Entry Capacity Overrun price calculation

Slides:



Advertisements
Similar presentations
UK Gas Entry Regime – Review of existing Interruptible Arrangements & Potential Reforms for this Winter.
Advertisements

Entry Capacity Substitution Transmission Workstream – 6 th August 2009.
UNC Modification Proposal 0116 Reform of the NTS Offtake Arrangements Transmission Workstream 5 th October 2006.
Operating Margins. 2 Competitive Provision of Operating Margins Change to National Grid Gas’s Transporter Licence which:  Introduced Special Condition.
Entry Capacity Release Methodology Statement Transmission Workstream, 4 th May 2006.
Transfer & Trades Special Transmission Workstream
Transfer & Trades Special Transmission Workstream
Transfers and Trades Transmission Workstream
Discretionary Release of Non Obligated NTS System Entry Capacity Transmission Workstream 1st May 2008.
Entry Capacity Substitution Workshop 2 7 th May 2008 Substitution Example.
Force Majeure - Capacity Transmission Workstream 2 July 2009.
Mod Clarifications Transmission Workstream 6 August 2009.
Optimisation of Entry Capacity Strawman Transmission Workstream 4 th May 2006.
Entry Capacity Substitution Workshop 3 11 th June 2008 Substitution Example.
Entry Capacity Trading Transmission Work Stream, 5 April 2007.
September 2008 QSEC auction - Allocations Transmission Workstream
Fundamental review of entry charging principles UNC Transmission Workstream - 6 th August 2009.
DRSEC Update Transmission Workstream 06 November 2008.
Trades and Transfers Workshop, 6 th November 2007.
Exit Capacity Release Methodology Statement - ExCR Transmission Workstream – 5 th Feb 2009.
Mod Entry Capacity Transfers Transmission Work Stream, 5 April 2007.
Transfers and Trades Special Transmission Workstream
Gemini Release 4 UKLC Update 8 th February Gemini Release 4 – UKL13820  UK Link Committee is requested to approve the following:  Implementation.
Development Modification Proposal: Introduction of an Inter-day Linepack Product Review Group August 2010 Transmission Workstream 07/10/2010.
Transmission Workstream 6 January 2011
Distribution workstream 29th January 2009
Transmission Workstream February 2009
Transmission Workstream, 01 October 2009
Non-approved draft Transmission Workstream, 6th December 2007
Review of UNC Section Q “Emergencies”
UNC Modifications 061 & 062 – An Overview
Transmission Workgroup 4th October 2012
Transmission Workstream 4th July 2007
Transmission Workstream, 6 August
UNC Trader User – Licence obligations
Transmission Workgroup – 1st December 2011
DRSEC Update August 4th 2009.
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
NTS Entry Charging Review Update
0332 – Impact of combining the Entry and Exit Capacity credit processes Chris Shanley.
Development Modification Proposal 0337: Introduction of a Inter-day Linepack Product – OPEN LETTER Review Group August th November 2010.
UNC Modification Proposal “Allocation of Daily NTS Entry Capacity Within-Day” Richard Fairholme.
User Compensation for NEC Storage Curtailment – Draft Proposal
7th July 2011 Transmission Workgroup - Elexon
Transmission Workgroup June 7th 2012
COR1360 NTS Exit Reform (Mod 0195AV) UK-Link Committee 11th June 2009
0350 – Combining the NTS entry capacity and exit capacity credit checks Chris Shanley.
Enhanced information provision and revision of the Gas Balancing Alert for Winter 2009 July 2009.
Transmission Workgroup 6th March 2014
MOD National Grid NTS Initiated Flow Swaps
Simon Trivella –5th May 2011 Transmission Workgroup - Elexon
QSEC auction timetable
Long Term Non Firm Capacity Update
Transmission Workstream – Partial Assignment
Draft Mod: Update of default System Marginal Prices
Transmission Workstream 1st September 2005
UNC Transmission Workstream 7th December 2006
Mod 230: QSEC and AMSEC Timings
Richard Fairholme Transmission Workstream 4th September 2008
Entry Overrun Calculation
Transmission Workstream – 6th July 2005
Modification Proposal 0133 – “Introduction of AMTSEC auction”
Optimisation of Entry Capacity Modification Proposal
Information Provision for Transitional Exit Capacity
IECR Incremental Step Size
Commercial Arrangements For Gas Quality Service – Introduction
Modification 0043 – Limitation on offering for sale unsold capacity
Assignment of NTS Entry Capacity – Work currently being Undertaken
Entry Capacity Transfers - Constrained Period
Transmission Workstream 05 November 2009
Presentation transcript:

Entry Capacity Overrun price calculation Transmission Workstream 5th October 2006

Entry Capacity overrun price calculation Issue identified during the constraint actions taken in July and discussed at September Transmission Workstream; Under certain circumstances the overrun price calculation could allow a User to sell their capacity back to National Grid and continue to flow the associated gas. The overrun price is the average price of the top 25% of offers accepted on the day, multiplied by 1.1 This can be less than the price a User receives for their capacity Potentially extends the constrained period Potential for increasing constraint costs

Overrun Price Calculation Overrun Price 4.71 p/kWh

Entry Capacity overrun price calculation Under certain circumstances it is possible for an overrun price to be zero. If there is no constraint on a day then the overrun price calculation that is most likely to be applied is; 8 * A where A is the highest bid price in relation a capacity bid accepted in any capacity auction for the relevant day If no bids were received for the ASEP concerned; or The ASEP has a zero reserve price and the bids are all allocated at zero; then The overrun price will be zero.

Entry Capacity overrun price calculation Proposed changes; Change the overrun price calculation to the following (8 * A) where A is the highest bid price paid by National Grid NTS in relation to any capacity bid accepted in respect of the Day or the Gas Year in which the Day falls. (1.1 * B) where B is the highest allocated offer price, forward price or option exercise price paid by National Grid NTS in respect of any Entry Capacity Management action taken in respect of the Day. (8 * C), where C is the highest reserve price under any invitation for the Day or Gas Year in which the day falls.

Entry Capacity overrun price calculation National Grid believes this proposal better facilitates the relevant objectives by; reflecting the intention that Users are incentivised to purchase a right to flow gas onto the System; Thereby providing signals to National Grid of the intended use of the system; Removes perverse incentives on Users during constraint actions and provides National Grid with the opportunity to more efficiently manage any potential constraint

Entry Capacity overrun price calculation Way forward Submit Modification Proposal to October Mod Panel Request that the proposal proceeds direct to consultation