Support structure and target pre-stress

Slides:



Advertisements
Similar presentations
LR Summary and LQ Plan Jesse Schmalzle w/ contributions from: J. Muratore (BNL) P. Ferracin (LBNL) October 18, 2007.
Advertisements

Racetrack Coil Technology – G. Ambrosio 1 LARP DOE review – FNAL, June. 5-6, 2007 BNL - FNAL - LBNL - SLAC Racetrack Coil Technology (LR, SQ) & other Supporting.
Dan Cheng H. Felice, R. Hafalia QXF Structures Video Meeting July 10, 2014 Coil Handling for Magnet Assembly Status Update.
S. Caspi, LBNL HQS Progress Report High Field Nb 3 Sn Quadrupole Magnet Shlomo Caspi LBNL Collaboration Meeting – CM11 FNAL October 27-28, 2008.
Helene Felice Joint LARP CM20 / Hilumi Meeting April 8 th to 10 th 2013 Napa, CA, USA HQ02 Assembly summary and Next steps.
SQXF Coil 2 Impregnation Status & Plan Fred Nobrega 09/09/2014.
LARP QXF 150mm Structure Mike Anerella / John Cozzolino / Jesse Schmalzle November 15, nd Joint HiLumi LHC-LARP Annual Meeting.
MQXFS Assembly Procedure J.C Perez 4 th Joint HiLumi LHC-LARP Annual Meeting November 17-21, 2014 KEK, Tsukuba N. Bourcey, D. Cheng, B. Favrat, H. Felice,
SQXF Shell & Yoke Assembly Procedure
BNL - FNAL - LBNL - SLAC Long Quadrupole Results & Status Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
2 nd Joint HiLumi LHC – LARP Annual Meeting INFN Frascati – November 14 th to 16 th 2012 Helene Felice Paolo Ferracin LQ Mechanical Behavior Overview and.
Development of the EuCARD Nb 3 Sn Dipole Magnet FRESCA2 P. Ferracin, M. Devaux, M. Durante, P. Fazilleau, P. Fessia, P. Manil, A. Milanese, J. E. Munoz.
HiLumi-LHC / LARP Conductor and Cable Internal Review October 16 th and 17 th 2013 H. Felice LARP Short Magnets Fabrication and Test experience relevant.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN H. Felice, R. Hafalia, D. Horler, T.
LARP Prototype Assembly Steps Towards Q1 and Q3 Production Dan Cheng MQXF Design Review December 10-12, 2014 CERN.
BNL - FNAL - LBNL - SLAC Design and Test of the 1 st Nb 3 Sn Long Quadrupole by LARP Giorgio Ambrosio Fermilab Acknowledgement: many people contributed.
ASC 2012Nb 3 Sn IR Quadrupoles for HL-LHC – G. Sabbi 1 Nb 3 Sn IR Quadrupoles for HL-LHC BNL - FNAL - LBNL - SLAC GianLuca Sabbi for the US LHC Accelerator.
BNL - FNAL - LBNL - SLAC Progress Report on LQ Program Giorgio Ambrosio Fermilab Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
S. Caspi, LBNL HQ Progress and Schedule Shlomo Caspi LBNL LARP Collaboration Meeting – CM13 Port Jefferson November 4-6, 2009.
MQXF support structure An extension of LARP experience Helene Felice MQXF Design Review December 10 th to 12 th, 2014 CERN.
Subscale quadrupole (SQ) series Paolo Ferracin LARP DoE Review FNAL June 12-14, 2006.
MQXFS Assembly Procedure J.C Perez N. Bourcey, B. Favrat, P. Ferracin, Ph. Grosclaude, M. Juchno, L. Lambert, P. Moyret, J. Parrilla Leal, N. Peray, T.
Hybrid Structure with Cooling John Cozzolino LARP Collaboration Meeting Port Jefferson, NY November 4-6, 2009.
Magnet design, final parameters Paolo Ferracin and Attilio Milanese EuCARD ESAC review for the FRESCA2 dipole CERN March, 2012.
Long Quadrupole – G. Ambrosio 1 LARP Collaboration Meeting – FNAL, Oct , 2008 BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio LARP Collaboration.
S. Caspi, LBNL TQS – Progress and plans Shlomo Caspi LBNL Collaboration meeting FNAL April
Overview short model design and structures P. Ferracin on behalf of the MQXF collaboration MQXF Workshop on Structure, Alignment, and Electrical QA CERN.
1 BNL -FNAL - LBNL - SLAC P. Wanderer IR’07 - Frascati 7 November 2007 U.S. LARP Magnet Programme.
DESIGN STUDIES IR Magnet Design P. Wanderer LARP Collaboration Meeting April 27, 2006.
TQC03e Test Status  Magnetic measurements at 300 K  Z-scan at ±10 A  Magnetic measurements at 4.6 K (I max up to 6.5 kA)  Quench training and ramp.
DOE Review of LARP – February 17-18, 2014 Helene Felice P. Ferracin, M. Juchno, D. Cheng, M. Anerella, R. Hafalia, Thomas Sahner, Bruno Favrat 02/17/2014.
S. Caspi, LBNL HQ Magnet Program Shlomo Caspi LBNL LARP DOE Review FNAL June 1-2, 2011 BNL Jesse Schmalze Mike Anarella Peter Wanderer Arup Gosh FNAL Rodger.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Long Quadrupole Task Leaders: Fred Nobrega (FNAL) – Coils Jesse Schmalzle (BNL) – Coils.
BNL - FNAL - LBNL - SLAC Long Quadrupole Giorgio Ambrosio Fermilab Many people contributed to this work, most of all the Long Quadrupole Task Leaders:
Coil-pack assembly procedure Paolo Ferracin LQS01 readiness review #3 Assembly LBNL July 28, 2009.
Answers to the review committee G. Ambrosio, B.Bordini, P. Ferracin MQXF Conductor Review November 5-6, 2014 CERN.
LHC Performance Workshop 2012Nb 3 Sn IR Magnets – G. Sabbi 1 New Magnets for the IR How far are we from the HL-LHC Target? BNL - FNAL - LBNL - SLAC GianLuca.
3 rd ESAC Review, 27 th February to 1 st March 2013, CEA Saclay Fresca2 Dipole Structure Assembly J.C Perez on behalf of Fresca2 collaboration team.
QXF magnet integration Paolo Ferracin Joint LARP/CM20 HiLumi meeting Napa Valley, CA, USA 8-10 April, 2013.
1 Long QXF Mirror Fabrication (MQXFPM1) Rodger Bossert HiLumi-LARP Collaboration Meeting May 18-20, 2016 SLAC R. Bossert - HiLumi Collaboration Meeting.
1 MQXFS Mirror Fabrication R. Bossert, G. Chlachidze, S. Stoynev HiLumi-LARP Collaboration Meeting May 11-13, 2015 FNAL.
Helene Felice Team: Dan Cheng, Daryl Horler, Paul Bish, Hugh Highley and Nate Liggins Thank you to Paolo Ferracin, Gianluca Sabbi and Franck Borgnolutti.
LHQ01 IL Curing Miao Yu 01/31/2013. LHQ IL Packing for Curing 2.
Page 1 TQC Mechanical Model Igor Novitski / Rodger Bossert May 24, 2006 Results of MM#4 and MM#5.
MQXF Design and Conductor Requirements
TQS Overview and recent progress
TQ Program and Review Charge
HQ02b Preload Increase - Summary
HQ Mirror Assembly R. Bossert
TQS Structure Design and Modeling
Rodger Bossert/Shlomo Caspi
SQXF Mirror QXFSM1 Strain Gauges
TQC-01 SG data I. Novitski.
FRESCA2 Update on the dipole design and new calculations
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Discussion session on day 1
Glyn Kirby Magnet AssemblyTechniques.
MKQXF FEA Model Haris Kokkinos
MQXF updates P. Ferracin October 9th, 2014.
New Magnets for the IR How far are we from the HL-LHC Target?
MQXF coil cross-section status
CERN Accelerator School Superconductivity for Accelerators Case study 2 Paolo Ferracin European Organization for Nuclear Research.
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
Design of Nb3Sn IR quadrupoles with apertures larger than 120 mm
FRESCA2 - Coils 1+2 scenario
Helene Felice 02/15/2013 HiLumi Meeting HQ Program
Long term behavior and high MIITs test in the LARP program
Cross-section of the 150 mm aperture case
HQ test at CERN: strain and stress measurements
Presentation transcript:

Support structure and target pre-stress LQS01 assembly plan Paolo Ferracin LQS01 readiness review #1 Support structure and target pre-stress LBNL April 7, 2009

Outline Assembly of coil pack LQS01 pre-stress scenarios Paolo Ferracin 04/07/2009

LQS01 coil-pack assembly procedure Paolo Ferracin 04/07/2009

LQS01 coil-pack assembly procedure Inner strong-back is attached to first coil Inner strong-back, with first coil, is rotated to engage second coil Paolo Ferracin 04/07/2009

LQS01 coil-pack assembly procedure Placement of this bottom coil-pair on the bottom load-pad assembly of the coil-pack Paolo Ferracin 04/07/2009

LQS01 coil-pack assembly procedure Roll-over wheels are installed and assembly is placed on the surface plate Coil-pair is rolled over, constrained in position and wheels are removed Paolo Ferracin 04/07/2009

LQS01 coil-pack assembly procedure Outer strong-back is attached and inner strong-back is detached Paolo Ferracin 04/07/2009

LQS01 coil-pack assembly procedure Coils are lifted to be placed on top of bottom coils Paolo Ferracin 04/07/2009

LQS01 coil-pack assembly procedure COIL-BORE ALIGNMENT DONUTS BOTTOM COIL-PAIR ANCHORS BOTTOM LOAD PAD ASSEMBLY Paolo Ferracin 04/07/2009

Test of the coil-pack assembly procedure Placement of 2 dummy coils on bottom pad Roll over operation tested with coil 4 and 5 Placement of coil 4 and 5 on top of dummy coils Paolo Ferracin 04/07/2009

Outline Assembly of coil pack LQS01 pre-stress scenarios Paolo Ferracin 04/07/2009

LQS01 target pre-stress Scenario 1: pre-load for 240 T/m (13.8 kA) Shell Strain From 520 to 1860 µε Stress From 40 to 165 MPa Coil pole From -400 to -816 µε From -57 to -128 MPa Coil peak stress: 170 MPa Paolo Ferracin 04/07/2009

LQS01 target pre-stress Scenario 2: pre-load for 230 T/m (13.2 kA) Shell Strain From 386 to 1714 µε Stress From 29 to 152 MPa Coil pole From -295 to -701 µε From -42 to -112 MPa Coil peak stress: 160 MPa Paolo Ferracin 04/07/2009

LQS01 target pre-stress Scenario 3: pre-load for 220 T/m (12.6 kA) Shell Strain From 252 to 1567 µε Stress From 19 to 139 MPa Coil pole From -189 to -586 µε From -27 to -97 MPa Coil peak stress: 150 MPa Paolo Ferracin 04/07/2009

Dummy coil stress at 77 K Measured azimuthal: -194 ± 25 MPa Target azimuthal: -225 MPa Paolo Ferracin 04/07/2009

Shell azimuthal microstrain during LQSD loading Initial “gap-keys” condition: ~200 microstrain Paolo Ferracin 04/07/2009

Pre-load scenarios and comparison with TQS02 (scaled) cases ey (293 K) ey (4.5 K) σy (293 K) σy (4.5 K) Microstrain MPa Shell 240 T/m, σpeak_coil = 170 MPa +520 ± 190 +1860 ± 222 +40 ± 15 +165 ± 18 230 T/m, σpeak_coil = 160 MPa +386 ± 190 +1714 ± 222 +29 ± 15 +152 ± 18 220 T/m, σpeak_coil = 150 MPa +252 ± 190 +1567 ± 222 +19 ± 15 +139 ± 18 TQS02a +1506 ± 284 +169 ± 30 TQS02b +1767 ± 333 +193 ± 37 TQS02c +1829 ± 334 +198 ± 43 TQS02d +1842 ± 319 +200 ± 37 Ti pole -400 ± 157 -816 ± 231 -57 ± 12 -128 ± 24 230 T/m, σpeak_coil = 160 MPa -295 ± 157 -701 ± 231 -42± 12 -112 ± 24 220 T/m, σpeak_coil = 150 MPa -189 ± 157 -586 ± 231 -27 ± 12 -97 ± 24 -960 ± 62 -142 ± 13 Paolo Ferracin 04/07/2009