Overview of New Control Room Desk

Slides:



Advertisements
Similar presentations
FEBRUARY 14, 2013 RELIABILITY COMMITTEE MEETING Steve Weaver SYSTEM OPERATIONS In-Day Reserves & Supplemental Procurement.
Advertisements

Preliminary Impacts of Wind Power Integration in the Hydro-Qubec System.
Jim Mcintosh Director, Executive Operations Advisor California ISO Independent Energy Producers 2011 Annual Meeting - October 5, 2011 Stanford Sierra Conference.
G 200 L 200 ISO NEW ENGLAND T H E P E O P L E B E H I N D N E W E N G L A N D ’ S P O W E R. COLD SNAP Overview of Proposed Options for Winter 2004/2005.
A R EVIEW OF L ARGE -S CALE R ENEWABLE E LECTRICITY I NTEGRATION S TUDIES Paulina Jaramillo, Carnegie Mellon University And Paul Hines, University of Vermont.
Ancillary Services Methodology Changes for 2015 Sandip Sharma Bill Blevins Dan Woodfin.
PLWG Report to ROS July 9, PGRRs needing vote PGRR043 – FIS Scoping Amendment – PGRR043 moves the Subsynchronous Resonance (SSR) Study out of the.
Joel Koepke, P.E. ERCOT Operations Support Engineer ERCOT Experiences During Summer 2011.
Julia Matevosyan, Resource Adequacy January, 2014 Application of KERMIT in the DOE LTS process.
Sai Moorty ERCOT Integration Options into ERCOT systems.
Lead from the front Texas Nodal Version EDS 3 R6.3 8 Focused Input Test (FIT) II Web Ex Texas Nodal Load Frequency Control.
Lecture 31. Chapter 8 Budgetary Planning and Control.
NSRS deployment April John Adams ROS – May 12, 2005.
1 Renewable Technology Working Group (RTWG) July 14, 2009 Henry Durrwachter.
1 Ancillary Services Requirements for Future Ancillary Services Cost Benefit Analysis FAS/SIRS Meeting September 21, 2015.
August 17, 2011 Reliability Deployments Task Force Meeting Updated Analysis of Non-Spin Deployments and RUC John Dumas Director Wholesale Market Operations.
ERCOT Planning WMS 10/20/2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System – Methodology.
ERCOT Planning October 2010 Target Reserve Margin and Effective Load Carrying Capability of Installed Wind Capacity for the ERCOT System - Methodology.
Overview of Revised Ancillary Services (AS) Framework Proposal
Reliable Power Reliable Markets Reliable People Losses and Ancillary Services: Volume Analysis 2007 Budget Review Process August 28, 2007 Operations Planning.
Risk Management & Corporate Governance 1. What is Risk?  Risk arises from uncertainty; but all uncertainties do not carry risk.  Possibility of an unfavorable.
1 1 Beacon Power Corporation Energy Storage – Regulation Issues Prepared for: Emerging Technologies Working Group January 5, 2011.
1 Reliability Deployment Task Force (RDTF Meeting) December 20 th 2011 December 20, 2011.
Power Association of Northern California Maintaining Grid Reliability In An Uncertain Era May 16, 2011 PG&E Conference Center Jim Mcintosh Director, Executive.
October 29, Organizational role of Short-Term Planning and Hydro Duty Scheduling Relationship to other groups in BPA Planning and analysis job.
Operational Issues & Risks ERCOT Operations Planning August 22, 2008.
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Operations Report Kent Saathoff System Operations ERCOT.
Integrating Wind Energy Capabilities of Wind Power Plants Mark Ahlstrom Wind Energy: A Good Citizen of the Electric Grid Four Corners Wind Resource Center.
Floyd Trefny, P.E. Director of Wholesale Market Design Nodal Market Tools to Manage Wind Generation January 29, 2009 Presentation to the Renewables Technology.
Grid Reliability Metrics by Jim Dyer Electric Power Group, LLC January 29, 2004 Washington, DC Transmission Reliability Research Review.
MISUG Meeting Materials ERCOT 9/07/ MISUG Agenda 9/07/ Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionJ. Lavas9:35 a.m. 3. Follow up.
Future Ancillary Services Team (FAST) Update April 24, 2014 TAC Meeting 1.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
Planning for Texas’ Energy Future Select Committee on Electric Generation Capacity and Environmental Effects Bob Kahn President & CEO February 6, 2008.
PDCWG Report to ROS January 13, 2011 Sydney Niemeyer.
Real Time Balancing (RTB) & Resource Plan Statuses Change to the QSE practice of showing offline units as online and available ERCOT Presentation to ROS.
07/27/2006 Overview of Replacement Reserve Procurement ERCOT Staff PRS RPRS Task Force.
1 TAC Report to the ERCOT Board July 18, TAC Summary 4 PRRs for approval (3 unanimous) 4 PRRs for approval (3 unanimous) 5 Nodal PRRs for approval.
April 13, 2007 Regional Planning Group Meeting Wind Impact/Integration Analysis Warren Lasher Regional Planning.
Future Ancillary Services Cost Benefit Analysis Overview Julia Matevosyan February 1, 2016 FAS Workshop.
Long Term Study Task Force Update Seeking Software Solutions: Analysis of Future System Operational Reliability Requirements.
MISUG Meeting Materials ERCOT 7/26/ MISUG Agenda 1.Antitrust AdmonitionJ. Lavas9:30 a.m. 2.IntroductionsJ. Lavas9:30 a.m. 3.Market Data Transparency.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Non-Spin Deployment Resmi Surendran. RUC Awarded Ancillary Service Bring Resources On-Line if awarding REG or RRS When awarding Non-Spin – First award.
ERCOT Market Education Market Role in Emergency Operations OTS 2016.
NSRS in Nodal Proposal for Deployment & Recall Procedures ERCOT ROS 10/12-13/2006 By: S.Niemeyer R.Jones R.Wheeler B.Green J.Dumas P.Breitzman.
2017 ERCOT Strategic Planning Sessions
Target Reserve Margin (TRM) and Effective Load Carrying Capability (ELCC) of Wind Plants Evaluation - Input and Methodology ERCOT Planning 03/25/2010.
Update on NPRR615 PVGR Forecasting
Erik Ela, Eamonn Lannoye, Bob Entriken, Aidan Tuohy
Analysis of the Effects of a Flexible Ramping Ancillary Service Product on Power System Operations Ibrahim Krad Eduardo Ibanez Erik Ela.
Appeal of PRS Rejection of NPRR 667
NPRRs 815NPRR Revise the Limitation of Load Resources Providing Responsive Reserve (RRS) Service.  This Nodal Protocol Revision Request (NPRR) revises.
Reactive Power Coordination Workshop
Black Start Overview.
RTDF Overview of Data Analysis & Status of “Consesus Items”
David Kee Chair CPS Energy Sydney Niemeyer Vice Chair NRG Energy
Representing Rainbow Energy Marketing Corporation
Missed Postings July 2016 through August 22, 2016: Summary
Energy and Ancillary Services Design Stream Working Group Meeting 6
Compliance Report to ERCOT TAC February 2007
Grid Integration of Intermittent Resources
penetration of wind power
EU-IPA12/CS02 Development of the Renewable Energy Sector
Jose GONZALEZ PASTOR Economic & Adequacy Analyst - Elia
30 Minute Reserves EPFSTF January 4,
EE379K/EE394V Smart Grids: Ancillary Services
Sandip Sharma ERCOT Manager, Operations Planning
Jim Mcintosh Director, Executive Operations Advisor California ISO
Presentation transcript:

Overview of New Control Room Desk Dan Woodfin Sr. Director, System Operations ROS ERCOT Public February 2, 2017

Traditional Operational Risks ERCOT operators deal with a variety of traditional risks in the Control Room: Transmission line faults and outages Generation Resource trips Load Forecast errors Base Point Deviations Control Room primarily assesses risk to operational reliability through: Characterization of contingencies and their consequences, Determination of operating reserves and limits to be maintained, Informed, experienced operator judgment Operational Monitoring and Analysis Operating Actions

Evolving Risks With the changing resource mix on the system, the need to assess and manage certain risks has grown Improved quantitative analysis and dynamic consideration of these risks and controls are needed Traditional Needs Evolving Needs Operational Monitoring and Analysis Operating Actions Operating Actions

Evolving Risks Intent is to perform existing activities with more in-depth monitoring and analysis Type and volume of resulting operating actions is not expected to change, except in situations where the increased risks manifest themselves Traditional Needs Evolving Needs Operational Monitoring and Analysis Operating Actions Operating Actions

Reliability Risk Desk Status To meet ERCOT’s strategic goal of adapting to the changing resource mix, staffing for a new desk in Control Room was approved in 2016-17 budget Initial tools, procedures, staffing and training has been completed and new desk went live on 1/30/2017 New Operations Procedures are posted – Power Operations Bulletin 770

Reliability Risk Desk Goals Facilitate improved accuracy of renewable forecasts Promote improved telemetry performance from wind/solar plants Perform forecast adjustments during icing and other extreme weather events Maintain sufficient frequency responsive reserves Confirm critical level of inertia is online Ensure frequency responsive capacity is available to cover actual inertia conditions Maintain sufficient temporally available capacity to cover remaining forecast errors and net load ramps

Reliability Risk Desk Activities 1. Renewable Forecast and Extreme Weather Monitoring 2. Inertia Monitoring and RRS Sufficiency 3. Forecast Error Risk and NSRS Sufficiency 4. Intra-Hour Resource Monitoring

1. Renewable Forecast and Extreme Weather Monitoring Reliability Risk Desk will: Monitor quality of data telemetered by intermittent resources and its accuracy in meeting the methodology outlined in ERCOT rules. Contact appropriate QSEs if needed to resolve the issues identified. Monitor the current performance of renewable forecasts. Evaluate large forecast errors and correct the forecast if warranted. Monitor the probability of experiencing large wind output ramps and the sufficiency of the available ramping capability.

2. Inertia Monitoring and RRS Sufficiency Reliability Risk Desk will: Monitor that the inertia on the system is above the Critical Level of Inertia Monitor adequacy of currently available RRS in comparison to the actual RRS requirement based on Real Time system inertia conditions. Evaluate the sufficiency of posted RRS requirement in the next 24 to 36 hour timeframe in comparison to the estimated RRS needed based on most recent COP submissions. AS Methodology Posted Minimums Less load and/or more wind Less synchronous unit commitment Less Inertia More Frequency Responsive capacity needed RRSactual-req

Forecast Risk and NSRS Sufficiency Monitoring Reliability Risk Desk will: Monitor the adequacy of scheduled resources (COPs) to cover the forecasted Load, ramp, and the uncertainty around the Load and renewable forecasts for the next 6 hours and identify hours with insufficiency Retain sufficient NSRS in every hour to cover the higher of: the current level of net load ramp risk or the amount that will be needed, based on currently expected operating conditions, to restore frequency and recover contingency reserves Net Load Forecast Error Forecasted Load

Intra-hour Resource Monitoring Reliability Risk Desk will: Monitor the short-term Load, wind and solar forecasts Intra-hour net load patterns due to load/wind/solar can be vastly different even with same hourly average values. Monitor the adequacy of available generation and reserves to cover the expected volatility in short-term net load over the next 60 minutes and identify sub-hourly intervals with insufficiency Tools for this functionality still under development

Operating Actions Implementation of new desk should be almost imperceptible to stakeholders Additional analysis and monitoring to support current activities of existing desks Type and volume of resulting operating actions is not expected to change significantly Operating Procedures are currently written to require notification of Shift Supervisor and appropriate existing desk when monitoring shows issues Informs existing decision processes If additional resources are required to cover risk, will use existing tools and processes Preference is to allow market to respond, procure additional A/S as time permits, defer RUC and only as necessary preserve reliability

Questions?