Concepts for a Next-Generation VLBA

Slides:



Advertisements
Similar presentations
August 2004Multirate DSP (Part 2/2)1 Multirate DSP Digital Filter Banks Filter Banks and Subband Processing Applications and Advantages Perfect Reconstruction.
Advertisements

Integrated Circuits Design for Applications in Communications Dr. Charles Surya Department of Electronic and Information Engineering DE636  6220
CSIRO. Paul Roberts Digital Receivers SKANZ 2012 Digital Receivers for Radio Astronomy Paul Roberts CSIRO Astronomy and Space Science Engineering Development.
Direct Channel Eye Pattern Correction in High Speed Links By Steve Chacko & Ellis Goldberg Furaxa Inc. The engineering metric for physical communication.
Update on LBA Technical Developments CASS Chris Phillips 11 October 2013.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
VLBA Sensitivity Upgrade Project Status Jon Romney NRAO, Socorro 7 th US VLBI Technical Coordination Meeting Haystack Observatory 2009 November 3–4.
Atacama Large Millimeter/submillimeter Array Expanded Very Large Array Robert C. Byrd Green Bank Telescope Very Long Baseline Array The VLBA Sensitivity.
Eleventh Synthesis Imaging Workshop Socorro, June 10-17, 2008 THE VLBA SENSITIVITY UPGRADE Craig Walker, NRAO.
Correlator Growth Path EVLA Advisory Committee Meeting, March 19-20, 2009 Michael P. Rupen Project Scientist for WIDAR.
Nov 3, 2009 RN - 1 Jet Propulsion Laboratory California Institute of Technology Current Developments for VLBI Data Acquisition Equipment at JPL Robert.
4.3 Multiplexing FDM TDM. Introduction Definition 1. The transmission of information from one or more source to one or more destination over the same.
02/6/ jdr1 Interference in VLBI Observations Jon Romney NRAO, Socorro ===================================== 2002 June 12.
VLBA Implementation of the ROACH Digital Backend Jonathan Romney on behalf of the VLBA Upgrade development team NRAO / Socorro First International VLBI.
03/6/121 Using the VLBA for Spacecraft Navigation Jonathan Romney National Radio Astronomy Observatory VLBA 10 th Anniversary 2003 June 9 – 12.
K-Band Focal Plane Array Project Engineering Overview Matt Morgan National Radio Astronomy Observatory 2/27/2008.
Frazer OwenNSF EVLA Mid-Project Review May 11-12, Transition to EVLA
Rick PerleyEVLA Phase II Definition Meeting Aug 23 – 25, The Expanded Very Large Array Phase II Baseline Plan and Constraints.
Achieving a Quantum Leap in Observation Density Bill Petrachenko, NRCan.
Adaptive radio-frequency resource management for MIMO MC-CDMA on antenna selection Jingxu Han and Mqhele E Dlodlo Department of Electrical Engineering.
Data and Computer Communications 8 th and 9 th Edition by William Stallings Chapter 10 – Circuit Switching and Packet Switching.
Antenna Arrays and Automotive Applications
Data and Computer Communications Digital Data Communications Techniques + Error Control+ Digital Data Communications Techniques + Error Control+Multiplexing.
A Wide-Band VLBI Digital Backend System Alan Whitney Shep Doeleman Brian Fanous Hans Hinteregger Alan Rogers MIT Haystack Observatory 10 Jan 2006 IVS General.
WIDAR Correlator Options and Potential Craig Walker NRAO Socorro U.S. VLBI Technical Coordination Meeting May 14-15, 2007.
2007 / 5 / 141 VLBA Requirements, Plans & Status Jon Romney NRAO, Socorro Second US VLBI Technical Coordination Meeting Socorro 2007 / 5 / 14.
Future LBO Developments
A few illustrations on the Basic Concepts of Nonlinear Control
Serial Communications
RFI Protection Activities in IAA RAS
1.) Acquisition Phase Task:
Digital Receivers for Radio Astronomy
Digital transmission over a fading channel
RFI Protection Activities in IAA RAS
Mark 5 / VLBA Correlator Topics
Preparing a Logic Model and Gantt Chart:
Which telecommunication service is better for you?
EVLA Availability - or - When Can I Use It?
Mini-RF Requirements Overview
EVLA Project Peter Napier
The Development of Broadband VLBI Technologies in SHAO
Haystack Geodesy Program and Technical Development
VLA/VLBA INTEGRATION With appropriate outfitting, the VLA+NMA+VLBA could be one integrated instrument covering all resolutions from arcminutes to well.
Bandwidth vs Frequency (Subsampling Concepts) TIPL 4700
FPGA Implementation of Multicore AES 128/192/256
Chapter 4: Digital Transmission
ISO 9001:2015 Auditor / Registration Decision Lessons Learned
Switching Techniques In large networks there might be multiple paths linking sender and receiver. Information may be switched as it travels through various.
Antennas Topologies Directly connecting two duplexers together can affect each other’s filter characteristic, thereby losing the isolation that is needed.
Pulse Processing Chapter No. 17
J D Romney, W F Brisken, S J Durand
Polarization Calibration
Switching Techniques In large networks there might be multiple paths linking sender and receiver. Information may be switched as it travels through various.
Budget, Schedule, Contingency
EVLA System PDR System Overview
EVLA Advisory Committee Meeting
VLA to EVLA Transition Plan
EVLA Advisory Committee Meeting
Gustaaf van Moorsel September 9, 2003
VLBA Correlator Interfaces for VSOP-2
UNIBOARD : VLBI APPLICATION CHARACTERIZATION
Progress on EXPreS at JBO Ralph Spencer
VHT in Below 6 GHz Frequency Bands
VHT in Below 6 GHz Frequency Bands
ECE 352 Digital System Fundamentals
Consideration on 320MHz Bandwidth and 16 Spatial Streams
Correlator Growth Path
EVLA Construction Status
EVLA Advisory Panel Mtg. System Overview
Consideration on 320MHz Bandwidth and 16 Spatial Streams
Presentation transcript:

Concepts for a Next-Generation VLBA J D Romney, W F Brisken, S J Durand

6th IVTW -- Bologna Jonathan Romney VLBA: Major Historical Points Inaugurated August 1993. Transition to Mark 5A disk-based recording (2005-07). “VLBA Upgrade” — only large-scale instrumentation project: Proposed 1999 / funded 2007 (AUI & NSF). Digital IF & channelization system / Mark 5C recorder / DiFX correlator. Design goal “4Gbps by 2011” ~ met Available funding limited implementation to 2 Gbps. Partially complete 2010 / Nearly complete 2012. New / upgraded receivers: 80-96 GHz* (2000) / 21-24 GHz* (2007-08) / 4-8 GHz (2011-12). * Made possible by substantial contributions from MPIfR. 2017/10/11 6th IVTW -- Bologna Jonathan Romney

6th IVTW -- Bologna Jonathan Romney More Recent Astro-Political Events NSF “Portfolio Review” (2011-12) recommended “divestment” of VLBA. As of 2016/10/1, 50% of prior NSF funding is now provided by USNO. Up to 50% of observing time available for USNO use; currently not all used. Despite reduced funding for general astronomical VLBI … New arrangements can break through limitations of sole NSF/NRAO funding. Similar, related overall instrumental requirements can benefit all parties. However, new arrangements also complicate new implementations. New funding partners' interests likely to focus on specific elements of the overall data matched to their requirements Separate, asynchronous implementations may be necessary. Temporary over-design may be necessary at some points. Adherence to established standards will help maintain overall structure. Standards selected to support maximum capabilities required by all involved. Source for date in “As of” statement:: NRAO eNews, volume 9, issue 8, 2016/9/15. 2017/10/11 6th IVTW -- Bologna Jonathan Romney

6th IVTW -- Bologna Jonathan Romney New Receivers Receivers are expensive! … especially for a 10-station array. Most of VLBA’s current suite (except for recent 4-8 GHz system) were built with 1980s technology. New wider-bandwidth designs are available from the recent EVLA upgrade, and even newer, wider concepts are being planned for the ngVLA proposal. Ka- and X-band systems have high priorities: Ka-band 26-40 GHz considered optimal for high-precision astrometry, advocated by some partners for maintaining and upgrading the ICRF. X-band 8-12 GHz would immediately match data-transmission bandwidth proposed below. Modern wideband designs generally process linear polarization. … primarily to fit into multi-band cryostat by eliminating large phase shifter required for conversion to circular. But not necessarily an issue anyway; see earlier talk by Marti-Vidal. 2017/10/11 6th IVTW -- Bologna Jonathan Romney

6th IVTW -- Bologna Jonathan Romney New IF System Proposed new system would replace IF conversion in individual receivers by a single fixed block up/down converter to 8-12 GHz. Output filtering would provide IF ranges 512-1024, 1024-2048, possibly 2048-4096 GHz Would reduce cost of all new receivers after the first. 2017/10/11 6th IVTW -- Bologna Jonathan Romney

6th IVTW -- Bologna Jonathan Romney Sampler / Channelizer / Requantizer Subsystems Dashed-line box includes two different logical functions. Samplers extract digital samples, with desired number of bits, at rate appropriate to entire bandwidth of incoming analog IF. Channelizers extract multiple digital streams, in desired frequency subsets of specific sample streams, requantized as necessary. Either function, or both, may be implemented near the receiver in the antenna, or in the control/instrumentation building. Location chosen causes differing impacts on the final digital signals. Incorporation of interference from digital hardware into final signals. Introduction of unknown delay offsets in long transmission line. Choice of processing locations seems to depend on what techniques are well understood by the implementing organization. NRAO/LBO have achieved adequate RFI shielding at reasonable cost, but are dubious about stable delays in long analog signal transmission lines. Others are dubious about RFI shielding, but have had successful experience with RF-over-fiber transmission over long fibers. Decision may depend on scope of processing available in easily obtainable units. 2017/10/11 6th IVTW -- Bologna Jonathan Romney

6th IVTW -- Bologna Jonathan Romney Mark 6 Recording System Chosen for this block as “shovel-ready” wideband recorder. Not clear what bandwidth is actually supportable. Specs say supports up to 16 Mbps. Some colleagues say unreliable beyond 8 Mbps. Others say works well at 32 Mbps. We have actually started procurement of a large- (but not full-) scale Mark 6 system; major project review occurring tomorrow! 2017/10/11 6th IVTW -- Bologna Jonathan Romney

6th IVTW -- Bologna Jonathan Romney Internet Portal Shown on block diagram for completeness, but there are no realistic plans to implement. At least 3 past studies – going back to era of 1-Mbps maximum data rate – showed fiber transmission not to be cost-effective for VLBA. But margin of comparison definitely decreasing. If funding were available, would probably consider again. 2017/10/11 6th IVTW -- Bologna Jonathan Romney

6th IVTW -- Bologna Jonathan Romney Correlator The DiFX software correlator has fulfilled its promise to provide incrementally increasing capacity to match input data bandwidth. The VLBA’s current system should have sufficient capacity to support the upgraded systems described earlier in the data path. Simple upgrades providing additional processors will suffice for further expansions. 2017/10/11 6th IVTW -- Bologna Jonathan Romney

Thank you Thank you