Copyright Assure911.net, LLC All Rights Reserved.

Slides:



Advertisements
Similar presentations
1 The document represents the EMSWGs response to recommendation #12 o TOPs should take measures to ensure that their real-time tools are adequate, operational,
Advertisements

Doc.: /xxr0 Submission November 2011 John Notor, Notor ResearchSlide 1 FCC Actions Related to Progeny LMS Notice: This document has been prepared.
Federal Communications Commission Public Safety and Homeland Security Bureau Public Safety Communications Update “View from the FCC” David G. Simpson,
1 Federal Communications Commission Public Safety and Homeland Security Bureau NARUC Summer Committee Meetings Dallas, Texas July 13, 2014 Clete D. Johnson.
Contractor Management and ISO 14001:2004
Stephen S. Yau CSE , Fall Security Strategies.
The Quality Management System
Lisa Wood, CISA, CBRM, CBRA Compliance Auditor, Cyber Security
A Combat Support Agency Defense Information Systems Agency DISN NetOps Service Assurance 2011 Customer Conference August 2011.
SBC and TSP Don Boland Director SBC National Security Emergency Preparedness FCC Presentation February 17, 2005.
Doc.: IEEE /1119r0 Submission November 2005 Alistair Buttar, MotorolaSlide 1 Support for Emergency Calls Notice: This document has been prepared.
December 6, 2002 M. Roden / D. Dautel FOCUS GROUP 1C Public Safety Report to NRIC VI Council December 6, 2002 Co-Chairs Mike Roden - Cingular Wireless.
Doc.: IEEE /90r0 Submission Nov., 2012 NICTSlide b NICT Proposal IEEE P Wireless RANs Date: Authors: Notice: This document.
Doc.: IEEE /0048r0 Submission March 2005 Tatsuji Munaka, Mitsubishi Electric Corp.Slide 1 User Scenario example; Sensor Overlay Network Notice:
Public Safety and Homeland Security Bureau Annual Report—2007 Presentation to the Commission January 17, 2008.
Doc.: IEEE /xxxxr0 Submission November, 2006 Scott Henderson, Research In Motion FCC : E911 Requirements for IP- Enabled Service Providers.
Copyright © 2006 by The McGraw-Hill Companies, Inc. All rights reserved. McGraw-Hill/Irwin 7-1 Chapter Seven Auditing Internal Control over Financial Reporting.
California Public Utilities Commission MLTS E9-1-1 Caller Location Information Proceeding (R ) Public Workshop California Office July 27,
NERC and ESISAC Electricity Sector Information Sharing and Analysis Center Update March 2006 CIPC Confidentiality: Public Release.
Simon J. ffitch Senior Assistant Attorney General Washington State Attorney General Office of Public Counsel November 2015 NASUCA Annual Meeting (Austin.
Control and Security Frameworks Chapter Three Prepared by: Raval, Fichadia Raval Fichadia John Wiley & Sons, Inc
Network Reliability and Interoperability Council Focus Group 3 April 14, 1999 Ray Albers- Bell Atlantic Focus Group III Chair.
Doc.: IEEE /0448r0 Submission March, 2007 Srinivas SreemanthulaSlide 1 Joiint TGU : Emergency Identifiers Notice: This document has been.
Responsive Innovation for Disaster Mitigation Gordon A. Gow University of Alberta.
Doc.: IEEE /0460r1 Submission March 2006 Fujio Watanabe, DoCoMo USA LabsSlide 1 Japanese Emergency Call Regulation Notice: This document has been.
Lowell Randel Global Cold Chain Alliance/ International Institute of Ammonia Refrigeration.
Doc.: IEEE /0185r0 Submission September 2006 Carl R. Stevenson, WK3C Wireless LLCSlide 1 IEEE WG Opening Report – September 2006 IEEE P
SAP Integrated Business Planning
Implementing SMS in Civil Aviation: the Canadian Perspective
Analysis of Network Outage Reports
Analysis of Network Outage Reports
Joint TGu : Location Configuration for Emergency Services
Proposal for SSPN Interface Cluster
TIA Liaison Report September 2006
TIA Liaison Report November 2005
WLAN Paging and Idle Mode
AFTER 20 YEARS, IT’S TIME TO UPDATE THE TELEPHONE CONSUMER PROTECTION ACT (TCPA). Howard Waltzman Partner
Give priority to your critical communications.
Project Charter START IT! By Catherine B. Calio, PMP
Network management system
IEEE WG Status Report – July 2005
The Upcoming DoD Standard on PSAP Notifications of Major Incidents
Rates & Regulatory Updates
Emergency Call number support
and LMAP liaison Document Number: IEEE R0
ES Access Date: Authors: May, 2008 November 2005
IEEE WG Status Report – July 2005
Transmit Power Requirements
Japanese Emergency Call Regulation
RR-TAG Liaison Report IEEE
Document Framework Section
Analysis of Network Outage Reports
Coordinate Operations Standard
[Distributed Sensing for Active 2 Set Channels]
CX_NET_SAP Primitives
What Is VQIP? FDA required to establish a program to provide for the expedited review of food imported by voluntary participants. Eligibility is limited.
and LMAP liaison Document Number: IEEE R0
IEEE WG Status Report – March 2006
November 2014 IG CUB Opening Report
March 2015 SG CUB Opening Report
IEEE P Wireless RANs Date:
HPP Coalition Surge Test Hospital Briefing March 13, 2019
STA Location for emergency call support in SSPN interface
Enhanced 911 for VoIP Standards and Regulatory
RR-TAG Liaison Report IEEE
3gpp2-liaison-report-november-2005
Proposal for Event Log Authors: Date: March 2006 Month Year
Notes on TGu liaison November 2005 Date: Authors:
Trademark, Copyright, And Patents | Get physical and paper proof
Presentation transcript:

Copyright Assure911.net, LLC 2015. All Rights Reserved. Assure911™ for Reliable Emergency Communications Enhanced 9-1-1 Failure Detection Cross Organizational Situational Awareness Assure911 is Trademark of Network Expert Software Systems, Inc. Used under license. David Staub 860 620-7735 dbs@assure911.net 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

Copyright Assure911.net, LLC 2015. All Rights Reserved. What is Reliability? “In my village the perception of reliability of our 9-1-1 service is that if someone sees another person bleeding, they’ll call 9-1-1 first.” - Overheard at a IIT RTCL Conference 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

Definition – Situational Awareness Related to a 9-1-1 outage “All entities in the chain of end-to-end 911 service must give serious consideration to ensuring that information about alarms associated with critical physical and logical functionalities is shared among such entities along the 911 call chain” From: April 2014 Multistate 911 Outage: Cause and Impact Report and Recommendations, Dated October 10/2014 Public Safety Docket No. 14-72 PSHSB Case File Nos. 14-CCR-0001-0007 Section 4.4 Communications Among 911 Ecosystem Participants 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

Definition – Situational Awareness requires the END-to-END VIEW “Our goal of proactive, measured accountability for reliable 911 call completion extends from the provision of service to the 911 caller at one end to the provision of service to the PSAP on the other.” From: Document FCC-14-186A1 POLICY STATEMENT AND NOTICE OF PROPOSED RULEMAKING Adopted: November 21, 2014 Released: November 21, 2014 II. BACKGROUND, A. Entities Providing 911 Connectivity, Paragraph 7, Page 4 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

Copyright Assure911.net, LLC 2015. All Rights Reserved. Value – 9-1-1 Service Situational Awareness reduces risk To LIVES To Business 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

9-1-1 outages put lives at risk Value 9-1-1 outages put lives at risk 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

9-1-1 outages can be costly to service providers Value 9-1-1 outages can be costly to service providers 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

Copyright Assure911.net, LLC 2015. All Rights Reserved. Reporting and Notification for Regulatory Compliance 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

Copyright Assure911.net, LLC 2015. All Rights Reserved. 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

Fiber Cut in Transport Facilities Outage Scenario: Fiber Cut in Transport Facilities Carrier and VSP OSS IP Transport OSS Element Manager Element Manager Patented 9-1-1 Status System and Method 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

9-1-1 System Service Provider Actionable Alerts sent to users based on Role Fiber Cut in Transport Facilities 9-1-1 System Service Provider PSAP Management FCC 05/14 11:05 No Trouble 05/14 11:10 Circuit Fail Wireline Carrier 05/14 11:10 Ckt Fail: NXX-319 more 05/14 11:10 No Trouble 05/14 11:15 PSAP Notified 05/14 11:15 Ckt Fail: NXX-319 more 05/14 11:15 No Trouble 05/14 11:20 Circuit Fail CLEC (1x) 05/14 11:20 Ckt Fail: NXX-319 more 05/14 11:20 No Trouble 05/14 11:25 Circuit Fail CLEC (3x) REPORTABLE 05/14 11:25 Ckt Fail: NXX-319 more 05/14 11:25 No Trouble 05/14 11:30 Circuit Fail Wireless Carrier (5x) 05/14 11:30 Ckt Fail: NXX-319 331 more 05/14 11:30 No Trouble 05/14 11:35 FCC Must be Notified in 10 mins 05/14 11:35 Ckt Fail: NXX-319 331 more 05/14 11:35 No Trouble 05/14 11:40 Transport Provider 05/14 11:40 Ckt Fail: NXX-319 331 more 05/14 11:40 Outage in Mytown 05/14 11:45 FCC Notified 05/14 11:45 Ckt Fail: NXX-319 331 more 05/14 11:45 Outage in Mytown 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.

Copyright Assure911.net, LLC 2015. All Rights Reserved. Let’s work together to improve End-to-End 9-1-1 Reliability Visit assure911.com for more information 09/25/2015 Copyright Assure911.net, LLC 2015. All Rights Reserved.