Preliminary considerations on the strip readout chip for SVT

Slides:



Advertisements
Similar presentations
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
Advertisements

The Belle SVD Trigger  Tom Ziegler  Vertex 2002  Kailua-Kona, Hawaii, 4-8 th nov The Belle SVD Trigger Tom Ziegler on behalf of the Belle SVD.
Comments to the AGS pC polarimeter data processing t 0 based calibration Observations of Boris Morozov’s results Dead layer corrections. A novel method.
L1 Pixel Trigger: Is 20 us Latency Achievable? David Christian Fermilab April 29, 2015.
S.Veneziano – INFN Roma July 2003 TDAQ week CMA LVL1 Barrel status ATLAS TDAQ week July 2003.
Electronics/DAQ for SVD2+SVD3 KEK, 17 Nov 2004 Manfred Pernicka, HEPHY Vienna We want to investigate penguins!
VC Feb 2010Slide 1 EMR Construction Status o General Design o Electronics o Cosmics test Jean-Sebastien Graulich, Geneva.
Start Counter Collaboration Meeting September 2004 W. Boeglin FIU.
NA62 Trigger Algorithm Trigger and DAQ meeting, 8th September 2011 Cristiano Santoni Mauro Piccini (INFN – Sezione di Perugia) NA62 collaboration meeting,
P. Baron CEA IRFU/SEDI/LDEFACTAR Meeting Santiago de Compostela March 11, A review of AFTER+ chip Its expected requirements At this time, AFTER+
Hit rate at high luminosity logical channels - ghosts – efficiency Toy Monte Carlo : # I have assumed a uniform particle distribution inside the TS # I.
Vertex 2005, Nikko Manfred Pernicka, HEPHY Vienna 1.
Spatiotemporal Saliency Map of a Video Sequence in FPGA hardware David Boland Acknowledgements: Professor Peter Cheung Mr Yang Liu.
Jefferson Laboratory Hall A SuperBigBite Spectrometer Data Acquisition System Alexandre Camsonne APS DNP 2013 October 24 th 2013 Hall A Jefferson Laboratory.
REQUIREMENTS FOR A NEW PIXEL CHIP L. Demaria - Torino INFN Lino Demaria - New Pixel Chip - Torino 01/06/2011.
SPIROC update Felix Sefkow Most slides from Ludovic Raux HCAL main meeting April 18, 2007.
STAR J/  Trigger in dA Manuel Calderon for the Heavy-Flavor Group Trigger Workshop at BNL October 21, 2002.
The SLHC CMS L1 Pixel Trigger & Detector Layout Wu, Jinyuan Fermilab April 2006.
Eleuterio SpiritiILC Vertex Workshop, April On pixel sparsification architecture in 130nm STM technology ILC Vertex Workshop April 2008 Villa.
Trigger Matrix Shiuan-Hal. Trigger (“times 4”) μ xhodoscopexhodoscope yhodoscopeyhodoscope discriminatorlevel shifter level 1 v1495 level 2 v1495 trigger.
Status Report of the SVT external layers Lorenzo Vitale University and INFN Trieste.
Alessandro Gabrielli - SLAC - 15/02/081 Alessandro Gabrielli Physics Dep. & INFN Bologna -APSEL4D readout architecture -APSEL256x256D proposal -Emulator-Debugger.
SVT detector Electronics Status Overview: - SVT design status - F.E. chips - Electronic design - Hit rates and data volumes - Required ETD inputs Mauro.
NOISE MEASUREMENTS ON CLICPIX AND FUTURE DEVELOPMENTS Pierpaolo Valerio.
Status of SVT front-end electronics M. Citterio on behalf of INFN and University of Milan XVII SuperB Workshop and Kick Off Meeting: ETD3 Parallel Session.
Pixel structure in Timepix2 : practical limitations June 15, Vladimir Gromov NIKHEF, Amsterdam, the Netherlands.
GGT-Electronics System design Alexander Kluge CERN-PH/ED April 3, 2006.
SuperB-DCH S ervizio E lettronico L aboratori F rascati 1LNF-SuperB Workshop – September 2010G. Felici DCH FEE STATUS Some ideas for Level 1 Triggered.
The design of fast analog channels for the readout of strip detectors in the inner layers of the SuperB SVT 1 INFN Sezione di Pavia I Pavia, Italy.
ETD/Online Summary D. Breton, U. Marconi, S. Luitz Frascati Workshop 04/2011.
G. RizzoMarch, TS resolution needed in L0 striplets Assume want to have a cut of 50 ns on offline time window (  t) to keep the occupancy
Some thoughs about trigger/DAQ … Dominique Breton (C.Beigbeder, G.Dubois-Felsmann, S.Luitz) SuperB meeting – La Biodola – June 2008.
Update on analog design for L4-L5
DAQ ACQUISITION FOR THE dE/dX DETECTOR
Updates on the R&D for the SVT Front End Readout chips
Valerio Re Università di Bergamo and INFN, Pavia, Italy
Valerio Re INFN Pavia and University of Bergamo
DCH FEE STATUS Level 1 Triggered Data Flow FEE Implementation &
Front-end Electronic for a neutrino telescope : a new ASIC SCOTT
Frontend Electronic Update
ETD meeting First estimation of the number of links
APSEL6D Architecture, simulations and results
Digital readout architecture for Velopix
INFN Pavia and University of Bergamo
Iwaki System Readout Board User’s Guide
PID meeting SCATS Status on front end design
Christophe Beigbeder PID meeting
AFE II Status First board under test!!.
L. Ratti, M. Manghisoni Università degli Studi di Pavia INFN Pavia
Some basic ideas (not a solution)
Noise analysis of the 1m3 DHCal test beam
Muon Recording Studies and Progress for the MICE Tracker
Dominique Breton, Jihane Maalmi
SVT detector electronics
Alberto A. Colavita, INFN, TS
SVT detector electronics
Analog Front-end electronics for the outer layers of the SuperB SVT: design and expected performances Luca Bombelli1,2 on behalf of the SVT-SuperB Group.
Backgrounds using v7 Mask in 9 Si Layers at a Muon Higgs Factory
Overview: - Front-end activities - DAQ activities - Test beam analysis
The CMS Tracking Readout and Front End Driver Testing
DC trigger Present DC design Lab tests and implementation.
PID meeting Mechanical implementation Electronics architecture
A new family of pixel detectors for high frame rate X-ray applications Roberto Dinapoli†, Anna Bergamaschi, Beat Henrich, Roland Horisberger, Ian Johnson,
Cache - Optimization.
ETD parallel session March 18th 2010
SVT detector electronics
for the trigger subsystem working group:
On behalf of the CEPC MOST2 Vertex detector design team
Preliminary design of the behavior level model of the chip
LNF PID session 1 December 1st 2009
Presentation transcript:

Preliminary considerations on the strip readout chip for SVT Parameter space Tracking efficiency Peaking time (Buffer lengths) M. Villa – Bologna 15/04/2011

Parameter space SVT as designed: L1-L5 + L0(striplets) Gangling/Occupancy/Simulations Several unknowns: exact background rate; hit multiplicities Trigger frequency: 150 kHz (1.5 S.F) jitter: 100 ns (the goal is to go down to 30 ns) latency: 10 us (1.7 SF; LVL1 design is 6 us) DAQ window: 100ns+2 Time stamps or 300 ns Time stamping: 30 MHz (5-40 MHz) Chip readout clock: 50 MHz (56-112 MHz ?)

Tracking efficiency

What value for the minimum strip efficiency? Main requirement: 98% SVT-only tracking efficiency (L1-L5) Tracking conditions: At least spacepoints on 4 layers (out of 5) Spacepoints in x and y (u and v) 2 hit strip/cluster (1 hit strip/cluster) Doubtfull if inefficiencies on adiacent strips can be considered uncorrelated! Mean hit multiplicity/track usually high (>=2)

Results from simple calculation: εT=98% SVT-only tracking efficiency when: εL=95.3 % efficiency on each layer (and asking at least 4 layers with spacepoints) εSS=97.6 % single side efficiency (single sides are considered uncorrelated) Individual strip efficiency : 97.6 % for 1 hit/cluster 97.6 % for n correlated hit/cluster (pessimistic) 84.7 % for 2 hit/cluster uncorrelated (over-optimistic) 91.2 % guess estimation for 50% sharing or correlation (reasonable/optimistic(?))

A little bit of systematics Tracking efficiency 95.0 % 97.0 % 98.0 % 99.0 % 99.5 % Layer eff (5 layer tracking [l.tr.]) 99.4 % 99.6 % 99.8 % 99.9% Layer eff (>=4 l. tr.) 92.4 % 94.2 % 95.3 % 96.7 % 97.7 % Single side eff (>=4 l.tr.) 96.1 % 97.1 % 97.6 % 98.4 % 98.8 % Strip efficiency 1 hit/cluster or N correlated hits 2 uncorrelated hits/cluster 80.3 % 82.8 % 84.6 % 87.2 % 89.3 % Reasonable (?) mean. 88.2 % 89.9 % 91.1 % 92.8 % 94.1 %

Peaking time

Analog efficiency estimations Assumptions: Strip dead time equal to 2.4 peaking time Strip rates as given by Roberto C. (?): L0: 2060 kHz/strip L1: 268 kHz/strip L2: 179 kHz/strip L3: 52.5 kHz/strip L4: 21.9 kHz/strip L5: 18.7 kHz/strip

Efficiency vs peaking time No safety factor Safety factor of 5 L5 L5 L4 L4 L3 L2 L0 L0 L1 L1 L2 L3 97.6% eff Tp(L1)=190 ns 97.6% eff Tp(L1)=38 ns

A comment on safety factors Stainless steel safety factors used in industries: 3 or above for buildings No problem on additional weight 1.65 for large antennas Additional weight starts to be a problem 1.15 (!!) for plane wings Useless weights keep a plane on the ground Lesson here: complex systems (like SVT) might fail if too large safety factors are used!! Conflicting requirements: Capability to deal efficiently with high rates low Tp Signal separation, dE/dx performances  high Tp By the way: this is not the only place where large safety factors can be problematic

Max Peaking times (ns) at fixed strip efficiency Target strip efficiency 97.6% 95% 91% SF=5 SF=1 L0 5 25 10 52 19 95 L1 38 189 80 399 147 733 L2 57 283 119 597 220 1098 L3 193 964 307 Max 748 L4 462 976 1794 L5 541 1142 Max = what allowed by the 6 us max trigger latency = approx 2 us.

Peaking times for next calculations L0: 25 ns L1-L2-L3: 100 ns L4-L5: 1000 ns

Readout chip for strips ~hit_rate * trig_latency Sparsifier strip #127 FE ADC Or ToT Ctrl logic Buf #k ... Buf #1 strip #0 FE ADC Or ToT Ctrl logic Buf #k ... Buf #1 BUF #1 Triggered hits only readout/slow control First buffering per strip then transfer triggered time stamps Re-use of digital readout logic developed for pixels

First guess on number of buffers required for L0 striplets/L1 strip Assume L0 @ 225 MHz/cm2, L1@5 MHz/cm2 L0 = 2 MHz/strip, L1=270 KHz/strip Just calculations; Mini-MC simulation needed F. Morsani

Layers L2-L3; L4-L5 L2-L3: 100 ns peaking time -> 240 ns dead time; Max 42 hits in 10 us; Efficiency always >= eff on L1 L4-L5: 1 us peaking time -> 2.4 us dead time; Max 5 hits in 10 us; Efficiency 100 % already with 5 buffers

Design choice ahead Coupling of fixed latency part with triggered part: Synchronous: triggered his are transfered in one clock cycle on the second part Fits better with the buffer logic Pixel readout not suitable Asynchronous: triggered hits stay in the buffers till reading (as hit pixels in matrix) Fits perfectly with the pixel readout architecture Hit transferring can be fast: 2-3 clock cycles (but not 1 clock!).

Summary Relation between strip efficiency and track efficiency Peaking time ranges Choices of safety factors Too large in the past? Most of the inefficiency can be kept in the analog part of the chip Reuse of the pixel chip readout architecture possible, but need planning.