YE2 – YE3 distance Manual measurements

Slides:



Advertisements
Similar presentations
R. Lee CMS EMU Alignment: 28 Feb, COCOA Simulation and Study of the EMU Alignment System Robert Lee CMS Endcap Alignment Muon EDR 28 February 2002.
Advertisements

Reflectance Sensor Array: Line sensing Team: Grounded Rachel Kmetz, Matthew Forsyth, Austin Meirick, and Levi Eisel.
Vertex Detector Cooling Bill Cooper Fermilab (Layer 5) (Layer 1) VXD.
1 James N. Bellinger 4-Feb-2009 ME+1 status and Endcap Z James N. Bellinger University of Wisconsin at Madison 4-Feb-2009.
Cristiano Bozza – European Emulsion Scanning Group – Nagoya Jan OPERA brick scanning by the European Scanning System.
Vyacheslav Klyukhin, SINP MSU The CMS Magnetic Field Map Aug 7, RDMSV. Klyukhin, SINP MSU1.
28 February, 2003 STAR Collaboration meeting Status of the dE/dx calibration Yuri Fisyak.
Annual Review Cern -June 13th, 2006 F. Loddo I.N.F.N. Bari RPC Electronics: Technical Trigger Flavio Loddo I.N.F.N. Bari On behalf of the RPC-Trigger group.
Design Discussion of Mechanical / Electrical Interfaces Bill Cooper (Fermilab) (Layer 1) VXD.
CHANTI update F. Ambrosino, T. Capussela, D. Di Filippo, P. Massarotti, M. Mirra, M. Napolitano, L. Roscilli, G. Saracino.
Calibration of Analog Sensors for the Alignment of Muon Chambers in the CMS experiment Marion Ripert, Georgia Karagiorgi, Thomas Moschoutis Dr. L. Caraway,
Integration with LDC & Push-pull impact on LumiCal Wojciech Wierba Institute of Nuclear Physics PAN Cracow, Poland FCAL Workshop, LAL Orsay,
TC Straw man for ATLAS ID for SLHC This layout is a result of the discussions in the GENOA ID upgrade workshop. Aim is to evolve this to include list of.
Alignment Meeting, CERN, Sept 19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field.
H. Katajisto RE EDR 10/10/02 Enclosures for the RPC Link Boards Outline Introduction Periphery General Services Components, materials Manufacture, Assembly.
EMU Meeting, CERN, Sept 18-19, 2006O.Prokofiev 1 EMU Alignment System Analog Data Analysis for ME+1yME+4 Stations Run: Aug 25-28, 2006 Magnetic field up.
Internship final presentation Paula Skrobucha September- October 2015 Cracow University of Technology Paula Skrobucha PH-DT26/10/2015.
A New Inner-Layer Silicon Micro- Strip Detector for D0 Alice Bean for the D0 Collaboration University of Kansas CIPANP Puerto Rico.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
Fork Calibration Barrel Muon Alignment 9 April 2003, Z. Szillási Workshop on "LHC Physics with High-Pt Muons in CMS'‘, Bologna, Italy Page 1 Calibration.
Accuracy of the orbit measurement by KEKB BPM system for the study of ILC damping ring H. Fukuma (KEK) Requirement for the accuracy of BPM data.
The reading is 7.38 mm. The reading is 7.72 mm.
SVD Docks Markus Friedl (HEPHY Vienna) B2GM, 23 July 2012.
Prototype Cryomodule FDR Ken Premo 21 – 22 January 2015 High Power Coupler Design.
Radiation Shutter Re-Purposing Roy Preece STFC RAL 18 th December 2014.
Scorpion is a remote tester specifically designed for testing ASD systems. Scorpion is compatible with the FAAST aspirating smoke detector. It is particularly.
Cables for the RE4 Upscope in CMS
Mock-up and integration status
CMS GEM services: Cooling
Integration and Services RE3/1 and RE4/1
Microwave Motion Activator I (Automatic Door Sensor)
Science Skills Chapter 1.
Integration and Services RE3/1 and RE4/1
New Wire Scanner Calibration Bench Software
Endcap shielding senarios:
Early developments in absolute infrasound sensors
T1 Electronic status Conclusions Electronics Cards:
Mini-drawers, FE-ASIC , Integrator
Additional muon stations for the Upgrade of the Elevator Regions in the ATLAS Muon Spectrometer. Integration issues Denis Diyakov, Alexander Seletskiy,
LumiCal mechanical design, integration with LDC and laser alignment
Chamber Design and Integration RE3/1 and RE4/1
WP02 PRR: Master Oscillator and RF Reference Distribution
Design of the He and HB ODU
HPL DG d=1.4mm/e= mm.
CMS RPC Endcap RE1 Status Report
Image quantization By Student Manar naji. quantization The values obtained by sampling a continuous function usually comprise of an infinite set or.
Integration and IR Hall
CSC Electronics Installation and Commissioning CSCE I&C
MicroE Systems Mercury II™ Family of Encoders
Transfer Line and CSC Rφ Reconstruction
Analysis of Oct. 04 Test Beam RPC Data
Use of Beam Loss Monitor type detectors in CNGS muon station
Section 12.6 – Area and Arclength in Polar Coordinates
Customer Presentation
LARP Phase II Secondary Rotatable Collimator
Tolerances.
University of Wisconsin-Madison
RPC SYSTEM LAYOUT and DIMENSIONS
Introduction to Grasshopper for rhino
Cosmic ray test of RPC for the ATLAS experiment
Inner DET. Integration Inner detector envelope Radial clearances.
Statistical Thinking and Applications
Fitting to the Linear Region of I’/q
TOLERANCES.
SAE Clean Snowmobile Challenge Design Presentation
Service test.
YE+3 Changes YE+3 X4A51 S4F04 Additions for TS ME+4/2/x chambers
Microscan3 Core – Technical Addendum
CSC Electronics Installation and Commissioning CSCE I&C
RE3/1 & RE4/1 Parameter Space Services
Presentation transcript:

YE2 – YE3 distance Manual measurements The expected values obtained from a few manual measurements and drawings have been presented. We were waiting for the discs to close to obtain the values from the IR sensors. The values obtained from the IR sensors were 10 - 40mm out from what had been estimated. Decision to go to a manual measurement at numerous points around periphery of the discs.

Results from IR - sensors * IR sensors was installed in 10th of January 2017 Results will be come later

Results from manual measurements Principle scheme of the manual measurements in the CSC chamber Nuances of the CSC chamber design

Values from IR Calibration in 904. later calibrated with full length cables

Individual calibration curves Required range Resolution better than 1mm. Between the closed discs the values were very stable, oscillating between only 2 bits.

Values obtained from IR sensors in Red 200.8mm 201.8mm 197.8mm 167.1mm 151mm Values obtained from IR sensors in Red

RPC space over the N. Shield Values taken on outer “R” at 3 different locations on both –Z and +Z on 25 April 2017. Discs closed. 178-174mm Mean 176mm 145-145mm 14mm ME3/2 RPC space 176 - 14 = 162mm Drawings = 146mm RE3/2 YE2 YE3 RPC space over the N. Shield 162 – 66 = 96mm Standard RPC 29mm gives 68mm with mounting brackets. Leaving a generous clearance to CSCs of 28mm. Was 88mm from drawings. 668-672mm Mean 670mm

Conclusion The IR measurements are way away from basic drawing values. Manual measurements are reliable both at inner and outer radii ! We appear to have > 10mm more Z space. Now we are confident in our values we go back to IO to come to a common agreement. Already talked with Boki.