Measurements of Voltage Oscillations after a Fast Power Abort in Sector 67 during the Christmas stop 2010-11 Emmanuele Ravaioli – TE/MPE Thanks to A. Verweij,

Slides:



Advertisements
Similar presentations
CHAPTER 3: SPECIAL PURPOSE OP-AMP CIRCUITS
Advertisements

High Speed, high common mode immunity communication interface Team May12-05 Chendong Yang Mengfei Xu Advisor: Nathan Neihart Client: RBC Medical Development.
New HV test specification for the LHC N. Catalan for the EI section.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
CLIQ Coupling Loss Induced Quench Magnet protection system for HQ test Overview 1) CLIQ system overview 2) Adding lead to pizza box 3) remote triggering.
ORNL-SNS Diagnostic Group SNS Beam Loss Monitors and HARPs Machine Protection System FDR September 11,2001 Presented by Saeed Assadi.
Proposal for measurements on RB.A81 on 1st September August 2010 Emmanuele Ravaioli Thanks to A. Verweij.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
LHC ARC Commissioning report during LS1 Agenda: VRGPE documentation (former VRJGE) Active Penning modification By-Pass Valves modification LHC ARC commissioning.
CSCM Project Powering cycle and results of the PSpice simulations Emmanuele Ravaioli Thanks to H. Thiesen, A. Verweij TE-MPE-TM
How to achieve higher redundancy of the UPS for QPS ? -The lack of redundancy concerns the supply lines from UPS to consumer but equally parts of the UPS.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Stephen Pemberton, TE/MPE-EI RB Earth Spark Investigation Initial Report. S. Pemberton, G. D’Angelo.
TE/MPE/EE J. Mourao T/MPE/EE 1 November 2012 LHC Machine Local protection Redundant Power supply (DQLPUR) & interface Module (DQLIM) progress status.
ISTITUTO NAZIONALE DI FISICA NUCLEARE SEZIONE DI MILANO LABORATORIO ACCELERATORI E SUPERCONDUTTIVITA’ APPLICATA Magnet Test LASA, INFN-Milano.
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
Proposal for FTF measurements on dipole magnets in the tunnel during the Christmas break Emmanuele Ravaioli TE-MPE-TM
1 CSCM-7TeV Powering Implementation and ELQA Third LHC Splice Review November 2012 M. Bajko, M. Bernardini, B. Bordini, k. Brodzinski, J. Casas-Cubillos,
CSCM type test: Diode Leads and Diodes Gerard Willering & Vincent Roger TE-MSC With thanks to Bernhard Auchmann, Zinour Charifoulline, Scott Rowan, Arjan.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
Power Converters and DC cablesSlide 1/.. LHC - HC review Hugues THIESEN – AB/PO Thursday, 12 May 2005 Water cooled cables warm bus bars power converter.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
1 J. Mourao (TE/MPE/CP) Enhanced DQHDS functionality  Status for 2011  Increase Magnet diagnostic capabilities  Our proposals.
MPE Workshop for LS1 / 22 & 23 Nov. 2012, G. D’Angelo TE/MPE-EE ELQA during LS1 train, Special measurements and NCs Magnet replacement: AIV Splices consolidations:
Advanced simulations of events in the RB circuit Short circuit to ground Quench of a dipole provoked by the quench heaters Emmanuele Ravaioli Thanks to.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
TE/MPE-MS MPE-TM meeting 14/06/2012, Richard Mompo Updated ELQA test procedure Co-authors: Nuria Catalan Lasheras Mateusz Bednarek Giorgio D’Angelo Richard.
Main dipole circuit simulations Behavior and performance analysis PSpice models Simulation results Comparison with QPS data Ongoing activities Emmanuele.
LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Long Pulse Klystron Modulators SML (Stacked Multi-Level) topology
AB-CO Review September Session on circuit commissioning Session on circuit commissioning Post-Mortem requirements F. Rodríguez-Mateos on behalf.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
Inner Triplet Protection Strategy LHC & HL-LHC Daniel Wollmann with Inputs from B. Auchmann, G. Ambrosio, R. Denz, P. Fessia, E. Ravaioli, F. Rodrigues.
Hardware Commissioning Review, R. Denz, 12-May Superconducting circuits: what remains to be done during hardware commissioning R. Denz AT-MEL-PM.
LHC Post Mortem Workshop - 1, CERN, January 2007 (slide 1/52) AB-CO Measurement & Analysis Present status of the individual.
Mikhail Ovsienko TE-MPE-EE
Introduction High Voltage!!.
Mutual Inductance Mutual inductance: a changing current in one coil will induce a current in a second coil: And vice versa; note that the constant M, known.
SAR ADC Input Types TIPL 4003 TI Precision Labs – ADCs
Frequency Transfer Function of a dipole What is it Why is it important How to calculate it How to model it How to measure it Emmanuele Ravaioli LHC-CM.
Status of RB circuit modeling PSpice models Simulation results: nQPS & oQPS Comparison with QPS data Ongoing activities Emmanuele Ravaioli TE-MPE-TM
LHC Hardware Commissionning
Injectors BLM system: PS Ring installation at EYETS
The LHC - Status Is COLD Is almost fully commissioned
The ELENA BPM System. Status and Plans.
Circuit-protection aspects of different preliminary magnet-design options
Consequences of warming-up a sector above 80 K
Powering the LHC Magnets
FMEA of a CLIQ-based protection of D1
MPE main activities planned for LS2
Status of ELQA equipment and related software
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Dipole circuit & diode functioning
Powering from short circuit tests up to nominal
Re-Commissioning (IST) of Electrical Systems: QPS, EE & PIC
Detailed global view on protection and detection of the circuits
Digital Control Systems Waseem Gulsher
M. Zerlauth, I. Romera 0v1.
Biosco: MV/LV prefabricated substations IEC Presentation of the standard Safety is a choice.
Hardware Commissioning
Review of hardware commissioning
Other arguments to train two sectors to 7 TeV
Hi-pot results summary
AC-Dipole Limitations and Options for its Upgrade
Presentation transcript:

Measurements of Voltage Oscillations after a Fast Power Abort in Sector 67 during the Christmas stop 2010-11 Emmanuele Ravaioli – TE/MPE Thanks to A. Verweij, F. Formenti 24 November 2010

Main goals of the measurements Understanding the behavior of the circuit during the power-converter shut down, with particular attention to the oscillations of the aperture voltages, and their difference. In each sector, about 60% of the dipoles present an unexpected behavior: during the PC shut-down, U_QSO reaches values ~5 times larger than the other magnets and than the values calculated by Pspice simulations. Assessing the voltage across the switches (after the installation of the snubber capacitor). The proposed measurements are required because the oldQPS and newQPS have a sampling frequency that is too low (200 Hz and ~1 kHz) to properly analyse the transitory. It is important to understand the unexpected behavior of U_QSO, since this issue concerns about 60% of the magnets and the analysis of the present data shows that it is not related with the electrical or physical position of the magnets, nor with the magnet and cable manufacturers, nor with the chronology of installation. Emmanuele Ravaioli

Scheme of the measurement system Point 6 Arc 67 Point 7 25 m 40 m 0.3 km 2.7 km SW8 PC A A A A A A SW1 3 Crates hosting 2x3 Isolation amplifiers AD210 Differential Probes Differential Probe :100 :100 :100 Card NI USB-6251-BNC Card NI USB-6251-BNC Card NI USB-6251-BNC 1 MS/s 1 MS/s 1 MS/s USB USB USB PC PC PC Wi-Fi Wi-Fi Wi-Fi Isolation Transformer Isolation Transformer Isolation Transformer VDSL VDSL VDSL Wi-Fi Wi-Fi Wi-Fi

Safety issues No magnet will be touched; the measurements will be performed accessing to the QPS cabling (only QPS & ElQA experts will touch the cabling). The NI card measuring the magnets will be isolated from the magnets themselves by means of insulator amplifiers. Fuses have been installed in the magnet patches, to protect the IFX cable in case of a short circuit inside the patch. The three measurement systems will be fully floating; this will be assured by insulator transformers. The full commissioning of the circuit up to 6 kA and an ElQA test are required before the tests. It is therefore important to install the equipment before the ElQA test already planned for the circuit (after January 20th ?). No ElQA test is required after the measurements (Nuria Catalan confirms), provided the items are uninstalled with the proper carefulness. All the equipment will be fully tested for 1.9 kV before the installation in the tunnel because it will have to sustain the ElQA test. Emmanuele Ravaioli

Status Persons involved All the required material is already available. In the past weeks, the material has been tested: Patches for connection to the QPS cables of the magnets (fuses added to improve safety) NI Cards Insulator amplifiers & Crates Wi-Fi modules (tested in the tunnel) Yesterday (17 November 2010) the first test of acquisition with the software-based triggering have been successfully performed. A full test of the acquisition system is foreseen in the PowerHall after the campaign for the snubber qualification. Persons involved System architecture: E. Ravaioli; G. J. Coelingh; A. Rijllart Hardware preparation & testing: E. Ravaioli; F. Formenti; Fabienne Boisier; Gaelle Dib Installation in the tunnel: E. Ravaioli; Mathieu Favre Software: Odd Oyvind Andreassen Other contributions: F. Formenti; K. Dahlerup-Petersen; N. Catalan Lasheras; B. Panev; R. Denz; G. D’Angelo; H. Thiesen; M. Solfaroli; A. Verweij Emmanuele Ravaioli

Frequency of acquisition Planned measurements Signal: Triggering Time frame ( t=0 at triggering) Frequency of acquisition Voltage range Vout of PC Software 0 s – 5 s 500 kS/s -160 V – +160 V U1 and U2 of magnet MB.B9R6 150 kS/s -10 V – +5 V U1 and U2 of magnet MB.A10R6 U1 and U2 of magnet MB.A11R6 U_RES switch pt6 +0 V – +900 V U_RES switch pt7 1.25 MS/s Assembly name Top assembly name Electrical numbering Distance from IP6 Relative distance MB.B9R6 LBBRS.9R6 # 153 331.97 ~ 25 m from MB.B10R6 MB.A10R6 LBARL.10R6 # 3 356.775   MB.A11R6 LBARA.11R6 # 4 395.84 ~ 39 m from MB.B10R6 Emmanuele Ravaioli

Planned tests A set of tests are planned in Sector 67 in order to clarify the odd behavior observed in some of the main dipoles. (Additional info: Analysis of the QSO signals after PC shut down at different current levels - ver2 ) At least four tests will be launched; in each test, the current of the RB circuit will be raised with a dI/dt = 10 A/s. When I_max is reached (while the current is still raising), the power converter will be shut down (triggered by the QPS); after 350 ms, the first switch (pt7, middle of the chain) will be opened; after another 250 ms, the second switch (pt6, close to the power converter) will be opened as well. The values of I_max in the four tests are: 1 kA, 2 kA, 4 kA, 6 kA (actually a bit below 6 kA, because the PC slows down at the end of the ramp). If there is sufficient time possibly also tests with I_max = 3 kA and 5 kA can be performed. Another set of tests with dI/dt = 0 A/s (no ramping up) would also be interesting, at the same current levels. NB: Every test above 2 kA requires a sensible time due to the cooling down of the switches. (Additional info: \\cern.ch\dfs\Users\e\eravaiol\Public\Planning of the measurements in the tunnel during Christmas stop 2010-2011\ ) Emmanuele Ravaioli

Emmanuele Ravaioli - TE-MPE Schedule of the tests Activities Time Comment Test of the equipment items Oct-Nov 2010 NI cards, isolation amplifiers, Wi-Fi modules, … Test of the acquisition software Nov 2010 Installation and testing of the equipment in the PowerHall Dec 2010 After snubber campaign is finished Installation of the equipment in Sector 67 after 7 Jan 2011 Before commissioning and ElQA! Testing of the equipment in Sector 67 Acquisition of the signals from a power supply Commissioning up to 6 kA and ElQA test of the circuit after 20 Jan 2011 Tests from the Control Room During the night Tests to be performed (FPA via QPS) Duration First check test (Ramp to 1kA, 10 A/s) 15 min Test + PM buffer receiving Preliminary data analysis (to check every signal is fine) 30 min (NI cards, oldQPS, newQPS) Ramp to 2 kA, 10 A/s Ramp to 4 kA, 10 A/s 1 h Test + PM buffer receiving + Switch cooling Ramp to 6 kA, 10 A/s 1.5 h Ramp to 3 kA, 10 A/s 45 min Ramp to 5 kA, 10 A/s 1.25 h Ramp to 1 kA, 0 A/s Ramp to 2 kA, 0 A/s  Test + PM buffer receiving Ramp to 4 kA, 0 A/s Ramp to 6 kA, 0 A/s Total time 9 h Emmanuele Ravaioli - TE-MPE

Annex Emmanuele Ravaioli

Magnet choice The three magnets have been selected based on the behavior they showed during past tests: Magnets 3 and 153 showed a U_QSO signal during the PC shut-down transitory at 2 kA bigger than that at 6 kA. Magnet 4 showed a regular behavior, but has been selected to highlight the difference as compared to the other two magnets. Besides, the three magnets are physically close each other, and this will simplify the operations and reduce the number of the required insulator transformers. Emmanuele Ravaioli

Presentation of the issue (1) Since the oscillations in the QSO signals (difference between voltage across the apertures of each magnet) are caused by a voltage wave travelling throughout the magnet string, one would expect that larger voltage waves cause larger QSO signals. On the contrary, during the PC shut down (before switch openings), some magnets present bigger values of the QSO signal at lower current (2 kA), when the voltage wave is slightly smaller. Magnet 001  Blue Magnet 154  Red Magnet 001  Blue Magnet 154  Red Emmanuele Ravaioli

Presentation of the issue (2) Looking closer to the results, one can notice that not every magnet of the string exhibits the same behavior: about half of the magnets show a smaller QSO signal at 2 kA, as one would expect, while the other half presents values 5-6 times larger. In the plots below one can observe the measurements of the same experiment shown in the previous slide: on the left only the normally-behaving magnets have been plotted; no the right only the oddly-behaving ones. Magnet 001  Blue Magnet 154  Red Magnet 001  Blue Magnet 154  Red Emmanuele Ravaioli

Max QSO before switch opening – 2 kA The PSpice model simulates well only the behavior of the ‘normal magnets’ Emmanuele Ravaioli

Max QSO before switch opening – 6 kA The PSpice model simulates well only the behavior of the ‘normal magnets’ Emmanuele Ravaioli