University of Bristol Service Management Project

Slides:



Advertisements
Similar presentations
PRD Group Maturity Matrix 31/07/08. Maturity Matrix Guidance Notes Aims of the Matrix The Maturity Matrix is a tool aimed to support groups during their.
Advertisements

Press Esc to end the show INTRODUCTION TO MANAGING THE HUMAN RESOURCE.
Achieve Benefit from IT Projects. Aim This presentation is prepared to support and give a general overview of the ‘How to Achieve Benefits from IT Projects’
ITIL: Service Transition
Dr. Julian Lo Consulting Director ITIL v3 Expert
Problem Management Overview
Change Advisory Board COIN v1.ppt Change Advisory Board ITIL COIN June 20, 2007.
Release & Deployment ITIL Version 3
S T A M © 2000, KPA Ltd. Software Trouble Assessment Matrix Software Trouble Assessment Matrix *This presentation is extracted from SOFTWARE PROCESS QUALITY:
Slide 1 D2.TCS.CL5.04. Subject Elements This unit comprises five Elements: 1.Define the need for tourism product research 2.Develop the research to be.
CO2403 and CO3808 – Quality Management Systems Quality process definition, administration and accreditation.
EQARF Applying EQARF Framework and Guidelines to the Development and Testing of Eduplan.
Deakin Richard Tan Head, Information Technology Services Division DEAKIN UNIVERSITY 14 th October 2003.
CSI - Introduction General Understanding. What is ITSM and what is its Value? ITSM is a set of specialized organizational capabilities for providing value.
ItSMF-Australia Deakin University “Where’s My Dinner?” Darren Burgess Program Director, Service Improvement Program Business Services Manager Information.
Georgia Institute of Technology CS 4320 Fall 2003.
© 2001 Change Function Ltd USER ACCEPTANCE TESTING Is user acceptance testing of technology and / or processes a task within the project? If ‘Yes’: Will.
Introduction to the Continual Service Improvement Toolkit Welcome.
Developing a Sustainable Procurement Policy and Strategy EAUC – EAF Programme.
Project management Topic 1 Project management principles.
Saving lives, changing minds. Gender and Diversity Accountability to beneficiaries and beneficiary communications Gender and Diversity Training.
Overview of Socio-cognitive Engineering General requirements Theory of Use Design Concept Contextual Studies Task model Design space System specification.
CSI - Introduction ITIL v3.
Continual Service Improvement Methods & Techniques.
ITIL Foundation Online Delivery Method : Online Duration : 60 Days The ITIL® Foundation Certificate allows delegates to gain a comprehensive grounding.
CHANGE READINESS ASSESSMENT Measuring stakeholder engagement and attitude to change.
Raising standards improving lives The revised Learning and Skills Common Inspection Framework: AELP 2011.
ITIL® Core Concepts “Foundations to the Framework” Thatcher Deane 02/12/2010.
Community of Practice K Lead Project Team: الالتزامالتحفيز التفكير المؤسسي المرونةالتميزالشراكةالاستقامة.
PACFaH M&E TOOLS AND REPORTNG TIMELINES Jayne Arinze-Egemonye.
Meeting Standards and Expectations in the Water Industry
University of Bristol Service Management Project
ITIL: Service Transition
Workplace Projects.
Service Management World Class Operations - Impact Workshop.
BIL 424 NETWORK ARCHITECTURE AND SERVICE PROVIDING.
Managing the Project Lifecycle
Project life span.
Identify the Risk of Not Doing BA
Priorities and system changes
Implementing the NHS KSF Action Planning and Surgery Session
Responsibilities & Tasks Week 2
Stakeholder Engagement Plan: Background to Roles and Responsibilities
What is performance management?
Hyper-V Cloud Proof of Concept Kickoff Meeting <Customer Name>
School Self-Evaluation 
Overview – Guide to Developing Safety Improvement Plan
9/16/2018 The ACT Government’s commitment to Performance and Accountability – the role of Evaluation Presentation to the Canberra Evaluation Forum Thursday,
TSMO Program Plan Development
Establishing Strategic Process Roadmaps
Managing performance What is it? Why? How?.
Project Roles and Responsibilities
Chapter 6 Project Management and Project Cycle Management.
Overview – Guide to Developing Safety Improvement Plan
The Process Owner is the Secret Agent!
Establish Process Governance
Strawman Best Practice IIA Change Forum June 2017
LNW Route Energy Efficiency Working Group
Change Assurance Dashboard
Monitoring and Evaluation using the
IS Development Managing IS Development projects
CHIPS for schools NSW Education Complaint Handling Improvement Program
Assessment Workshop Title of the Project (date)
Safety Management System Implementation
Employee engagement Delivery guide
Key Value Indicators (KVIs)
Portfolio, Programme and Project
Asset condition and priority in Maximo
Executive Project Kickoff
Building your Webex adoption dream team
Presentation transcript:

University of Bristol Service Management Project Ann Field 15 July 2008

Contents Recommendations summary Management buy-in Other Pre-requisites ITIL Programme workstreams – key activities, broad timelines, dependencies

Recommendations – to develop during workshop on Tues 15th and updated here to reflect that discussion Use the existing Business Case drivers to gather support for an Improvement project with the following priorities: Acceptance that Service Management introduces an effective Governance model that supports good quality IT service delivery NEW – not in the current draft of the business case Including the introduction of a ‘Service Level Management’ concept and culture, to aid prioritisation Formalises some aspects of the existing management structures, and invests them in the responsibility for driving service strategy and policy changes Introduce Change Management – a process has been defined, although not implemented Introduction of an effective Incident Management process to support the HelpDesk in tandem with revised Call Handling function – a decision is needed (governance) regarding the management policy change this implies Introduce Service Level Management Revamp or replace the HelpDesk tool – Requirements capture is mostly complete Project to define & prioritise requirements for the tool, including: Incident Mgt Problem Mgt Change Mgt Configuration Mgt Reporting (supports SLM) Tool selection & implementation Agree on the level of integration and definition that is required for Configuration Management at a University Level – agreed that it is important to define this scope and then to progress the project in stages. Define Configuration Management objectives and phases Business Case for Phase 1

Workshop Recommendations to Project Board Introduction of an integrated support model, with all IT Support staff including department-based staff, operating within the ITIL framework, within which their process Roles/Responsibilities defined by a RACI model (RACI: Responsible, Accountable, Consulted, Informed) The meeting believes that a willingness exists to work this way – but needs selling via a ‘hearts and minds’ campaign, particularly aimed at Departmental Management Senior management understand the benefits that a formal framework will bring, in terms of removing single points of failure, bridging skills and knowledge gaps, etc. IT Staff do informally work in a co-operative way, e.g. mobile IT Staff support model is developing Heads of departments may fear a loss of control Education Trust Understanding the benefits that skills and knowledge sharing can bring, with specialists working within a broader IT team Developing a formal knowledge base Sensitively introducing centralised logging, in support of the IT staff network Enables local staff to develop pro-active aspect of their role Introduce formal skill and knowledge management process to: Reduce possibility of single points of failure / improve support matrix Help staff ‘buy-in’ to their roles within the integrated model by enabling them to see the development opportunities that it offers

Key Dependencies & pre-requisites Management ‘buy-in’ and genuine commitment to the service management initiative Help Desk structure needs a review if it is to operate effectively in the new service model Structure, location, size Decide incident management model Current call volumes are not representative of the support call volumes in ‘new world’ structure Compare with other universities (e.g. UWE) who have introduced centralised logging Consider manpower required to develop and implement ITIL Process development and implementation takes time, on top of ‘day job’ Existing cross-team working (e.g. around configuration management) means that an understanding of both the amount of effort required is developing, as is an appreciation of the benefits of working this way New role (e.g. Change Manager) required Full time during process implementation; may reduce thereafter Make sure the processes aren’t bureaucratic E.g. a slick standard change model will be required to ensure Network engineers adopt Change Mgt Sell the processes in terms of ‘what it means to me’ not overly formal process Use RACI model to explain process interactions to staff

Raise & Log RFC (Case Handling) Requests for Change are logged into the Change Management Process in order that they can be tracked through to completion. The entry to EARS (Capgemini’s Change Logging system) may be directly through those users with access or requests may be submitted to the Change Administrator for entry to the system.

Filter Change Requests An initial filtering of Change Requests is undertaken to remove any requests which are judged to be obviously impractical. The judgement will be taken in dialogue with the originator and all parties made aware of any filtering and the reason.

Assign All resources with tasks to perform to implement the change are to be assigned their work packages formally for the Change Administrator to track progress through feedback from the Build Teams. It is assumed that original estimates and risks are reasonably accurate unless or until any problems are flagged for discussion.

Service Support processes: Straw man targets & timescales for consideration Level 1 Prerequisites Level 1.5 Management Intent Level 2 Process Capability Level 2.5 Internal Integration Level 3 Products Level 3.5 Quality Control Level 4 Management Information Level 4.5 External Integration Level 5 Customer Interface 6 months 12 Months Maturity level Equates to in OGC assessment 1, Initial, Ad-hoc 1 & 1.5 2, Repeatable but intuitive 2 & 2.5 3, Defined 3 & 3.5 4, Managed and measurable 4 & 4.5 5, Optimised 5

Interviewees – 8 July 2008 John Richards Lucy Shepherd-Hucker Henryk Glogowski Bob Walker Paul Buttner Luke Taylor