Corrective Action Plans – Mod 13

Slides:



Advertisements
Similar presentations
Preparation of the Self-Study and Documentation
Advertisements

Roadmap for Sourcing Decision Review Board (DRB)
OVERVIEW OF ClASS METHODS and ACTIVITIES. Session Objectives By the end of the session, participants will be able to: Describe ClASS team composition.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name,
The decision box represents key management decisions and serve as the GATES which delineate phases. The decision can be to proceed, exit, or recycle. More.
Service Agency Accreditation Recognizing Quality Educational Service Agencies Mike Bugenski
How to write a Report On Assessment Source: AUN Secretariat.
[ENTITY NAME] [FUNCTION CERTIFYING] Certification Review for [RELATED ENTITIES] [LOCATION] – [DATES OF ON-SITE VISIT] [Presenter Name, Title] Closing Presentation.
Procurement Engineering and Review Team (PERT) PEER REVIEW PROGRAM Patrick Marmo 2/7/2012 Independent Peer Review Program for Contractor’s Purchasing Systems.
Verification Visit by the Office of Special Education Programs (OSEP) September 27-29, 2010.
Readiness Review Course November Nov Readiness Review Course Introduction – Mod 1.
Commission on Teacher Credentialing Inspire, Educate, and Protect the Students of California Commission on Teacher Credentialing 1 Accreditation Overview.
Unit 5:Elements of A Viable COOP Capability (cont.)  Define and explain the terms tests, training, and exercises (TT&E)  Explain the importance of a.
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO] [ENTITY NAME] [FUNCTION CERTIFYING] Certification Review for [RELATED ENTITIES] [LOCATION] – [DATES OF ON-SITE.
Nov Readiness Review Course Implementation Plan - Mod 8 Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification.
ISO 9001: 2000 Certified Audit Process What to do.
INTRODUCTION TO AUDITING
IAEA International Atomic Energy Agency. IAEA Outline USNRC IRRS Training - Preparations of Reviewers2 Learning Objectives To start with Advance Reference.
© 2012 Cengage Learning. All Rights Reserved. This edition is intended for use outside of the U.S. only, with content that may be different from the U.S.
 Definition of a quality Audit  Types of audit  Qualifications of quality auditors  The audit process.
Compliance Monitoring and Enforcement Audit Program - The Audit Process.
Commission on Teacher Credentialing Ensuring Educator Excellence 1 Program Assessment Technical Assistance Meetings December 2009.
TOTAL QUALITY MANAGEMENT
Corrective Action Programs. 2 HSEEP Homeland Security Exercise and Evaluation Program Provides a common exercise policy and program guidance that constitutes.
HCIS 410 Read, Lead, Succeed/Uophelpdotcom For more course tutorials visit
March 23, SPECIAL EDUCATION ACCOUNTABILITY REVIEWS.
CIS 170 MART Teaching Effectively/cis170mart.com FOR MORE CLASSES VISIT HCIS 410 AID Inspiring Minds/hcis410aid.com FOR MORE CLASSES.
HCIS 410 AID Experience Tradition /hcis410aid.com
Preparation of the Self-Study and Documentation
Cynthia Holcomb Education Specialist
Incident Reporting And Investigation Program
The Readiness Review Process – Mod 2
NIEP Evaluation PO&A “How-to” Guide and Issue Classification
The ORR/RA and the Authorization Basis May 2005 Revision
Conduct of the Review May 2005 Revision
Readiness Review Course
Document Evaluation Process May 2005 Revision
Readiness Review Course
VPM City’s Perspective
ORR Team Leader May 2005 Revision
Readiness Review Course
The ORR/RA Pre-Visit and Other Prior Planning Items May 2005 Revision
Documenting the Review May 2005 Revision
Flooding Walkdown Guidance
Lesson 4 Systems Engineering Plan Exercise Team #
Overview of the FEPAC Accreditation Process
BSA 376 Competitive Success/snaptutorial.com
HCIS 410 Education for Service-- snaptutorial.com.
Version 0.1Assessment Method Overview - 1 Process Assessment Method An objective model-independent method to assess the capability of an organization to.
HCIS 410 ASSIST Lessons in Excellence- - hcis410assist.com.
BSA 376 Education for Service/snaptutorial.com
HCIS 410 PAPER Lessons in Excellence - - hcis410paper.com.
HCIS 410 ASSIST Education for Service- -hcis410assist.com.
HCIS 410 Teaching Effectively-- snaptutorial.com.
HCIS 410 Education for Service-- tutorialrank.com
BSA 376 Teaching Effectively-- snaptutorial.com
Faculty Evaluation Plan
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
BASIC IRRS TRAINING Lecture 14
[ENTITY NAME] [FUNCTION CERTIFYING] Certification Review
Commission maritime security inspections: Preparing for inspections
[INSERT APPLICABLE REGIONAL ENTITY NAME/LOGO]
ROADMAP TO ISO/TS REGISTRATION
How did we do it? Case examples from AIC
Standard Operating Procedures and Termination Procedures
BASIC IRRS TRAINING Lecture 14
Chapter 3: Project Integration Management
Fort Valley State University
Roles and Responsibilities of the tutor
Presentation transcript:

Corrective Action Plans – Mod 13 Readiness Review Course Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule) Startup Notification Report Prepared and Submitted AA Approves SNR and Nominates DOE Team Leader (TL) Readiness Review Process Begins Contractor Plan of Action (CPOA) Prepared DOE Plan of Action (POA) Prepared by DOE Line Mgr AA Reviews and Approves CPOA and POA Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL DOE RR IP approved by TL Prerequisites met (MSA) Contractors RR and Final Report Corrective Action Plan (CAP) Submitted and Approved Prestart Findings Closed Contractor Issues Readiness to Proceed (RTP) DOE Endorsement of RTP and MSA AA Authorizes Start of RR to RR TL DOE RR and Final Report CAP Submitted and Approved AA Authorizes Startup DOE TL Pre-Assessment Preparation and Planning (Team Selected Pre-Site Visit, IP Drafted) Initial Team Mtg Corrective Action Plans – Mod 13 Nov 2006

Readiness Review Process Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule) Startup Notification Report Prepared and Submitted AA Approves SNR and Nominates DOE Team Leader (TL) Readiness Review Process Begins Contractor Plan of Action (CPOA) Prepared DOE Plan of Action (POA) Prepared by DOE Line Mgr AA Reviews and Approves CPOA and POA Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL DOE RR IP approved by TL Prerequisites met (MSA) Contractors RR and Final Report Corrective Action Plan (CAP) Submitted and Approved Prestart Findings Closed Contractor Issues Readiness to Proceed (RTP) DOE Endorsement of RTP and MSA AA Authorizes Start of RR to RR TL DOE RR and Final Report CAP Submitted and Approved AA Authorizes Startup DOE TL Pre-Assessment Preparation and Planning (Team Selected Initial Team Mtg Pre-Site Visit, IP Drafted) 6 Months Prior to RR 1 Year Prior to RR Generally 2 weeks Nov 2006 Mod 13

Learning Objectives Discuss actions following ORR/RA. Describe the purpose, timing, and content of a Corrective Action Plan (CAP). Describe the ORR process and Team Members relate to the Corrective Action Plan. Describe the finding closure process. Nov 2006

Post ORR Activities Line management responsible for resolution of results . . . Thoughtfully evaluate the entire ORR Report: Review forms in detail; Issues or observations identified in the forms require management attention, even if not identified as findings; Some opportunities for improvement may not be listed as findings; Analyze the summary, conclusions, and lessons learned. Debrief counterparts, they should have details beyond the report. The ORR/RA cost a lot, get full value from the effort Nov 2006 Mod 13

Attributes of Corrective Action Plans (CAP) CAPs Required for each finding . . . ORR Standard (3006-00), Section 5.7.2 . . . Describe the Finding; Overall Programmatic Deficiency/Root Cause; Proposed Actions to Correct Deficiency; Timeline for Actions; Compensatory Measures if Needed! Nov 2006 Mod 13

Contractor ORR/RA Corrective Action Plans Completion of Contractor Corrective Action Plan is a prerequisite to the DOE/NNSA ORR/RA. Closure of Contractor ORR/RA items: Ensure the plan is implemented; Verify adequate closure process; Ensure Evidence for Closure. Items scheduled for closure past commencement of operations: Is the delay of closure appropriate/safe? ORR/RA Standard contains sample closure forms. Nov 2006 Mod 13

Closing Contractor ORR/RA (CORR/CRA) Findings Consider: critically reviewed by DOE/NNSA ORR/RA; CAP must contain ALL elements; CAP must consider programmatic deficiency / root causes; Evidence files must be adequate; Management should review closure evidence. DOE/NNSA ORR/RA Team will evaluate response to entire CORR/CRA report Nov 2006 Mod 13

DOE/NNSA ORR/RA Closure ORR/RA report may recommend who in line management should verify closure of findings. Closure verification and approval to start operations is line management’s responsibility. Corrective Action Plans and Closure Packages Required, including Findings Against DOE/NNSA. CAP approval by DOE/NNSA required: After the review, the ORR/RA Team Members may be called upon by line management to clarify Findings or to review corrective action plans . . . Nov 2006 Mod 13

Questions Nov 2006 23

Corrective Action Plans – Mod 13 Readiness Review Course Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule) Startup Notification Report Prepared and Submitted AA Approves SNR and Nominates DOE Team Leader (TL) Readiness Review Process Begins Contractor Plan of Action (CPOA) Prepared DOE Plan of Action (POA) Prepared by DOE Line Mgr AA Reviews and Approves CPOA and POA Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL DOE RR IP approved by TL Prerequisites met (MSA) Contractors RR and Final Report Corrective Action Plan (CAP) Submitted and Approved Prestart Findings Closed Contractor Issues Readiness to Proceed (RTP) DOE Endorsement of RTP and MSA AA Authorizes Start of RR to RR TL DOE RR and Final Report CAP Submitted and Approved AA Authorizes Startup DOE TL Pre-Assessment Preparation and Planning (Team Selected Pre-Site Visit, IP Drafted) Initial Team Mtg Corrective Action Plans – Mod 13 Nov 2006

Readiness Review Process Screening or Scoping Meeting (ORR vs RA, Authorization Authority (AA) Defined, Startup Notification Report (SNR) Discussed, Schedule) Startup Notification Report Prepared and Submitted AA Approves SNR and Nominates DOE Team Leader (TL) Readiness Review Process Begins Contractor Plan of Action (CPOA) Prepared DOE Plan of Action (POA) Prepared by DOE Line Mgr AA Reviews and Approves CPOA and POA Contractor RR Implementation Plan (IP) prepared by Contractor RR Team and approved by CTL DOE RR IP approved by TL Prerequisites met (MSA) Contractors RR and Final Report Corrective Action Plan (CAP) Submitted and Approved Prestart Findings Closed Contractor Issues Readiness to Proceed (RTP) DOE Endorsement of RTP and MSA AA Authorizes Start of RR to RR TL DOE RR and Final Report CAP Submitted and Approved AA Authorizes Startup DOE TL Pre-Assessment Preparation and Planning (Team Selected Initial Team Mtg Pre-Site Visit, IP Drafted) 6 Months Prior to RR 1 Year Prior to RR Generally 2 weeks Nov 2006 Mod 13

Learning Objectives Discuss actions following ORR/RA. Describe the purpose, timing, and content of a Corrective Action Plan (CAP). Describe the ORR process and Team Members relate to the Corrective Action Plan. Describe the finding closure process. Nov 2006

Post ORR Activities Line management responsible for resolution of results . . . Thoughtfully evaluate the entire ORR Report: Review forms in detail; Issues or observations identified in the forms require management attention, even if not identified as findings; Some opportunities for improvement may not be listed as findings; Analyze the summary, conclusions, and lessons learned. Debrief counterparts, they should have details beyond the report. The ORR/RA cost a lot, get full value from the effort Nov 2006 Mod 13

Attributes of Corrective Action Plans (CAP) CAPs Required for each finding . . . ORR Standard (3006-00), Section 5.7.2 . . . Describe the Finding; Overall Programmatic Deficiency/Root Cause; Proposed Actions to Correct Deficiency; Timeline for Actions; Compensatory Measures if Needed! Nov 2006 Mod 13

Contractor ORR/RA Corrective Action Plans Completion of Contractor Corrective Action Plan is a prerequisite to the DOE/NNSA ORR/RA. Closure of Contractor ORR/RA items: Ensure the plan is implemented; Verify adequate closure process; Ensure Evidence for Closure. Items scheduled for closure past commencement of operations: Is the delay of closure appropriate/safe? ORR/RA Standard contains sample closure forms. Nov 2006 Mod 13

Closing Contractor ORR/RA (CORR/CRA) Findings Consider: critically reviewed by DOE/NNSA ORR/RA; CAP must contain ALL elements; CAP must consider programmatic deficiency / root causes; Evidence files must be adequate; Management should review closure evidence. DOE/NNSA ORR/RA Team will evaluate response to entire CORR/CRA report Nov 2006 Mod 13

DOE/NNSA ORR/RA Closure ORR/RA report may recommend who in line management should verify closure of findings. Closure verification and approval to start operations is line management’s responsibility. Corrective Action Plans and Closure Packages Required, including Findings Against DOE/NNSA. CAP approval by DOE/NNSA required: After the review, the ORR/RA Team Members may be called upon by line management to clarify Findings or to review corrective action plans . . . Nov 2006 Mod 13

Questions Nov 2006 23