LCLS Klystron Modulator AIP Sec 28 AIP Review Feb 2010

Slides:



Advertisements
Similar presentations
Ex. Pier South Pole Station Modernization (SPSM) MREFC Project Status Description: SPSM replaces 1970s era Dome Station for safety and capacity reasons.
Advertisements

ILCTA-MDB RF Power Status 9/21/06 Reid 1 ILCTA-MDB Status 1.3 GHz RF Power Meson Detector Building 3.9 GHz RF Power A0 Building September 21, 2006 [John.
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Validation of W4e Hydropower Turbine Generator PI Henry W Russell Walker Wellington,
Nov. 19, 2008 ILC08 Global Design Effort 1 Status Report Alternative Siting and Tunnel Design Tom Lackowski.
MICE RF TEST STAND Major Milestones (2006) –Testing of BURLE 4616 circuit September 2006 –Testing of 4616 circuit with full amplitude and phase control.
CUTTHROAT ENERGY Preliminary Design Review. Sponsored by:
1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Sensor Fish Redesign Collaboration Z. (Daniel) Deng Thomas J. Carlson Pacific.
Kyle Merkert ECE 791/792 Senior Design Project October 2009 – May 2010 Faculty Advisor: Dr. Wayne Smith.
2006 Reliability Study Scope Name Date. DRAFT 2 Purpose of Study Assess the PEC and Duke transmission systems’ reliability Develop a single reliability.
Linac Marx Modulator Update Trevor Butler 10/29/2014.
April 28, 2015 City Council Workshop. City Council Goal 1 Expansion  Objective: To enhance infrastructure in order to maintain quality neighborhoods.
Proton Improvement Plan Bob Zwaska August 3, 2015 All-Experimenters Meeting.
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
HLRF DRAFT Global Design Effort 1 Defining EDR* Work Packages [Engineering Design Report] Ray Larsen SLAC ILC Division for HLRF Team DRAFT April.
7/26/2006 Wyatt Merritt 1 DECam CD1 Documentation DOE Critical Decision Process Documentation Requirements.
Transmission Outage Process April Purpose In compliance with the Protocols and the Electric Reliability Council of Texas (ERCOT) Operating Guides,
IARC Milestones completed Sept 2011: End of Tevatron Run, FESS obtains ~full access to infrastructure at CDF, PPD begins D&D in CDF assembly bldg Sept.
Making Improvements Improve Kaizen Facilitation. Objectives Identify characteristics of a Pilot Test / Run Describe 5 phases for a Pilot Test / Run 
9/12/2003Ivan Hruska1 First box prototype –Box design in July ‘03 –Box produced during August ’03 Tested last week in few fingers Small changes necessary.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Executive Committee, Toronto August 3, 2005 TRT Barrel WBS 1.2/3.2 Harold Ogren Indiana University.
Douglas Bowman, PE, PMP Project Manager Entergy Corporation New Projects and Processes Ensure Power Transfer for Northeast Arkansas Customers.
PRESENTED AND PREPARED BY CITY OF MISSOULA PUBLIC WORKS DEPARTMENT.
LIGHTNING PROTECTION OF TRANSMISSION AND DISTRIBUTION LINES Team Members Eric Nelson, EE – Project LeaderDavid Dieterich, EE Tim Conrad, EE – Com. CoordinatorSam.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
Fall 2006P7305: Freshman Practicum AM Receiver P7305: Learning Module for EE Freshman Practicum Chris Urban: Lead Engineer Hans-Christian Rotmann: Project.
OTE Building PMG Report April 29, Agenda CDF D&D: J. Lewis OTE Building Project: R. Merchut Coordination State Activities Schedule Fiscal Summary.
P10203 LV1 MOTOR CONTROLLER FINAL REVIEW MAY 14, 2010 Electrical: Kory Williams, Adam Gillon, Oladipo Tokunboh Mechanical: Louis Shogry, Andrew Krall.
CBETA Project ALD’s Cost and Schedule Review February 6, 2017
Director’s Progress Review Closeout Meeting
Camera PDR/CD1 Planning 19 September 2008
Jim Fast Pacific Northwest National Laboratory
Cryogenic Plant Electrical and Controls
Deferred Maintenance Deferred Maintenance
Project Management W. J. Foyt
SLAC Accelerators Power Electronic System Operation for Reliability
SNS Status Report Karen S. White 10/15/08.
Status of the Planning Working Group’s (PWG) Efforts
ATF2 Magnet Power Supplies
CORRECTIVE MAINTENANCE (REPAIRS) MANAGEMENT
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
LCLS-II Cryoplant Controls Readiness to Procure
Renovation of the 45-year old PS magnets
(Additional materials)
Current Status Future Progress Monitoring
LLRF Controls Outline Requirements External Interfaces Schedule Design
ESS RF Development at Uppsala University
FAA MMAC Electrical Safety Program Implementation & Culture Change
SmartMeterTM Steering Committee Update – September 2012
IS&T Project Reviews September 9, 2004.
Injector –Linac Status & Schedule E. Bong LCLS FAC October 12, 2006
LLRF Control System Outline Scope Requirements Design Considerations
Energy Intensive User Group Generation Maintenance Update
SmartMeterTM Steering Committee Update – June 2012
TSF Upgrade Project Overview Resources Plans and Timetable
Resource Planning, Cost Estimation and Budgeting
Far Experimental Hall Hutches Civil Construction
SmartMeterTM Steering Committee Update – July 2012
Installation of Photon Beam Transport to FEH
Linac Coherent Light Source (LCLS)
SmartMeterTM Steering Committee Update – November 2012
LLRF Control System Outline Scope Requirements Options considered
Low Level RF Design Outline Scope Requirements Options considered
SAE battery safety standards committee UPDATE January 23, 2019
LCLS Undulator System Status and Schedule
Conventional Facilities
Vacuum Controls Stephen Schuh Tom Porter 25 October 2006
BC2 / Linac Installation Coordination Kathleen Ratcliffe
SNS-PPU upgrades the existing accelerator structure
PLAN OF WORK Plan of work is the general scheduling of program according to major activities (or phases) such as planning, implementation and evaluation.
Presentation transcript:

LCLS Klystron Modulator AIP Sec 28 AIP Review Feb 2010 Briant Lam and Ben Morris

Project Description Refurbish Sector 28 klystron modulators to demonstrate improvements to the safety and reliability of the 6575s that will enhance LCLS Safety: Segregate electrically hazardous circuits Control electronics in “touch safe” enclosures Reliability: Replacing obsolete and problematic relay logic control system with a modern PLC Redesign high failure components Internal voltage regulation, alternative to VVS

Prototype Status Construction completed Testing began with water load in B015 in November, continuing today

B015 Testing Status Run at 21.5kV & 30Hz, several hours of operation Validate higher rep rate (limited power) Finalize documentation

Prototype: – April 2010 Production: May – Sept. 2010 Schedule Complete B015 testing: 3/19 Install at 28-1: 3/30 Design validation (full power testing): 4/30 Production: May – Sept. 2010 Contingent upon completion of documentation and finishing validation of prototype unit: 5/3 No contingency to order long lead parts: now Modulator production rate: 3 weeks/modulator Sector 28 complete: 9/30 (22 weeks)

Cost Project Budget: $441k Cost to Date (-1/10) Cost to Complete $362k for ED&I and B&H ED&I cost overrun Cost to Complete Prototype & documentation (ED&I): $20k Production (B&H) Seven modulators M&S: $20k/modulator (8% G&A assumed) Labor: $12.5k/modulator (53% G&A assumed) Total: $227k Total cost-to-complete: $247k

Cost Budget Actual ED&I 2010-Jan $272k Cost to complete $20k Total B&H $90k $227k $230k $317k ($87) Contingency $88k Total Cost $441k $609k ($168)

Budget Overruns Issues ED&I B&H Contingency: enough for B&H overruns Assumed very little engineering development when in reality considerably more was needed B&H PLC costs: $1k estimate vs. $10k actual (EPICS) Contingency: enough for B&H overruns

Change Scope Increase Funding Potential Solutions Existing funding sufficient to complete prototype and two production units Limited statistical sample to evaluate efficacy of improvements with only 3 units in operation Increase Funding Additional $168k allocation in FY10 Complete S28 by end of FY10 Defer additional $168k allocation until FY11 Finish prototype, build remaining 2 in FY 2010 Complete remaining 5 units during FY11-Q1 Limited delay in amassing operational data