Presentation by Sky Stanfield July 28, 2016

Slides:



Advertisements
Similar presentations
Updated 1/28/2011. Technical Requirements & Regulatory Issues In Interconnection Agreements March 9, 2011 Jay Caspary ·
Advertisements

Cost of Services Pricing Enables a Net Zero Energy World © 2011San Diego Gas & Electric Company. All copyright and trademark rights reserved. 1.
California Interconnection 101 An Update on Reform: What’s Happening and Why it is Important March 16, 2011 Sky C. Stanfield
SMALL UTILITY-SCALE RESOURCES (DISTRIBUTED GENERATION) 1.
“The Electric Grid and DG: Operational Considerations”
Energy Storage in California’s Grid of the Future Don Liddell, Douglass & Liddell Co-Founder and General Counsel, California Energy Storage Alliance ​
EStorage First Annual Workshop Arnhem, NL 30, Oct Olivier Teller.
Aidan Tuohy Technical Leader/Project Manager, EPRI ERCOT Emerging Technology Working Group (ETWG) 09/24/2014 Transmission System Considerations for Integrating.
Responses and Suggestions for Distributed Resource Plans Sky C. Stanfield September 17, 2014 CPUC Workshop – R
2001 South First Street Champaign, Illinois (217) Davis Power Consultants Strategic Location of Renewable Generation Based on Grid Reliability.
1 The Effects of Integrating Wind Power on Transmission System Planning, Reliability, and Operations Phase 1 Preliminary Overall Reliability Assessment.
An Overview of Our Regulatory Proposal
Costs of Ancillary Services & Congestion Management Fedor Opadchiy Deputy Chairman of the Board.
The Common Core Curriculum By Dean Berry, Ed. D. Gregg Berry, B.A.
Applying the Distribution System in Grid Restoration/NERC CIP-014 Risk Assessment Srijib Mukherjee, Ph.D., P.E. UC Synergetic.
Common Information Model and EPRI Smart Grid Research
© 2015 Electric Power Research Institute, Inc. All rights reserved. Matthew Rylander EPRI April 20, 2015 Streamlined Method for Determining Distribution.
AEE So Cal September 24, 2015 Integrating Renewables and The Distribution Grid of the Future 1.
SOUTHERN CALIFORNIA EDISON® SM Preferred Resources Pilot August 17, 2015
By Erik Takayesu, PE Director, Electric System Planning Southern California Edison More Than Smart Webinar August 4, 2015 Distribution Resources Plan.
Office of Electricity Delivery & Energy Reliability Consumer Engagement in an Advanced Grid Joseph Paladino NASUCA 2015 Annual Meeting Austin, TX November.
Transforming the Distribution Grid
Long Term Transmission Integration Planning at the California ISO Intermittency Analysis Project (IAP) Energy Commission Staff Workshop February 13, 2007.
2006 Reliability Study James Manning Bryan Guy May 12, 2006.
UM 1751 Energy Storage Workshop #3 May 9, UM 1751 Workshop #3 Topics Most viable and beneficial applications (HB 2193 time frame: ) Emerging.
PG&E’s Distribution Resources Planning READ AND DELETE For best results with this template, use PowerPoint 2003 Planning the “Networked Grid“ Integrated.
MTS Working Group San Francisco F2F Agenda Mar. 23, 2015.
© 2015 Electric Power Research Institute, Inc. All rights reserved. Haresh Kamath Program Manager, EPRI Building California’s Flexible Grid October 27,
Locational Net Benefit Analysis Working Group June 1, am – 3 pm Webinar drpwg.org.
Regulatory Considerations for Deploying Distributed Energy Storage Sky Stanfield, Of Counsel Keyes, Fox & Wiedman LLP July 9, 2015 MA Stakeholder Conference.
Integrated Capacity Analysis Working Group June 1, am – 12 pm CPUC Hearing Room E drpwg.org.
Integrated Capacity Analysis Working Group June 9, am – 12 pm CPUC Golden Gate Hearing Room drpwg.org.
© 2016 Electric Power Research Institute, Inc. All rights reserved. Salvador A. Casente, Jr. Vice President, General Counsel, Chief Compliance Officer.
Renewables IPP frameworks for successful PPAs Dr Muriel Watt Head, Energy Policy & PV.
JU September Stakeholder Engagement Conference Webinar #1
LNBA Subgroup: Avoided Transmission Value
DoD Template for Application of TLCSM and PBL
Time and Locational Value of DER: Methods & Applications
Transmission-Distribution Interface Working Group Meeting
Considerations for a Modern Distribution Grid
Transmission Planning in ERCOT- Overview
Lesson # 9 HP UCMDB 8.0 Essentials
Locational Net Benefit Analysis Working Group
Locational Net Benefit Analysis Working Group
DS3 and Qualifier Trials Update
August ICA Agenda Time Topic 8:00 – 8:15
Market Operations Engagement Group EVSE Working Group – Principles
DSIP – Distribution System Planning
Chapter 16 Participating in Groups and Teams.
Next Generation Distribution System Platform (DSPx)
Integrated Capacity Analysis Working Group
NWA Suitability Criteria
Grid Operations Engagement Group
August LNBA Agenda Time Topic 1:00 – 1:15
Lorenzo Kristov, Ph.D. Principal, Market & Infrastructure Policy
The Transition to a High DER Future
Rick Umoff, SEIA Sean Garren, Vote Solar
Opportunities in the Changing Energy System
Johanna Rothman Start Somewhere Chapter 17
Distribution Systems and Planning Training
EU-IPA12/CS02 Development of the Renewable Energy Sector
Reliability Assessment Committee Reliability Workshop Priorities
12th IEEE PES PowerTech Conference
DMAIC Roadmap DMAIC methodology is central to Six Sigma process improvement projects. Each phase provides a problem solving process where-by specific tools.
Coordinate Operations Standard
Avoided Cost and E3 Calculator Update Workshop
Reliability Assessment Committee Reliability Workshop Priorities
2018 RTEP Report Key Maps, Tables & Figures
ICA Methodology Clarifications ICA Working Group 5/18/2016
California Transportation Electrification Activities
Presentation transcript:

Presentation by Sky Stanfield July 28, 2016 Planning for Full Utilization of Hosting Capacity Analyses New York REV Hosting Capacity Working Group Welcome new title suggestions – I want to use “Ringmaster” but haven’t quite figured out the right frame. Although I have fully embraced the circus theme, I don’t want to sound like we are calling the current proceedings circuses in a negative way Presentation by Sky Stanfield July 28, 2016

Overview Establish Uses for Hosting Capacity Select a Methodology Timeline and Phasing Maps and Data

Uses for Hosting Capacity Analyses Inform the interconnection process Process interconnection applications Inform locational valuation assessments Inform and guide the planning process (i.e. Integrated Distribution Planning) Identify areas where upgrades are needed to expand hosting capacity When we talk about Grid Modernization it is important to remember the huge universe of issues that fall under this tent. Each state has in the center ring a different set of issues, some are choosing to tackle them all together, others are taking more modest, or at least step-by-step approaches to them.

1 2 3 4 5 The 5 Steps of IDP Forecast DG Growth on the Circuit Establish the Hosting Capacity and Allowable Penetration Level Determine Available Capacity on the Distribution Circuit Plan Upgrades and Expedite Interconnection Procedures Based on IDP Publish the Results 1 2 3 4 5

Principles for Methodology Selection Common methodology across state Same/transparent power system criteria* Frequency for updates Data outputs and visual tools Published Verifiable Capable of accomplishing objectives *Separate methodology for networked systems may be necessary

Pros and Cons of Methodologies Simplified (EPRI) Pros Cons Potentially faster to deploy (?) May have accuracy limitations for use in interconnection process Computationally less intensive May not be as accurate for determining locational benefits/costs Lower cost (?) May rely on conservative assumptions Iterative Pros Cons More accurate interconnection results Computationally intense Increased hosting capacity results with fewer conservative assumptions (?) Updates may take longer or be less frequent Increased locational costs/benefits accuracy Longer deployment timeline (?)

Interconnection Needs to be Considered Now Methodology selected will effect the ability to utilize hosting capacity to streamline interconnection Hosting capacity is a critical tool to effectively managing high volumes of applications The lessons from CA and HI clearly demonstrate both the problems and the very do-able solutions Changing course later = more time and $$$

Building a Durable Tool Near term focus on queue congestion from community solar projects REV has a broader vision and ambitions Queue clearing and basic best practices in IC and tariff design can help address current crisis Hosting capacity has significant value for smaller/smarter DER projects that is being overlooked Immediate limitations (3V0) can be overcome, tool has utility for interconnection beyond this first hurdle

Publish Methodology and the Underlying Assumptions Use a transparent methodology that can be shared and assessed publicly Publish the technical criteria utilized in the methodology Demonstrate its application and results across various types of circuits

What is the Timeline? Selection of methodology may impact timeframe for providing certain outputs Desire for immediate results has to be balanced with the costs and timeframes associated with altering methodology later What is the timeline the JU’s envision for getting to full hosting capacity under either methodology?

Stage 1 Maps and Data Current variations: visual format, ease of access and use, granularity, frequency of updates Can Stage 1 maps be improved? Voltage of line Capacity: current, queued and available? Minimum and peak load? Publish explanation of how limitations were identified (seems to vary across the JUs)

SCE Preferred Location Map This set of maps includes the locations of SCE distribution circuits, substations, subtransmission systems, and areas of transmission constraints along with the associated circuit/substation/system voltage, available capacity, and current and queued DG interconnections amounts. SCE Preferred Location Map Purpose: to identify low-cost locations for participants in the Renewable Auction Mechanism (RAM) program (< 20 MW) Current as of 9/4/14 PG&E and SDG&E maps are similar

SCE Preferred Location Map Shows distribution circuits, substations, subtransmission systems, and areas of transmission constraints along with the associated circuit/substation/system voltage, available capacity, and current and queued DG interconnections amounts.

Stage 2 and 3 Maps Maps use common platform and “legend” Information available: Hosting Capacity for multiple DERs Basic information from Stage 1 maps including voltage, capacity in queue, etc. Includes planned upgrades Load curve information

Potential Demo A ICA Map Display DPA and Substation Line Section/Circuit

Stage 2 and 3 Data Downloadable format Specific criteria violations identified Critical to helping projects right size/design Enables creation of additional capacity without traditional upgrades Encourages full utilization of DERs Load shape data Scenarios or other tools for assessing combined DER capability to avoid upgrades

Conclusions NY needs to balance the need for resolution of immediate issues with the need for a tool that has long term utility The vision of hosting capacity uses and functionality will expand over time Adopt a rational approach to phased deployment Ensure that the “outputs” can be used to achieve goals

Contact Information: Sky Stanfield Senior Special Counsel Shute Mihaly & Weinberger, LLP stanfield@smwlaw.com Sara Baldwin Auck IREC’s Regulatory Program Director sarab@irecusa.org www.irecusa.org