SHARE 2012 Planning Meeting 9/6/12

Slides:



Advertisements
Similar presentations
Priors Mill C.E Primary School ‘Welcome to Reception’
Advertisements

Lecture 17 – Forest remote sensing  Reading assignment:  Ch 4.7, 8.23,  Kane et al., Interpretation and topographic correction of conifer forest.
Welcome to Grade Seven ! Information for Parents & Students.
Creating a Resume. Participant will learn how to assist veteran clients to effectively communicate their abilities in the job search process. Competencies.
SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September th Sensor Update: No NRL SAR, chance of terrasar-x PI Target.
Club Leadership Meeting September 1, Welcome Back!
SAOA Basketball All Officials Clinic Monday, October 13, 2014 “If you’re not making mistakes, then you’re not doing anything. I’m positive that a doer.
Welcome to 5 th Grade Mrs. Rydzel’s Class. About Our Class: I strongly believe that parents and teachers working together will give each student the best.
May 13, July 1, plans pulled for review (you will not be able to access the system during this time) 2. July 30, 2010 – plans will be.
1 Civil Air Patrol United States Air Force Auxiliary …performing Missions for America.
Using Mobile GIS to Populate a Spectral Database Kenneth Smith Digital Imaging and Remote Sensing Laboratory Chester F. Carlson Center for Imaging Science.
Share 2012 David Messinger June 6, DIRS Previous Experiment /Dissemination Efforts MegaCollect 2004 – Vis-NIR-SWIR HSI (2) – LWIR HSI – high resolution.
When a Locate is needed South Dakota Law Chapter 49-7A requires that anyone who engages in any type of excavation provide advance notice of at least 48.
Case of June , Dropsonde Jet Lear Jet: (model 35A?) Ceiling: ~ 43,000 Feet (roughly 30 min to 37,000 ft.) Duration: 6 hours; option to refuel.
Welcome to IW Choir! Rebecca Schnackenberg. Choirs at IW Azure: ◦7 th grade girls Blaez ◦All boys, both 7 th and 8 th grade Argento ◦8 th grade girls.
Remote Sensing of Forest Structure Van R. Kane College of Forest Resources.
SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September th Sensor Update: No NRL SAR, chance of terrasar-x PI Target.
Welcome We now have 5 kindergarten classrooms, so please check with the teacher your child was assigned to to see if your child is now assigned to a different.
Page ADP PearsonAccess Proctor Training. Page Agenda Test Overview Testing Components Proctor Roles and Responsibilities Overview Administering the Test.
Science Camp 2016 Information Night Murrieta Elementary.
Intro to Becoming a JFG Docent
What are the responsibilities of the Support Team?
Forms to be returned! Please return them! Birth certificates.
NHS Scotland - Marketplace July 2017
“Teaching the Andes” Webinar #2, April 1st, 2017.
Reception 2017/18 Welcome Meeting.
Field Experience in Family Social Sciences
The SHARE 2012 Data Collection
The SHARE 2012 Data Collection
Florida Standards Alternate Assessment
Baltimore Summer Funding Collaborative
New Internship Meeting
Water Works.
The Company Visit Plant Visit Second Interview Site Visit Office Visit.
Dr. Marcos Esterman Faculty Guide W. Casolara Project Leader
So what can I expect when I serve on a NEASC/CPSS Visiting Team?
Welcome Families to the 2nd grade
Using the Templates in Salesforce
2017 Fall PSA PRE K INDOOR/ outdoor Soccer COACHES MEETING
The Company Visit Plant Visit Second Interview Site Visit Office Visit.
Science Camp 2017 April 3 - April 7, 2017.
Proposed Experiments:
Service-Learning.
Honor Flight 2014 Bus Program.
Senior Activities Seniors please write down this information or add it to your calendar on your phone.
Mrs. Piatt Newsletter Important Dates What We are Learning Reminders
LLA MANAGERS GUIDE How to Add a Recurring Practice 2-3
SHARE 2012 Planning Meeting 9/6/12
Mission Update: August 4, 2012
Relay for Life Team Captain Meeting 3
AgilizTech Support Desk Overview
POST HIGH SCHOOL PLANNING
Mrs. Marisa Groom 1st grade FSUS Sept. 7, 2017.
Security week June 2017 © ETSI All rights reserved.
Field Experience in Family Social Sciences
LiveWire Log in page TIPS TIPS Date of Issue: 17th Sept 2013
Health Education & Promotion Internships: Frequently Asked Questions
Sparta Business Academy & Gecu
The Breakfast Club March 4, 2016.
Medical and school externships
7th Grade Washington D.C./NYC Parent Meeting
NHS Scotland - Marketplace July 2017
Entrepreneur Discovery
Medical and school externships
Field Experience in Family Social Sciences
NSS Instrument Project Tollgate Coordinator
SAOA Basketball All Officials Clinic Monday, October 14, 2013
(team representative name here)
The Company Visit.
Presentation transcript:

SHARE 2012 Planning Meeting 9/6/12 Expected Collection Date: 1 day between September 17-25th Sensor Update: No NRL SAR, chance of terrasar-x PI Target Update: Communications: chk email & GO/NO GO Check message at 585-475-7676 Twitter 9AH_DIRS Timeline: Spectral Measurements Flag System: Team assignments: Food / Hardware Runner _______________ Radiosonde Assistant: AnneMarie and __________ ASD #1 Kelly and ________ ASD #2 RCR AnneMarie and _________ SpectraVista: John K and students Jamie/Emmett Shadow Target Deployment and __________ Erin Ontiveros & 10 T-shirt models _______ Ground Based LIDAR: Kerry and ________ Shea LIDAR targets _________ Test Target Deployment week of Sept 10-14 when John K returns Thurs/Friday Next week early pack Trailer Contact: Nina Raqueno Nina@cis.rit.edu 585-281-3846 cell Can you help? Respond to Doodle Poll

SHARE 2012 Planning Meeting Expected Collection Date: 1 day between September 17-25th Timeline: Night Before Weather Decision and Stand-by 6:00AM Final Weather Decision and CHK for email or Call in 7:00AM Meet at RIT carpool 7:45 Arrive at AVON Site 8:00-10:00 Deploy Targets 10:00 Radiosonde #1 Launch 10-11:15 Start Spectral Measurements 10:15 SIGNAL 2 HORN BLASTS - WASP to begin 10:30 AVON WASP Overflights Begin EW then NS 11:15 SIGNAL 5 HORN BLASTS Everyone under Pavilion or Tshirts in Place 11:30 AVON SpecTIR Overflights begin 12:00PM All Aircraft Clear Avon Start Conesus, Hemlock, Quarry Resume ASD Measurements & Move Targets to PM 12:00 SIGNAL 2 Sets of 3 HORN BLASTS Aircraft Clear move targets 12:30 Radiosonde #2 (plan A) 1:00-2:00 Aircraft Return to Avon Site 2:30 Radiosonde #2 (plan B) 3:00 5th Aircraft Polarmetric

SpecTIR Timeline 11:00 Launch Downtown Roc 15 min imaging ferry & coordinate w other aircraft 15 min 11:30 Avon 30 min imaging wide range of targets from bright white tyvek to black fabric panels fly FL1 & FL2 once fly short FL3 twice 12:15 Conesus Water 15 min imaging adjust gain for water target 12:45 Hemlock Forest 15 min imaging optimize for vegetation 1:15 Quarry 15 min imaging optimize for bright minerals 1:45 Avon 30 min imaging 2:15 Done 2:30 Airport

WASP/LIDAR Timeline 10:15 Launch ferry to site 10:30 - 12:00 Avon 1.5 hour imaging Center NS FL ALL EW FLS ALL NS FLS ferry & coordinate w other aircraft 15 min 12:15 Conesus Water 15 min imaging adjust gain for water target 12:45 Hemlock Forest 15 min imaging optimize for vegetation 1:15 Quarry 15 min imaging optimize for bright minerals 1:45 Avon 45 min imaging fly condensed PM FLs wide range of targets from bright white tyvek to black fabric panels 2:30 Done 2:45 Airport

Target ASD / GPS Naming System SHARE 2012 Target ASD / GPS Naming System Expected Collection Date: 1 day between September 17-25th Contact: Nina Raqueno Nina@cis.rit.edu 585-281-3846 cell Request ASD Measurements here: https://docs.google.com/spreadsheet/viewform?formkey=dERESHozUXpMeDU4ZVphdDRfY3NCQnc6MQ

A place for PI to describe measurement SUBJECT DESCRIPTION Measurement Details Ref/Rad PI Name Initial Spectra/GPS Filename: PAGRY1_F GPS/ Camera Spectra

Mode: ReFlectance (F)or RAdiance (A) 3 Letter Code for Material Volleyball Sand Reflectance Measurement Anytime OK Does not move Kelly Canham C CASND1_F Mode: ReFlectance (F)or RAdiance (A) GPS/ Camera PI last name initial 3 Letter Code for Material Measurement Number 1-9 __ Space Reserved for Measurement Retakes/Mistakes/Clouds starting with b,c,d,e,f.... Spectra AM or PM location

Mode: ReFlectance (F)or RAdiance (A) 3 Letter Code for Material New Target of Opportunity found in the field during afternoon flight Take 4 measurements in Radiance mode Kelly Canham C CPZZZ1_A Mode: ReFlectance (F)or RAdiance (A) GPS/ Camera PI last name initial 3 Letter Code for Material Measurement Number 1-9 __ Space Reserved for Measurement Retakes/Mistakes/Clouds starting with b,c,d,e,f.... Spectra AM or PM location