Solar Probe Plus FIELDS

Slides:



Advertisements
Similar presentations
GLAST LAT Project Engineering Meeting – ISOC Peer Review 1 Gamma-ray Large Area Space Telescope GLAST Large Area Telescope ISOC Peer Review ISOC Detail.
Advertisements

MAVEN CDR May 23-25, 2011 Particles and Fields Package Pre-Environmental Review May , 2012 Flight Software Peter R. Harvey Mars Atmosphere and Volatile.
GoetzFIELDS iPDR – I&T SPP/FIELDS Integration and Test Preliminary Design Review Keith Goetz University of Minnesota 1.
Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Telecom 1 9/17/2012 SPP/FIELDS Solar Probe Plus FIELDS Monthly Management Telecom Sep 17, 2012.
Solar Probe Plus FIELDS ICU/FSW Peter R. Harvey Dorothy Gordon –ICU Will Rachelson – FSW Dec 1, 2012.
SwRR 4/28/ Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.
IMPRS June Space Research, in praxis, illustrated by a ground-based example The „Ozonometer“ as a student project.
THEMIS-SCM THM – SCM – CDR – 08-April-2004 in Velizy
SPP Spacecraft Emulator (SCE) Introduction
THEMIS SRR Requirement Overview - 1 UCB, 07/08/2003 REQUIREMENT DEVELOPMENT OVERVIEW Ellen R. Taylor Mission Systems Engineer Space Science Laboratory.
GoetzFIELDS iCDR – I&T Solar Probe Plus – FIELDS Integration and Testing Instrument CDR Keith Goetz University of Minnesota 1.
21-1 MAVEN IPSR October 30,31, 2012 Particles and Fields Package Pre-Ship Review October 30,31, : Flight Software Peter R Harvey Mars Atmosphere.
Solar Probe Plus FIELDS Team Meeting Management Items 08/05/2014.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Overview and Status Keith Goetz University of Minnesota.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Solar Probe Plus Fluxgate Magnetometer QSR – Oct SPF MAG Quarterly Report – Oct 2014 The MAG EM1 (EQM) (board and frame at right) was successfully.
Jun 4, SPP FIELDS Updated block diagrams Fault Tolerant Design.
SWT Overview 1 UCB, Nov15/16, 2006 THEMIS SCIENCE WORKING TEAM MEETING Mission Overview Peter R. Harvey Project Manager University of California - Berkeley.
FM1 Instrument Suite Pre-Ship Review (PSR)INT- 1 UCB September 21, 2005 THEMIS FM1 INSTRUMENT SUITE PRE-SHIP REVIEW (PSR) INTEGRATION AND TEST PLANS Jeremy.
Solar Probe Plus FIELDS Fluxgate Magnetometer QSR – June 2015 June 16, SPF MAG Quarterly Report – June 2015 MAG FM1 electronics PCB assembled (see.
June 16, 2015SPP/FIELDS SOC CDR: Integration & Test SPP/FIELDS Integration and Test SOC Critical Design Review Keith Goetz University of Minnesota
Pre-PDR Peer Review 1 UCB MAVEN Particles and Fields Flight Software Peer Review Requirements Definition Peter R. Harvey May 12, 2010.
HarveyFIELDS iCDR – Flight Software Solar Probe Plus FIELDS DCB FSW Requirements Peter Harvey University of California 1.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes 3-4 Sept. 2008EFW INST+SOC PDR447 Command, Telemetry, and Ground Support Equipment (CTG)
Timothy QuinnFIELDS SOC CDR – CTG Solar Probe Plus FIELDS SOC CDR Command, Telemetry, and Ground Support (CTG) Timothy Quinn UCB 1.
Solar Probe Plus FIELDS MAG Peter Harvey. MAG FSW Requirements.
March 28, 2011 MAVEN SWEA instrument Pre-CDR Peer IRAP March 28-29, IRAP Management MAVEN SWEA Instrument Pre-CDR Peer Review IRAP, March.
Solar Probe Plus FIELDS Team Meeting Management 7/07/2015.
Solar Probe Plus FIELDS Instrument PDR Management Peter Harvey, PM Lindsey Hayes, DPM University of California
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 9 EFW Overview and Status Keith Goetz University of Minnesota.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW I-PER 21 January EFW Systems Engineering Michael Ludlam Space Sciences.
SPP FIELDS DFB Quarterly November 21, 2014 Solar Probe Plus FIELDS Instrument Quarterly Digital Fields Board (DFB) 1.
FM4/FM5 IPSRSYS - 1 UCB, May 5, 2006 THEMIS INSTRUMENT SUITE FM4/FM5 PRE-SHIP REVIEW SYSTEM OVERVIEW Ellen Taylor University of California - Berkeley.
20-1 MAVEN iPSR Oct 30-31, 2012 Particles and Fields Package Pre-Ship Review October 30-31, PFDPU D. Gordon, W. Donakowski & PFDPU Team Mars.
1 PFP IPDR 2010/6/ Particles and Fields Package (PFP) Instrument Preliminary Design Review Integration & Test David Curtis, PF Package Manager.
GLAST LAT Project May 25, 2006: Pre-Environmental Test Review Presentation 11 of 12 Thermal Vacuum Test 1 GLAST Large Area Telescope LAT Pre-Shipment Review.
RBSP Radiation Belt Storm Probes RBSP Radiation Belt Storm Probes RBSP/EFW CDR /30-10/1 647 Ground Support Equipment Will Rachelson University of.
BonnellFIELDS iCDR – AEB Solar Probe Plus FIELDS Instrument CDR Antenna Electronics Board AEB J. Bonnell, D. Seitz UC Berkeley, SSL
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
FIELDS MEP Thermal Vacuum Cycling iPER
Solar Probe Plus – FIELDS SCM FM2 Instrument Pre-Ship Review
Solar Probe Plus FIELDS Pre-AGU Science Meeting
Solar Probe Plus – FIELDS Main Electronics Package
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Solar Probe Plus FIELDS V1234 Mechanical Pre-Ship Review May 26, 2017
Solar Probe Plus – FIELDS V1234 PA/Antenna Instrument Pre-Ship Review
Solar Probe Plus FIELDS MEP iPSR SOC Marc Pulupa April 10, 2017
Solar Probe Plus – FIELDS Main Electronics Package
SPF MAG Quarterly Report – Feb 2015
FIELDS Mission Assurance Manager University of California, Berkeley
Solar Probe Plus FIELDS
I&T&C Organization Chart
Keith Goetz University of Minnesota
Solar Probe Plus FIELDS
Solar Probe Plus – FIELDS Main Electronics Package
EIDP Status. Solar Probe Plus FIELDS Main Electronics Package iPSR Management Apr 10, 2017.
FIELDS MEP & V5 Pre-Ship Review Thermal Summary
Agenda. Solar Probe Plus FIELDS Main Electronics Package iPER Agenda Feb 2, 2017.
Solar Probe Plus – FIELDS Main Electronics Package
Solar Probe Plus – FIELDS Verification Instrument mini-PER (V5)
Solar Probe Plus – FIELDS V1234 PA/Antenna
Solar Probe Plus FIELDS V5 Mechanical Pre-Ship Review April 10, 2017
FIELDS SCM Thermal iPER
FIELDS Keith Goetz Solar Probe Plus A NASA Mission to Touch the Sun
Solar Probe Plus FIELDS Main Electronics Package iPER EMC Feb 2, 2017
Solar Probe Plus FIELDS Instrument PSR - MEP Introduction
0.0 Instrument Suite Name Presenter’s name
Acceptance Test Review
Thermal Vacuum Test: Plans and Procedures
Presentation transcript:

Solar Probe Plus FIELDS Team Meeting Management 2/07/2017 Peter R. Harvey (Retired)

Agenda Agenda includes: 1. Science (Bale) 2. Management (Harvey)                 2.  Management (Harvey)                 a. Deliverables                 b. Issues Remaining                 c. Schedule Milestones                 d. ANT PER Review Coming Up 3.  Integration and Test (Brent M)                 a. I&T Schedule 4.  Systems (Goetz)                                                                                              5. Mechanical/Thermal - Bill D., David G., Paul Turin, Gayle M.                 a. MEP (Vibration in progress)                 b. Antennas                 c. Thermal                            6. Electrical Status                 MEP (Waiver[SCM requirement])                 PREAMPS                                 7. Ground Support / Stimulus Rack – Quinn 8. Science Operations - Pulupa                

DELIVERABLES / MEETINGS Items Due from FIELDS: Update the FIELDS specific ICD, completing assigned actions – see latest e-mail from Kris on 1/27/17 Provide CBE updates for the three Mission Cases/Power Cases requested in A. Reiter’s 10/13 email [10/21/16] Perform local SOC-MOC testing – Scheduled now for 2/22/17 V5 PER Action Items MEP PER Action Items Command & Telemetry Definition and Flight Rules  - Baseline version Meetings / Tests: Jan18: Deliveries for Integrated TV Test (ITVT) 3 harnesses, 3 antenna sims Feb 2: MEP PER (working to extend this) Feb TBD 2017: Supporting ITVT at GSFC Feb 22 2017: MOC-SOC local tests

EM/FM ISSUES Source: SPF_MGMT_026_ISSUES.xlsx

EM/FM ISSUES Source: SPF_MGMT_026_ISSUES.xlsx

V5 ACTION ITEMS Source: FIELDS SCM AND V5 PER ACTION ITEMS.xlsx

V5 ACTION ITEMS Source: MEP PER action items concerns and recommendations-draft

MEP PER ACTION ITEMS Source: MEP PER action items concerns and recommendations-draft

MEP PER ACTION ITEMS

Schedule This schedule was developed in concert with Project Management at APL. It is an MEP-centric schedule, aiming to make certain that the MEP is delivered to the S/C Integration on time. To accomplish this, the schedule assumes an environmental configuration using the Flight Model MEP and MAGs, but Engineering Model sensors : V1-V4 preamps, V5 and SCM. We have also abandoned plans to use a local EMC contractor, both to save time and the expense. Thus, our setup/teardown time, etc., is shorter.

JAN 2017VERIFICATION For PER, we need all the functional requirements demonstrated. Everything through I&T and up to Inst. Env. (~ 39 about other things). Included: DCB FM1 MAG SCM LNPS DFB FM2 AEB PREAMPS ANT Included: DCB FSW TDS FSW SOC DCB FM2 L4 ant[7] FIELDS ICD ant[1] Gi ICD other[16] EMECP blnks[6]