SWE Day- Ahead market coupling

Slides:



Advertisements
Similar presentations
Draft Cross-regional Roadmap for Day-Ahead Price Coupling NWE Day-ahead price coupling project meeting 15 June 2011.
Advertisements

1 Madrid, 2 nd Nov th IG Meeting South Gas Regional Initiative VI. MIBGAS.
1 page 1 C O U P L E D Joint TSO-PX presentation NWE Day-Ahead Price Coupling IG meeting May 9 th 2012 Copenhagen Joint Presentation from TSOs and PXs.
ERI CS REM, 11th IG meeting. Milan, 21 November 2008 Towards a single auction platform in the SW region Rafael Gómez-Elvira Deputy Director for European.
IFE-CASC long term auctions Project status Implementation Group Meeting - Lisbon,
1. Long term auction platform IFE: Progress report. Signature of the MoU and preparation of transfer of long term auctions to CASC.EU IPE: Planning for.
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3 rd December th Implementation Group meeting.
1 page 1 C O U P L E D NWE TSO Day Ahead Project NRA – TSO – PX meeting, 15 June 2011 ENTSO-E Regional Group Northwest Europe C O U P L E D.
Benoît Esnault (CRE) NW Region – governmental meeting 6 May 2010 Pilot framework guideline on capacity allocation mechanisms.
Day-Ahead Market Coupling Algorithm approval coordination NWE IG, Schipol, 28. March 2012.
Feedback on the SWE coupling Public Consultation Imeplementation Group meeting – 7th april 2014.
Draft document – Work in progress
SWE Day- Ahead market coupling 7 April 2014 Implementation Group meeting – Paris.
IFE-CASC.EU project Forum with market parties Paris – 18th June
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Paris, 1 st March th IG meeting - SWE ERI.
1 29 th April 2014 Teleconference 28 th IG Meeting South Gas Regional Initiative.
Draft Cross-regional roadmap for intraday Work in progress, for discussion 13 July 2011.
Deliverable I.4 Cross-border balancing model among TSOs -BALIT project- (7 th SG SWE, Lisbon, December 3 rd 2013)
SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid Draft.
Action for establishing a Single Auction Office for CSE Electricity Regional Initiative - Central-South Region 2 nd Stakeholders Group Meeting 21 April.
Paris, 16 th March th SG Meeting South Gas Regional Initiative.
PCR Status report AESAG, September Supported by:
SPOC meeting: Trans European Replacement Reserve Exchange Amine Abada (RTE) 07 th Nov 2013.
Parallel local initiatives – Central West electricity region and the Pentalateral Forum Mr Dominique Woitrin CREG, Belgium The Regional Initiatives: Progress.
Brief status on key on-going PCR activities NWE Regulators IG Meeting 28 Mar March 2012.
Joint IPE auction implementation and results 1 SWE IG meeting – 7 April 2014 Joint IPE auction Update on launch of long term coordinated product (CNMC.
FR-UK-IE Regional Initiative Cross-Border Balancing Procurement State of progress SG December 2008 John Prime - Claude Perret.
Madrid, 23rd July rd IG Meeting South Gas Regional Initiative.
6th Stakeholder Group Meeting Stockholm - 26 November, 2009 Gas Regional Initiative – North West Region Experience with coordinated o pen seasons Dominique.
Benoît Esnault (CRE) 17 th Madrid Forum 14 January 2010 Pilot framework guideline on capacity allocation mechanisms.
CAM PROPOSAL FOR HARMONISATION 19 th IG meeting Madrid 28 th March 2012.
COMMENTS TO THE SOUTH-WEST EUROPE ELECTRICITY REGIONAL ENERGY MARKET Draft detailed action plan version 1, 22 June 2007.
efficient capacity allocation method
2nd IMPLEMENTATION GROUP MEETING. Lisbon, 24th January 2008 Conclusions from the 3rd technical RCC.
1 15 th July 2015 Teleconference 32 nd IG Meeting South Gas Regional Initiative.
Gas Regional Initiative North West Region - Draft Framework Guidelines Capacity Allocation Mechanisms BNetzA/CRE Pre-Comitology Meeting Bonn – 26 May 2011.
Madrid, 23rd Sep th SG Meeting South Gas Regional Initiative OSP and Interoperability.
Gas Regional Initiative – North West Region Stakeholders Group meeting - London 14 November, 2008 Capacity Workshop Coordinated Open Seasons Marie-Claire.
1 page 1 C O U P L E D NWE Day Ahead Project Update FUI IG Mtg – London 13 th September 2010 ENTSO-E Regional Group Northwest Europe C O U P L E D.
CNMC and CRE intend to formally approve IFE rules 3.1 by mid-March
Joint Proposal for a Day Ahead Market Coupling Initiative between GB and Mainland by National Grid, RTE, ELIA and TENNET   Results of a joint study on.
29th November 2016 Teleconference
SWE Day-ahead market coupling (Pre- and Post-Coupling project) Lisbon, 3rd December th Implementation Group meeting.
Status of Implementation of PCR for Day-Ahead Price Coupling
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
Cross Border Intraday on the North Italian Borders Interim solution 4th Stakeholder Group Meeting Rome, 15th May 2012.
Supported by: PCR Status report AESAG, September
SWE Day-ahead market coupling (Pre- and Post-Coupling project)
NWE Day-ahead price coupling project Cost Issue
Florence Forum Multi Regional Day-Ahead Price Coupling Towards Implementation of the PCG Target Model December 10-11, 2009.
4th October 2016 Teleconference
Continuous Cross-Border Implicit Intraday Trade Status update
Third package December,
Feedback on the SWE coupling Public Consultation
Regulators’ update on Congestion Management and Balancing
NWE Day-Ahead Price Coupling
9th FUI Stakeholder Group Meeting Dublin, 16 June 2010
Trans European Replacement Reserve Exchange
Draft document – Work in progress
NORD POOL SPOT UPDATE Hando Sutter September 21st, 2012
SWE Day-ahead market coupling (Pre- and Post-Coupling project)
Supported by: PCR Status report AESAG, September
26th February 2015 Teleconference
efficient capacity allocation method
29th April 2014 Teleconference
4th October 2016 Teleconference
24th January 2017 Teleconference
29th November 2016 Teleconference
26th February 2015 Teleconference
The ESS reference metadata standards
Presentation transcript:

SWE Day- Ahead market coupling Draft SWE Day- Ahead market coupling 25 February 2014 Implementation Group meeting – Madrid

Price caps and bid caps There are no Market results price caps in MIBEL. What exists in MIBEL are limits on bid prices (currently 0-180), which do not imply limits to the Market results prices. Therefore, any bids with higher and lower prices from other countries can be matched in PCR, and any resulting Market price is accepted in MIBEL (including negative prices and/or prices higher than 180). Price caps and caps on the bids on EPEX’s side were agreed in the framework of the NWE Project based on studies and recommendations from Market Parties Market results Price cap Bid cap OMIE Not applicable 0/+180 EPEX -500/+3000

Fallback for SWE full coupling FR-ES Interconnection In case decoupling occurs, the MIBEL Day Ahead market will run independent from the rest of the Day Ahead Markets. In order to avoid any delay in the full coupling go-live date, last 3rd December the SWE NRAs decided to follow a two steps approach: “The IG agreed that market coupling is the highest priority of the SWE region in the short term and any potential delay should be avoided. In this context, NRAs support intraday allocation as fallback mechanism, only as a transitory solution, in order to avoid any delay in the launch of this project.” The full coupling is foreseen to be launched in May with Intraday allocation as a fallback transitory solution. Works for the implementation of Shadow auctions are being carried out in parallel. This implementation will require: Regulatory changes New Allocation Rules at FR-ES interconnection Updates on Spanish Operational Procedures Adaptation of High Level Regulation Contractual updates CASC Service Level Agreement RTE-REE Cooperation Agreement IT developments and testing Updates and developments of new information exchanges Communication plan towards Stakeholders Regulatory comfort for needed regulatory updates and cost recovery, when needed Regarding the allocation of Day Ahead cross zonal capacity at the PT-ES interconnection, existing MIBEL market mechanisms will apply. Possibility to perform it simultaneously with the future extension of HAR to FR-ES interconnection PT-ES Interconnection

High level planning – SWE Full coupling Version 18/02/2014 2013 2014 Dec Jan Feb March April May June July August Operational activities Testing activities Regulatory evolutions MPs training SWE Full Coupling Go live window Operators training Signed SWE contracts Procedures refinement NWE/SWE Task Force Integration testing Integration testing Simulation tests NWE test for SWE Start up solution Succesfull testing NWE / SWE tests Member tests Go live Prep Regulatory approval IFE rules Auction rules evolution Regulatory approval French I/E Rules Public consultation(s) High level Spanish regulation approval Today