ACE D. Mcfarlane

Removal of the TIDVG3 7th of February 2017

Réinstallation aimants coating SPS Demi-cellule Slot / position Code TREC/MTF Equipement stockés b.867 Equipement stockés sur place Installation aimant prévue 505 QD.50510 SPQM___FWP-00000129 Quadrupole principal   Done MDV.50507 + BPV.50508 + drift BPM + correcteur + chambre à vide drift 02-Mar 507 QD.50710 SPQM___FWP-00000157 LOD.50702 SPLODN_FWP-01000019 Octupole MDV.50707 + BPV.50708 + drift 420 LSF.42005 SPLSFN_FWP-01000039 Sextupole 07-Mar MDH.42007 + BPH.42008 BPM + correcteur 422 LOF.42202 + drift SPLOFN_FWP-01000027 + CR-047452 Octupole + chambre à vide drift 06-Mar MDH.42207 + BPH.42208 424 GNA.42401 (incl. LSEN.42402 + LSF.42405) CR-047456 (incl. SPLSEN_FWP-01000002 + SPLSFN_FWP-01000051) Poutre SSS avec 2 sextupoles MDH.42407 + BPH.42408 426 LOF.42602 SPLOFN_FWP-01000016 03-Mar LSF.42605 SPLSFN_FWP-01000034 MDH.42607 + BPH.42608 428 LOF.42802 + drift SPLOFN_FWP-01000035 + CR-047453 MDH.42807 + BPH.42808 430 MDH.43007 + BPH.43008 + drift 432 LSF.43205 + drift SPLSFN_FWP-01000008 + CR-047454 Sextupole + chambre à vide drift 01-Mar MDH.43207 + BPH.43208 434 MDH.43407 + BPH.43408 + drift 500 LSF.50005 + drift SPLSFN_FWP-01000047 + CR-047455 MDH.43407 + BPH.43408 EN-ACE D. Mcfarlane

IMPACT Statistics (EYETS-SPS-2016/2017) Number of IMPACTS “Waiting for Approval” Last week:28 Today:22 Number of IMPACTS “Approved” Last week:31 Today:29 Number of IMPACTS “In Progress” Last week:141 Today:145 Number of IMPACTs “Late” Last week:115 Today:120 Number of IMPACTs “Closed” or Finished” Last week:208 Today:228 Total Number of IMPACTs Last week:523 Today:544 EN-ACE D. Mcfarlane

Please fill out your IMPACTs correctly!!!!! Correct intervention period: DO NOT LEAVE IT BLANK!!!!!!! (EYETS-SPS-2016/2017) Do not leave proposed schedule Blank!!!! I am not psychic!!! If you clone an IMPACT: Check you have the correct responsible person!! Check the dates are correct Check the location is correct Check the description is correct (not just the title) Basically, CHECK EVERYTHING!!!! If you have already completed your IMPACT them please check that the dates in IMPACT match that of your planning and are also correct in the master schedule planning. If they are not then please contact me so that we can rectify the problem. WHEN YOU HAVE COMPLETED YOU WORKS DO NOT FORGET TO CLOSE YOUR IMPACT!!!!!!! EN-ACE D. Mcfarlane

Don’t forget to add Vacuum to your IMPACT if you need them.   Supervisor: Chiara Pasquino e-group: te-vsc-ivm-LS1 40-30: Alain Grimaud 40-30: Frederic Vial 40-30: Lindsay Morgan Fabre 40-30: Olivier Pangolin EN-ACE D. Mcfarlane

PLANNING EN-ACE D. Mcfarlane

SRRs and ECRs for the SPS SPS planning and coordination meeting for EYETS 2016/2017 SRRs and ECRs for the SPS Sonia Bartolomé Jiménez EN-ACE-CL – 8th February 2017

SRRs and ECRs: reminder All changes to the machine that will impact the beam shall be documented by SRRs/ECRs: SRR: Space Reservation Request (“light ECR”) ECR: Engineering Change Request Templates available on: https://quality.web.cern.ch/templates-requests To be sent to the SPS configuration manager: Sonia.Bartolome@cern.ch or ecr-configuration@cern.ch Sonia Bartolomé Jiménez EN-ACE-CL – 8th February 2017

SPS ECRs for EYETS 2016/2017: status LIU-SPS project EDMS Number Title Doc type EDMS Status Authors SPS-BCTW-EC-0001 SRR: New Fast BCT for SPS LSS5 (EYETS 2016-2017) SRR Accepted (ECR) Lars Soby (BE/BI) SPS-V-EC-0005 Modification of the SPS sectorization in long vacuum sectors (arcs) ECR Chiara Pasquino (TE/VSC) SPS-VF-EC-0001 SPS flange impedance reduction in EYETS 2016-2017 Jaime Perez Espinos (TE/VSC) SPS-BCTW-EC-0002 BCTW for LSS5 of the SPS ring (EYETS 2016-2017) SPS-VC-EC-0001 SPS amorphous carbon coating in EYETS 2016-2017 Mattias Van Gompel (TE/VSC) SPS-JHCAA-EC-0001 Construction of concrete support structure for new LIU beam dump in SPS ECX5 Approval Accepted Richard Morton (SMB/SE) SPS-BLMD-EC-0001 Installation of a Beam Loss Diamond Detector in SPS LSS1 during EYETS 2016-2107 Lars Jensen (BE/BI) No Change SPS-JHCAA-EC-0001 and SPS-BLMD-EC-0001 approved at the 192nd IEFC meeting. Released version 1.0 being prepared. Sonia Bartolomé Jiménez EN-ACE-CL – 8th February 2017

Sonia Bartolomé Jiménez EN-ACE-CL – 8th February 2017 SPS ECRs for EYETS 2016/2017: status Non LIU-SPS project EDMS Number Title Doc type EDMS Status Authors SPS-LJ-EC-0004 Installation of a crab-cavity cryomodule and related infrastructure in LSS6 SRR Accepted (ECR) Giovanna Vandoni (BE/RF) ACC-RFB-EC-0001 New Table Format for Function Generator/Controllers (FGC) ECR Quentin King (TE/EPC) SPS-BSHV-EC-0002 Removal of the scraper BSHV.51659 from LSS5 of the SPS Edouard Grenier-Boley (EN/STI) SPS-LJ-EC-0006 HL-LHC Crab-cavity infrastructure in SPS: tunnel areas (EYETS 2016-2017) SPS-TIDVG-EC-0001 Modifications to the TIDVG during 2016 Paula Rios Rodriguez (EN/STI) SPS-HJP-EC-0002 Installation of a protective barrier for SPS sectors 430 and 431 ground supports Roberto Salemme (TE/VSC) SPS-Y-EC-0001 Radiation monitor interlocks at the SPS Markus Widorski (HSE/RP) SPS-BLM-EC-0001 Pilot installation of Beam Loss Monitors along the COLDEX experiment SPS-B-EC-0004 Removal of obsolete BI equipment in LSS4 of the SPS Approval Accepted Enrico Bravin (BE/BI) SPS-QRWPU-EC-0001 Installation of two Helium 2K Pumping Units in LSS6 SPS (BA6) Under Approval Giovanna Vandoni (BE/RF) No Change New ECR (SPS-QRWPU-EC-0001) Under Approval describing the installation of two helium 2K pumping units and other equipment in BA6. Approval deadline: 17-02-2017 Sonia Bartolomé Jiménez EN-ACE-CL – 8th February 2017

External Visitors If you have any external personnel needing to access the SPS for visits before starting works then you need to read the following document: "Etapes à suivre pour organiser des visites professionnelles dans les installations faisceaux" by CHRISTELLE GAIGNANT Link: https://edms.cern.ch/document/1281098/2.5/TAB3 EN-ACE D. Mcfarlane

Access rights and safety equipment EVERYONE who enters the SPS MUST have the following: Completed the correct courses. (sir.cern.ch) CERN Safety Introduction. Electrical Safety Awareness. (19 choices) Self Rescue Mask Training. (4 choices) CERN – Beam Facilities. SPS – Machine. The correct access authorisation (via EDH). CHECK YOUR ACCESS RIGHTS HAVE NOT EXPIRED!!!! Zone Code “SPS” for access into the SPS Zone Code “NA_TARG” for access into BA80 Zone Code “TAG41 - AWAKE (ex-CNGS) (TAG41)” for access into the old CNGS areas Zone Code “SPS-KN-000” for “Autorisation conduite RTL” Zone Code “SPS-KN-001” for “SPS Shutdown Padlock” (only used during Long Shutdowns) Safety shoes. Biocell. Electronic dosimetre. Passive dosimetre. (All contractors must have an additional company passive dosimetre!!) Helmet plus Light. A valid approved IMPACT. (with their name included on this IMPACT) They must know the number of this IMPACT. Please note that personnel are not allowed to work in the tunnel alone!! EN-ACE D. Mcfarlane

Important Contacts Useful Contact Numbers SPS Coordination Team David MCFARLANE- 164247 Franck BAIS – 165467 Aurelio Berjillos BARRANCO - 167850 Control Room SPS CCC – 77500 (70475 to access TAG41) TI CCC – 72201 CSA - 62511 RP Christophe Tromel – 163199 Angelito Herve – 163168 Nadine Conan (BA1) – 160641 Kurt Weiss (BA7) -160759 EROS Engineering Referent for Operational Safety Emmanuel Paulat – 163870 John Etheridge - 164647 EN-ACE D. Mcfarlane

Round Table (1) Group Contact Persons Comments EN/EL EN/CV EN/STI Guillaume Gros Denis Ribiollet Jeremy Blanc EN/CV Bill Bannister (Water) Vivien Koutcheroff (Ventilation) EN/STI Jerome Lendaro Simone Montesano TE/MSC Jeremie Bauche Pascal Catherine TE/EPC Karsten Kahle (High power) Gilles Le Godec (Medium power) TE/VSC Jose A. Ferreira Anthony Harrison Chiara Pasquino TE/ABT Francesco Castronuovo (Kickers) Gael Bellotto Cedric Baud (Septas) BE/RF Eric Montesinos Christophe Renaud Gino Cipolla BE/BI Raymond Veness Morad Hamani BE/CO Magnus Bjork IT/CS Maryse Da Costa EN-ACE D. Mcfarlane

Round Table (2) Group Contact Persons Comments BE/ICS HSE/RP EN/ACE Didier Vaxelaire (Access) Denis Raffourt (Fire detection) HSE/RP Christophe Tromel Angelito Herve EN/ACE Patrick Bestmann (Survey) Sonia Bartolomé (Integration) Fred Galleazzi (Intergration) Emmanuel Paulat (Safety) EN/HE Patrick Vallet (Transport) Nicolas Perez (Lifts) BE/OP James Ridewood Stephane Cettour Cave SMB/SE Alejandro Martinez Selles Crab Cavity Giovanna Vandoni EN-ACE D. Mcfarlane

A.O.B. EN-ACE D. Mcfarlane

Useful websites Link to SPS planning meetings on INDICO https://indico.cern.ch/category/8122/ Link to the SPS planning https://pwa.cern.ch/Projects-Accelerator-Complex-Schedules/Projects.aspx https://edms.cern.ch/document/1736834/1 Roadmap: Schedule beyond LS1 http://ls1ls2.web.cern.ch/ Next meeting 08/03/2017 30-7-010 EN-ACE D. Mcfarlane

EN-ACE D. Mcfarlane